View allAll Photos Tagged Capacity

Goats grazing under shade on campus

HDR done by the a7, unedited. Results are ok, way better than no hdr, but found out that results are way better when I edit the raw files to have the same hdr look.

The Sustainable Global Supply Chains in South Asia Project of ILO, New Delhi, conducted the above workshop at New Delhi on 30-31, Jan.2019 at New Delhi. SEWA Group Work Presentation

 

De ASEAG in Aachen heeft 1 Mercedes-Benz Capacity in haar bezit, deze bus rijdt vast op lijn 5/45 waar ook de Van Hool dubbelgeledes dienst op doen. Op 11-01-2011 was de bus net nieuw en nog geheel effe zilver, Elisenbrunnen.

Norwood, Bronx

 

The Williamsbridge Reservoir Keeper's House is the only surviving building in New York City associated with the Bronx and Byram Rivers water system. Particularly between 1884 and 1906, this system served the critical function of supplying the burgeoning western section of the Bronx and helped the city to bridge the gap in the years between the construction of the Old and New Croton Aqueducts. The Bronx River portion of the system was constructed between 1880 and 1889, under the supervision of George W. Birdsall, chief engineer of the Croton Aqueduct in the New York City Department of Public Works.

 

The fifteen-mile Bronx River pipeline was completed in 1884, but the Williamsbridge Reservoir was not finished until 1889. The Keeper's House, located at the northeast end of the reservoir, was constructed in 1889-90 by contractor Terence A. Smith. L-shaped in plan, the two-and-a-half-story house is built of rock-faced, variegated gray-tan gneiss ashlar with smooth, speckled-gray granite trim, including keyed enframements. In 1925, when it was no longer needed, the reservoir was drained; it was later converted into a playground. The Keeper's House, after five decades as a private residence, was purchased in 1998 by the Mosholu Preservation Corp., a non-profit organization active in neighborhood improvement in Norwood.

 

DESCRIPTION AND ANALYSIS

 

The Water Suoolv of New York Citv in the Nineteenth The Bronx and Bvram Rivers Water Supply System

 

Until the mid-nineteenth century, New York City did not have an adequate and reliable source of fresh water. Citizens were forced to subsist on water from the Collect pond, various wells and pumps, and cisterns. But the serious pollution of these water sources, which were sometimes linked with diseases and epidemics, along with general civic filth and periodic fires exacerbated by lack of water, posed major problems. These were especially aggravated by the rapid growth of the population. Manhattan island, moreover, is located amidst saltwater estuaries, presenting substantial obstacles to bringing in potable water.

 

As early as 1798, several plans were advanced to divert water from the Bronx River to Manhattan, but these were not implemented. After decades of discussion, an independent Water Commission was authorized by the state legislature in 1834 to plan and construct a water system. The city finally obtained a supply of fresh water in 1842 through the gravity-fed Croton Aqueduct, which was begun in 1837 and completed in 1848. An innovative engineering achievement, an outstanding (if expensive) public works project, and one of the first major municipal water systems in the United States, the Croton Aqueduct was planned under chief engineer David B. Douglass, the leading proponent of the Croton River as water source, but built under chief engineer John B. Jervis.

 

Water emanating from the Croton River and Reservoir in Westchester County, N.Y., traveled 41 miles through an embanked tunnel, across the High Bridge over the Harlem River/ to a receiving reservoir in what later became Central Park and then to a distributing reservoir at Fifth Avenue and West 42nd Street. An additional water supply system became a municipal necessity after the Civil War with the explosion of the city's population, accompanied by the emergence of indoor plumbing and ever-increasing water usage. However, attempts were first made to increase the capacity of the water flow of the existing Croton system, and extensions were constructed. These included a new receiving reservoir in Central Park, alterations to the High Bridge, and the High Bridge Water Tower and reservoir/ A hydrographic survey of the Croton River watershed in 1857-58 resulted in plans for fourteen additional reservoirs outside the city; this plan was mostly carried out between 1866 and 1911. The (Old) Croton Aqueduct remained the city's principal source of water until 1890.

 

In 1870, the New York City Department of Public Works was established under Commissioner William M. ("Boss") Tweed, and the Croton Aqueduct came within its jurisdiction. After Tweed's conviction on various graft charges in 1873, the department was headed by Allan Campbell, who promoted a plan to utilize the Bronx and Byram Rivers as the next municipal water source. Of immediate concern was the development and water needs of the western portion of the Bronx, formerly part of Westchester County, annexed as the 23"* and 24* Wards of New York City on January 1,1874. Opponents of Campbell's plan, led by reformers in the Union League Club and others, fearing further departmental corruption, advocated a New Croton Aqueduct under the control of an independent commission. Droughts in 1876-77 and 1880-81 added to anxieties about the adequacy of the city's water. Eventually, both systems were constructed, but the more modest and less expensive Bronx and Byram plan was the first one to be implemented, due largely to strained municipal financial circumstances after the Tweed years and the Panic of 1873.

 

The proposed scheme consisted of dams and reservoirs to be built across the Byram River in Connecticut, and, in Westchester County, across the Bronx River at Kensico, and at Rye Ponds. The plan also included tapping Byram Pond and digging a channel connecting the two rivers. Construction of the Bronx River portion of this gravity-fed system began in October 1880, under the supervision of Ceorge W. Birdsall, chief engineer of the Croton Aqueduct in the Dept. of Public Works. The Bronx River pipeline, consisting of a 48-inch cast-iron pipe, began service in 1884 and carried water fifteen miles from Kensico to the site of the planned reservoir near Willi amsbridge.

 

The Bronx River portion of this water system was completed in 1889, while the Byram River portion was delayed until 1891 -97 due to complications in acquiring land. Particularlybetween 1884 and 1906, the Bronx and Byram Rivers water system served the critical function of supplying water to the burgeoning western section of the Bronx. (Part of the eastern section of the Bronx was annexed to the city in 1895, and the entire borough became part of New York City in 1898.) It thus helped to bridge the gap in the years between the construction of the Old and New Croton Aqueducts, and facilitated the rapid development of the Bronx, especially the construction of taller buildings, which needed greater water pressure. This could not have occurred without an adequate water supply.

 

The Williamsbridge Reservoir and Keeper's House " The use of the name Williams' Bridge for this area dates back to before the American Revolution. It is said to have come from John Williams, owner of a farm adjacent to the bridge carrying the Boston Post Road over the Bronx River since the late seventeenth century. A settlennt called Williamsbridge eventually grew up around the bridge and was the location of a station on the New York & Harlem Railroad in 1842. The city acquired land located to the west of the village, on a ridge called Gun Hill, for the Williamsbridge Reservoir in August 1882. This included part of the farm associated with the Valentine-Varian House (1758) and land owned by Amanda Bussing and the Estate of John Bussing.' This location is bounded by Woodlawn Centery (opened in 1865) and Van Cortlandt Park to the north, the Bronx River to the east, the Mosholu Parkway to the west, and Bronx Park to the south. The city acquired the above-nntioned parkland in 1888.

 

Though the Dept. of Public Works started plans for the reservoir in 1880, a construction contract was not signed until June 1884. The contractor was Sullivan & Moore. In September 1884, the Bronx River pipeline was finished and supplied water to the city, running under Putnam Place and terminating at the site; however, the reservoir was not completed for several more years. The (?Marter/y Rpo/ty of the Dept. of Public Works contain complaints about the slowness of the reservoir contractor's construction work and annua! cessations because of severe winter weather. The oval reservoir was surrounded by an earthen and stone embanknnt, with the bottom covered with concrete. The interior was completed at the end of 1888. As reported by Stephen Jenkins in 77tg Jfory #/vnjt (1912), "water was admitted into the reservoir on December 4,1888, and the distribution of the water to the Annexed District was begun. The reservoir has a capacity of 150,000,000 gallons when it is filled to a depth of forty fect...."' Chief engineer BirdsaH noted then that "it will take next year to complete and sod the outside bank of this reservoir, erect the necessary fences and complete the roads around same.'"* The receiving and distributing reservoir was filled and in full use by the fall of 1889, and was completed at the end of that year. The cost had been nearly $524,000.

 

Plans for a Reservoir Keeper's House, to be built of stone with a comer tower, were drawn up by architect Douglas Smyth.'* Apparently, this proposal was scrapped in favor of a less elaborate building. Plans for a two-and-a-half-story stone house, to be located at the northeast end of the reservoir, were approved by Birdsall in February 1889, and a contract was signed in March with building contractor Terence A.Smith. Construction began in September 1889, the exterior stonework was finished by March 1890, and the house was completed in June. The total cost was $8749. shaped in plan, the house is built of rock-faced, variegated gray-tan gneiss ashlar with smooth, speckled-gray granite trim, and embellished by keyed enframennts. The house originally had three wooden porches. Straightforward and massive, the stone house follows the tradition of building stone structures for both Croton Aqueducts. The Williamsbridge Reservoir Keeper's House is the only surviving building in New York City associated with the Bronx and Byram Rivers water supply system.

 

The first reservoir keeper, whose job it was to maintain and guard the reservoir, was Irish immigrant Matthew Mallahan (1834-1913), in this position from 1890 to about 1911. Mallahan came to the United States in 1875, was a Bronx hotel keeper and liquor dealer in the 1880s, and lived here with several relatives. The house also contained a first-story office for the keeper.

 

Later History

 

The Bronx and Byram Rivers water system played a brief but significant role in supplying water to New York City. Shortly after its completion, this system was surpassed by the more extensive New Croton Aqueduct. Constructed between 1885 and 1907 under chief engineers Benjamin S. Church and Alphonse Fteley for the New York City Aqueduct Commission, the New Croton Aqueduct was put into service in 1890. The Jerome Park Reservoir (1895-1906), the New Croton's receiving and distributing reservoir located to the west of the Williamsbridge Reservoir, held a much larger volume of water than the earlier one. Eventually, the capacity of New York's water supply was greatly expanded with the Catskill (1907-29) and Delaware River (1937-50s) water systems. The Old Croton Aqueduct ended service to New York City in 1955.

 

During the early twentieth century, the Williamsbridge Reservoir continued to supply a percentage of the borough's water. The Bronx and Byram Rivers watersheds were merged into the Catskill system in the 1910s. The reservoir was reduced to serve as an emergency backup system after 1919. The water supply was cut off and the reservoir was drained in 1925. After the land was transferred to the Dept. of Parks, the reservoir was converted into Williamsbridge Oval Playground, which opened in 1937 under parks commissioner Robert Moses.

 

The park served the neighborhood, known since the construction of the reservoir as Norwood, that had been developed largely with apartment buildings after 1905. Montefiore Hospital locatedherein 1913. The Reservoir Keeper's House was abandoned by the city, but plans were made in the 1930s to convert it to a branch library. However, Dr. Isaac H. Barkey, a physicist and engineer, and his wife Dorothy, interested inpurchasing the house, convinced the city to build a new library nearby and acquired the property in 1946. After five decades in residence, the Barkeys sold the house in 1998 to the Mosholu Preservation Corp. A non-profit organization established in 1981 by Montefiore Medical Center to address the problem of housing abandonment and deterioration in the ethnically diverse Norwood neighborhood, the Mosholu Preservation Corp. has been active in neighborhood improvement and publishes the Norwood Mewy community newspaper. Plans are under way to renovate the Keeper's House for use as its offices, for a local meeting facility, and a youth summer employment center. The building was listed on the National Register of Historic Places in September 1999.

 

Description

 

The Williamsbridge Reservoir Keeper's House is a two-and-a-half-story, L-shaped building constructed of rock-faced, variegated gray-tan gneiss ashlar, with smooth, speckled-gray granite trim, including the watertable, a band course terminating the second story, and keyed enframements. The rubble stone foundation is currently exposed. The roof has gables at the northern end of the front (west) elevation and at the south elevation. Fenestration is rectangular, except for a small round-arched window in each gable. Windows were originally two-over-two double-hung wood sash; these were replaced (c. 1950s) by multipane metal casements.

 

Front (west) elevation: This elevation has four bays, two tm each wing. The main entrance originally had a wood paneled door; this was replaced (c.1950s) with an historic decorative metal door from a Manhattan town house. The southernmost bay on the first story originally had a double French window (which was salvaged and is currently in storage); the opening is currently covered. There was originally a wood porch with latticework, posts, and steps; a steel mesh deck was installed (c. 1950s).

 

Rear (east) elevation: This elevation has four bays on the first story and three bays on the second story. The central entrance originally had a wood paneled door (converted into a window c. 1950s) and a wood porch with latticework, posts, and side steps. Stone steps, flanked by a stone areaway wall, lead to a basement entrance with a solid metal door (c. 1950s). North elevation: This elevation has two bays. The entrance in the eastern bay of the first story originally had a wood paneled door (the lower portion survives in part) and a wood porch with latticework, posts, and steps.

 

South elevation: This elevation has two bays on the southern end of the building, as well as one bay on the second story of the wing projecting from the northern end.

 

Roof: The roof, a replacement (c. 1950s) of the original slate roof, is covered in variegated slate shingles, with red tile ridgecap (with end finials), snow guards, and copper gutters. Originally there were two corbeled brick chimneys; the one near the southern end survives, while another at the juncture of the two wings was removed.

 

Lot: There is an original stone retaining wall along the eastern property line, with portions of a deteriorated pipe railing. A chain-link fence currently surrounds the property.

 

- From the 2000 NYCLPC Landmark Designation Report

The only "One Stop" in America with Mammoth Incubators, $46,000 egg capacity and 27 Transparent Hen incubators where you can see the daily chick development from 1st day of incubation to hatching and chicks popping from shells. 700 laying hens in cages. Antiques, Indian Artifacts, Gift Shop. 5 mi. N. of Standish on M-76 at Sterling; 1 mi. from I-75. Bring your camera.

 

R.C. O'Neil

S-59813L3-5

CAPA-004836

Last night two of pop music's superpowers came together for a pulsating night at Docklands.

 

Just over 60,000 fans crammed into an expanded-capacity Etihad Stadium to witness U2 360, the Irish superstar band's bold achievement in stadium rock.

 

But before Bono and co landed, the American hip-hop superstar Jay-Z was entrusted with opening the monster double-bill.

 

He provided U2 with a winning mix of pop-cultural prestige and commercial supremacy few acts could, and he undoubtedly widened the night's demographic. His wife, singer-actress Beyonce, however, was not to be seen.

 

Jay-Z also delivered pop hits, none better than last year's epic Empire State of Mind, which drew the night's first big singalong.

 

Still, much of his set was a little jarring for this rock-loving crowd and last night was unequivocally about U2.

 

It's not difficult to get caught up in the logistics of the U2 production - the ''claw'' is 50 metres high and carries 590 tonnes of equipment. But the stage, while vast, feels uncluttered and gives the band access to the crowd on all sides.

 

Almost miraculously, U2 delivers a sense of intimacy.

 

The sight of the four mates from Dublin, who have endured for more than 30 years together, entering the packed stadium by walking through the crowd as David Bowie's Space Oddity blasts out is genuinely thrilling. It's a nod of gratitude to fans, an acknowledgment that the quartet and their followers have stuck tight for so long.

 

Yet Bono was the irrepressible star last night. He used the elongated catwalks to strut, shadow box and spider dance through early parts of the set.

 

The U2 classics - With or Without You, I Will Follow, Where the Streets Have No Name, Sunday Bloody Sunday, Beautiful Day and One - were delivered in elaborate fashion.

Recent tracks Get On Your Boots and Magnificent were helped in part by Bono namechecking in the intro St Kilda, Richmond and Fitzroy. The gesture to Melbourne was lapped up.

 

City of Blinding Lights and Vertigo were also given fresh energy.

 

Songs regularly segued into others in almost mash-up style. Bad borrowed from All I Want Is You. And even the rain held off despite dire forecasts.

 

As for the sound, it was excellent to fair depending on where you were in the stadium.

 

''We've been doing this a while,'' Bono said. ''But we're still figuring out so much about music … Keep coming to see us, we're still pilgrims.''

 

He then spoke of a strong connection the band has with Melbourne and launched into I Still Haven't Found What I'm Looking For.

 

The band also played two new, unreleased tracks.

 

Both were strident efforts demonstrating that these rock veterans retain their hunger.

 

As if anyone at Docklands needed to be reminded last night.

 

Review from The Age

www.theage.com.au/entertainment/music/u2-live-in-melbourn...

Capacity: c.8,000.

 

Patron: Aretas IV (Aretas IV Philopatris, friend of his people), King of the Nabataeans (r.c.9 BCE-40 CE), who also built the Khazneh, the (so-called) Great Temple, Qasr al Bint Temple, and the Temple of the Winged Lions.

1956 Vauxhall Cresta

Date of first registration 01 August 1983

Cylinder capacity (cc) 2262cc

CO₂Emissions Not available

Fuel type PETROL

Export marker No

Vehicle status Tax not due

Vehicle colour MAROON

Sir William Wallace - Photograph taken from a booklet prepared by Denny of Dumbarton, courtesy of Dennis Penny. 162 ft long, 30 ft wide, 277 GRT, Capacity 500 pax/40 cars. For more information see www.queensferrypassage.co.uk

Registration 05G1319

Make MG

Model ZR

Description 105+ 04MY 3DR 04 MY Euro 3

Engine Capacity 1396

Third High-Level Capacity Development Dialogue on “Navigating the Economic Obstacle Course while Addressing Long-Term Challenges: The Role of IMF Capacity Development", chaired by IMF First Deputy Managing Director Gita Gopinath, at the International Monetary Fund.

 

IMF Photo/Joshua Roberts

28 April 2022

Washington, DC, United States

Photo ref: _JR13070.jpg

Norwood, Bronx

 

The Williamsbridge Reservoir Keeper's House is the only surviving building in New York City associated with the Bronx and Byram Rivers water system. Particularly between 1884 and 1906, this system served the critical function of supplying the burgeoning western section of the Bronx and helped the city to bridge the gap in the years between the construction of the Old and New Croton Aqueducts. The Bronx River portion of the system was constructed between 1880 and 1889, under the supervision of George W. Birdsall, chief engineer of the Croton Aqueduct in the New York City Department of Public Works.

 

The fifteen-mile Bronx River pipeline was completed in 1884, but the Williamsbridge Reservoir was not finished until 1889. The Keeper's House, located at the northeast end of the reservoir, was constructed in 1889-90 by contractor Terence A. Smith. L-shaped in plan, the two-and-a-half-story house is built of rock-faced, variegated gray-tan gneiss ashlar with smooth, speckled-gray granite trim, including keyed enframements. In 1925, when it was no longer needed, the reservoir was drained; it was later converted into a playground. The Keeper's House, after five decades as a private residence, was purchased in 1998 by the Mosholu Preservation Corp., a non-profit organization active in neighborhood improvement in Norwood.

 

DESCRIPTION AND ANALYSIS

 

The Water Suoolv of New York Citv in the Nineteenth The Bronx and Bvram Rivers Water Supply System

 

Until the mid-nineteenth century, New York City did not have an adequate and reliable source of fresh water. Citizens were forced to subsist on water from the Collect pond, various wells and pumps, and cisterns. But the serious pollution of these water sources, which were sometimes linked with diseases and epidemics, along with general civic filth and periodic fires exacerbated by lack of water, posed major problems. These were especially aggravated by the rapid growth of the population. Manhattan island, moreover, is located amidst saltwater estuaries, presenting substantial obstacles to bringing in potable water.

 

As early as 1798, several plans were advanced to divert water from the Bronx River to Manhattan, but these were not implemented. After decades of discussion, an independent Water Commission was authorized by the state legislature in 1834 to plan and construct a water system. The city finally obtained a supply of fresh water in 1842 through the gravity-fed Croton Aqueduct, which was begun in 1837 and completed in 1848. An innovative engineering achievement, an outstanding (if expensive) public works project, and one of the first major municipal water systems in the United States, the Croton Aqueduct was planned under chief engineer David B. Douglass, the leading proponent of the Croton River as water source, but built under chief engineer John B. Jervis.

 

Water emanating from the Croton River and Reservoir in Westchester County, N.Y., traveled 41 miles through an embanked tunnel, across the High Bridge over the Harlem River/ to a receiving reservoir in what later became Central Park and then to a distributing reservoir at Fifth Avenue and West 42nd Street. An additional water supply system became a municipal necessity after the Civil War with the explosion of the city's population, accompanied by the emergence of indoor plumbing and ever-increasing water usage. However, attempts were first made to increase the capacity of the water flow of the existing Croton system, and extensions were constructed. These included a new receiving reservoir in Central Park, alterations to the High Bridge, and the High Bridge Water Tower and reservoir/ A hydrographic survey of the Croton River watershed in 1857-58 resulted in plans for fourteen additional reservoirs outside the city; this plan was mostly carried out between 1866 and 1911. The (Old) Croton Aqueduct remained the city's principal source of water until 1890.

 

In 1870, the New York City Department of Public Works was established under Commissioner William M. ("Boss") Tweed, and the Croton Aqueduct came within its jurisdiction. After Tweed's conviction on various graft charges in 1873, the department was headed by Allan Campbell, who promoted a plan to utilize the Bronx and Byram Rivers as the next municipal water source. Of immediate concern was the development and water needs of the western portion of the Bronx, formerly part of Westchester County, annexed as the 23"* and 24* Wards of New York City on January 1,1874. Opponents of Campbell's plan, led by reformers in the Union League Club and others, fearing further departmental corruption, advocated a New Croton Aqueduct under the control of an independent commission. Droughts in 1876-77 and 1880-81 added to anxieties about the adequacy of the city's water. Eventually, both systems were constructed, but the more modest and less expensive Bronx and Byram plan was the first one to be implemented, due largely to strained municipal financial circumstances after the Tweed years and the Panic of 1873.

 

The proposed scheme consisted of dams and reservoirs to be built across the Byram River in Connecticut, and, in Westchester County, across the Bronx River at Kensico, and at Rye Ponds. The plan also included tapping Byram Pond and digging a channel connecting the two rivers. Construction of the Bronx River portion of this gravity-fed system began in October 1880, under the supervision of Ceorge W. Birdsall, chief engineer of the Croton Aqueduct in the Dept. of Public Works. The Bronx River pipeline, consisting of a 48-inch cast-iron pipe, began service in 1884 and carried water fifteen miles from Kensico to the site of the planned reservoir near Willi amsbridge.

 

The Bronx River portion of this water system was completed in 1889, while the Byram River portion was delayed until 1891 -97 due to complications in acquiring land. Particularlybetween 1884 and 1906, the Bronx and Byram Rivers water system served the critical function of supplying water to the burgeoning western section of the Bronx. (Part of the eastern section of the Bronx was annexed to the city in 1895, and the entire borough became part of New York City in 1898.) It thus helped to bridge the gap in the years between the construction of the Old and New Croton Aqueducts, and facilitated the rapid development of the Bronx, especially the construction of taller buildings, which needed greater water pressure. This could not have occurred without an adequate water supply.

 

The Williamsbridge Reservoir and Keeper's House " The use of the name Williams' Bridge for this area dates back to before the American Revolution. It is said to have come from John Williams, owner of a farm adjacent to the bridge carrying the Boston Post Road over the Bronx River since the late seventeenth century. A settlennt called Williamsbridge eventually grew up around the bridge and was the location of a station on the New York & Harlem Railroad in 1842. The city acquired land located to the west of the village, on a ridge called Gun Hill, for the Williamsbridge Reservoir in August 1882. This included part of the farm associated with the Valentine-Varian House (1758) and land owned by Amanda Bussing and the Estate of John Bussing.' This location is bounded by Woodlawn Centery (opened in 1865) and Van Cortlandt Park to the north, the Bronx River to the east, the Mosholu Parkway to the west, and Bronx Park to the south. The city acquired the above-nntioned parkland in 1888.

 

Though the Dept. of Public Works started plans for the reservoir in 1880, a construction contract was not signed until June 1884. The contractor was Sullivan & Moore. In September 1884, the Bronx River pipeline was finished and supplied water to the city, running under Putnam Place and terminating at the site; however, the reservoir was not completed for several more years. The (?Marter/y Rpo/ty of the Dept. of Public Works contain complaints about the slowness of the reservoir contractor's construction work and annua! cessations because of severe winter weather. The oval reservoir was surrounded by an earthen and stone embanknnt, with the bottom covered with concrete. The interior was completed at the end of 1888. As reported by Stephen Jenkins in 77tg Jfory #/vnjt (1912), "water was admitted into the reservoir on December 4,1888, and the distribution of the water to the Annexed District was begun. The reservoir has a capacity of 150,000,000 gallons when it is filled to a depth of forty fect...."' Chief engineer BirdsaH noted then that "it will take next year to complete and sod the outside bank of this reservoir, erect the necessary fences and complete the roads around same.'"* The receiving and distributing reservoir was filled and in full use by the fall of 1889, and was completed at the end of that year. The cost had been nearly $524,000.

 

Plans for a Reservoir Keeper's House, to be built of stone with a comer tower, were drawn up by architect Douglas Smyth.'* Apparently, this proposal was scrapped in favor of a less elaborate building. Plans for a two-and-a-half-story stone house, to be located at the northeast end of the reservoir, were approved by Birdsall in February 1889, and a contract was signed in March with building contractor Terence A.Smith. Construction began in September 1889, the exterior stonework was finished by March 1890, and the house was completed in June. The total cost was $8749. shaped in plan, the house is built of rock-faced, variegated gray-tan gneiss ashlar with smooth, speckled-gray granite trim, and embellished by keyed enframennts. The house originally had three wooden porches. Straightforward and massive, the stone house follows the tradition of building stone structures for both Croton Aqueducts. The Williamsbridge Reservoir Keeper's House is the only surviving building in New York City associated with the Bronx and Byram Rivers water supply system.

 

The first reservoir keeper, whose job it was to maintain and guard the reservoir, was Irish immigrant Matthew Mallahan (1834-1913), in this position from 1890 to about 1911. Mallahan came to the United States in 1875, was a Bronx hotel keeper and liquor dealer in the 1880s, and lived here with several relatives. The house also contained a first-story office for the keeper.

 

Later History

 

The Bronx and Byram Rivers water system played a brief but significant role in supplying water to New York City. Shortly after its completion, this system was surpassed by the more extensive New Croton Aqueduct. Constructed between 1885 and 1907 under chief engineers Benjamin S. Church and Alphonse Fteley for the New York City Aqueduct Commission, the New Croton Aqueduct was put into service in 1890. The Jerome Park Reservoir (1895-1906), the New Croton's receiving and distributing reservoir located to the west of the Williamsbridge Reservoir, held a much larger volume of water than the earlier one. Eventually, the capacity of New York's water supply was greatly expanded with the Catskill (1907-29) and Delaware River (1937-50s) water systems. The Old Croton Aqueduct ended service to New York City in 1955.

 

During the early twentieth century, the Williamsbridge Reservoir continued to supply a percentage of the borough's water. The Bronx and Byram Rivers watersheds were merged into the Catskill system in the 1910s. The reservoir was reduced to serve as an emergency backup system after 1919. The water supply was cut off and the reservoir was drained in 1925. After the land was transferred to the Dept. of Parks, the reservoir was converted into Williamsbridge Oval Playground, which opened in 1937 under parks commissioner Robert Moses.

 

The park served the neighborhood, known since the construction of the reservoir as Norwood, that had been developed largely with apartment buildings after 1905. Montefiore Hospital locatedherein 1913. The Reservoir Keeper's House was abandoned by the city, but plans were made in the 1930s to convert it to a branch library. However, Dr. Isaac H. Barkey, a physicist and engineer, and his wife Dorothy, interested inpurchasing the house, convinced the city to build a new library nearby and acquired the property in 1946. After five decades in residence, the Barkeys sold the house in 1998 to the Mosholu Preservation Corp. A non-profit organization established in 1981 by Montefiore Medical Center to address the problem of housing abandonment and deterioration in the ethnically diverse Norwood neighborhood, the Mosholu Preservation Corp. has been active in neighborhood improvement and publishes the Norwood Mewy community newspaper. Plans are under way to renovate the Keeper's House for use as its offices, for a local meeting facility, and a youth summer employment center. The building was listed on the National Register of Historic Places in September 1999.

 

Description

 

The Williamsbridge Reservoir Keeper's House is a two-and-a-half-story, L-shaped building constructed of rock-faced, variegated gray-tan gneiss ashlar, with smooth, speckled-gray granite trim, including the watertable, a band course terminating the second story, and keyed enframements. The rubble stone foundation is currently exposed. The roof has gables at the northern end of the front (west) elevation and at the south elevation. Fenestration is rectangular, except for a small round-arched window in each gable. Windows were originally two-over-two double-hung wood sash; these were replaced (c. 1950s) by multipane metal casements.

 

Front (west) elevation: This elevation has four bays, two tm each wing. The main entrance originally had a wood paneled door; this was replaced (c.1950s) with an historic decorative metal door from a Manhattan town house. The southernmost bay on the first story originally had a double French window (which was salvaged and is currently in storage); the opening is currently covered. There was originally a wood porch with latticework, posts, and steps; a steel mesh deck was installed (c. 1950s).

 

Rear (east) elevation: This elevation has four bays on the first story and three bays on the second story. The central entrance originally had a wood paneled door (converted into a window c. 1950s) and a wood porch with latticework, posts, and side steps. Stone steps, flanked by a stone areaway wall, lead to a basement entrance with a solid metal door (c. 1950s). North elevation: This elevation has two bays. The entrance in the eastern bay of the first story originally had a wood paneled door (the lower portion survives in part) and a wood porch with latticework, posts, and steps.

 

South elevation: This elevation has two bays on the southern end of the building, as well as one bay on the second story of the wing projecting from the northern end.

 

Roof: The roof, a replacement (c. 1950s) of the original slate roof, is covered in variegated slate shingles, with red tile ridgecap (with end finials), snow guards, and copper gutters. Originally there were two corbeled brick chimneys; the one near the southern end survives, while another at the juncture of the two wings was removed.

 

Lot: There is an original stone retaining wall along the eastern property line, with portions of a deteriorated pipe railing. A chain-link fence currently surrounds the property.

 

- From the 2000 NYCLPC Landmark Designation Report

The HOBO UX100-023 External Temp/RH data logger records temperature and relative humidity in an indoor environment with its external sensor. Ideal for monitoring occupant comfort in office buildings, tracking food storage conditions in warehouses, logging temperature trends in server rooms, and measuring humidity levels in museums.

 

•Easy-to view LCD display

•Large memory capacity

•Visual high & low alarm thresholds

•New Burst and Statistics logging modes

  

www.onsetcomp.com/products/data-loggers/ux100-023

  

High capacity business mobile phone battery,especially for Smart Phones

IMAGE INFO

- Viewpoint is looking south-south-west from the northern side lookout (1).

- This is the highest level that the water has been for quite some years.

*************************

PROCESS INFO

- Adjusted levels & sharpness using Adobe Photoshop CS Windows.

Coolbeth Takes 2009 Indy Mile Win and the Series Lead

 

Defending AMA Pro Flat Track Grand National Champion Kenny Coolbeth (No. 1 Harley-Davidson Motor Co. / Screamin Eagles Harley-Davidson) came away the big winner of the Lucas Oil Indiana Mile as Round 7 of the Grand National Twins Championship came to the Indiana State Fairgrounds in Indianapolis, Ind.

 

Screamin' Eagle backed Coolbeth led the 25-lap National wire to wire.

 

Before a near capacity crowd Coolbeth took the lead early and was so strong that by three laps into the race, the Indy Mile, for all intents and purposes, was decided.

  

This weekend's victory was Coolbeth's second National win of the year, and coupled with the points from his Dash win, the three-time Champion was propelled to a four point lead over Jared Mees (No. 21 Blue Springs Screamin' Eagle / Rogers Lake's Harley-Davidson).

  

"Everybody was fast today," Coolbeth said. "The best way to handle that is to just get out front, put your head down and try to get away. I don't worry about the points when I'm racing. If I can keep winning, the points will take care of themselves."

 

As Coolbeth pulled away a five-rider battle for second took center stage with Smith, Mees, last year's winner Chris Carr, Jake Johnson and Sammy Halbert.

 

Smith and Mees eventually pulled clear and locked in a race-long battle. Smith took second by the slimmest of margins, keeping his Championship hopes alive.

  

The race in the distance behind Coolbeth was divided into pairs. Besides the Mees / Smith duo, No. 4 Chris Carr Racing's Chris Carr, No. 14 Jake Johnson (SuperTrapp / F&S Harley-Davidson) and No. 43 Sammy Halbert (Halbert Family / Kings Kustoms) were having a great race until Carr dropped back fighting handling problems and Halbert slid down on Lap 20.

 

Carr slid three seconds back to No. 33 Memphis Shades / Parts Unlimited's JR Schnabel and the two competitors fought over fifth, with the edge going to Carr at the wire. The last dueling pair was No. 3 Joe Kopp (Latus Harley-Davidson / Screamin Eagle) and No. 17 Henry Wiles (KK Motorcycle Supply / Mike Adkins). Kopp was able to hold off a hard-charging Wiles by the end of the race.

 

Harley-Davidson of Wausau's No. 59 Willie McCoy was a lonely ninth over the Nation Cycle / Reiman's Harley-Davidson backed No. 26 Brandan Bergen.

 

The Restart

The first attempt to start the 25-lap National was short lived, as four riders quickly tangled. No. 44 Brandon Robinson, No. 69 Jethro Halbert, No. 28 Shaun Russell and Wiles were involved in a Turn 1 incident. Only Wiles was able to make the restart, riding his backup Harley-Davidson.

 

The Dash

Under the new points system, the Dash has taken on great importance, as the points garnered from the 5-4-3-2-1 bonus system can add up fast. Coolbeth was able to take the five points for the win tonight, with last year's race winner Carr finishing second. The short, four lap races are packed with action every week.

 

About the AMA Pro Grand National Championship

AMA Pro Grand National Championship is the oldest and most traditional form of motorcycle racing, tracing it's roots back to the early 1900's when young daredevils tested each other on county fairground ovals all around the United States. In 1954, the first Grand National Champion was crowned as Joe Leonard had accumulated the most points in the new series. Since then major changes have come to the series and now 55 years later the AMA Pro Grand National Championship Series will crown the 2009 Grand National Twins Champion, Grand National Singles Champion and the Grand National Pro Singles Champion.

 

Watch The Race on TV

Lucas Oil Indy Mile AMA Flat Track Grand National Event will be Telecast Nationwide on Versus.

 

The Lucas Oil Indy Mile AMA Flat Track Grand National will return the "crown jewel" of AMA Flat Track racing to Indianapolis on September 13th. The Lucas Motorsports Hour will feature the race.

 

Next Race

The series goes to the Labor Day weekend Springfield doubleheader next week, with a Short Track and Mile event on tap.

TEIGN C Damen Stan 1405

 

IMO: - N/A

MMSI: 235082804

Call Sign: MWBM9

AIS Vessel Type: Dredger

 

GENERAL

DAMEN YARD NUMBER: 503705

Avelingen-West 20

4202 MS Gorinchem

The Netherlands

Phone: +31 (0)183 63 99 11

info@damen.com

DELIVERY DATE August 2001

BASIC FUNCTIONS Towing, mooring, pushing and dredging operations

FLAG United Kingdom [GB]

OWNED Teignmouth Harbour Commission

 

CASSCATION: Bureau Veritas 1 HULL MACH Seagoing Launch

 

DIMENSIONS

LENGTH 14.40 m

BEAM 4.73 m

DEPTH AT SIDES 205 m

DRAUGHT AFT 171 m

DISPLACEMENT 48 ton

  

TANK CAPACITIES

Fuel oil 6.9 m³

 

PERFORMANCES (TRIALS)

BOLLARD PULL AHEAD 8.0 ton

SPEED 9.8 knots

 

PROPULSION SYSTEM

MAIN ENGINE 2x Caterpillar 3406C TA/A

TOTAL POWER 477 bmW (640i hp) at 1800 rpm

GEARBOX 2x Twin Disc MG 5091/3.82:1

PROPELLERS Bronze fixed pitch propeller

KORT NOZZELS Van de Giessen 2x 1000 mm with stainless steel innerings

ENGINE CONTROL Kobelt

STEERING GEAR 2x 25 mm single plate Powered hydraulic 2x 45, rudder indicator

 

AUXILIARY EQUIPMENT

BILGE PUMP Sterling SIH 20, 32 m/hr

BATTERY SETS 2x 24V, 200 Ah + change over facility

COOLING SYSTEM Closed cooling system

ALARM SYSTEM Engines, gearboxes and bilge alarms

FRESH WATER PRESSURE SET Speck 24V

 

DECK LAY-OUT

ANCHORS 2x 48 kg Pool (HHP)

CHAIN 70 m, Ø 13mm, shortlink U2

ANCHOR WINCH Hand-operated

TOWING HOOK Mampaey, 15.3 ton SWL

COUPLING WINCH

PUSHBOW Cylindrical nubber fender Ø 380 mm

 

ACCOMMODATION

The wheelhouse ceiling and sides are insulated with mineral wool and

panelled. The wheelhouse floor is covered with rubber/synthetic floor

covering, make Bolidt, color blue The wheelhouse has one

helmsman seat, a bench and table with chair Below deck two berths, a

kitchen unit and a toilet space are arranged.

 

NAUTICAL AND COMMUNICATION EQUIPMENT

SEARCHLIGHT Den Haan 170 W 24 V

VHF RADIO Sailor RT 2048 25 W

NAVIGATION Navigation lights incl towing and pilot lights

 

Teignmouth Harbour Commission

The Harbour Commission is a Trust Port created by Statute.

The principal Order is the Teignmouth Harbour Order 1924

as amended by the Teignmouth Harbour Revision Order 2003

Registration F874BJW

Make LADA

Model SAMARA 1300 L

Date of Liability 01 01 2013

Date of First Registration 06 04 1989

Cylinder Capacity 1288cc PETROL

Vehicle Status Licence Not Due

Vehicle Colour BLUE

 

This is a high capacity version of the venerable Mauser HSc (for Hahn Selbstspanner ("self-cocking hammer") Pistole, third and final design "C".) Production of the original began as World War II was breaking out in 1940. This is actually a licensed copy made for Italian police by Renato Gamba SpA. in Gardone. It has a 13-shot, double stack magazine, double action trigger and exposed, semi-shrouded hammer.

 

As this was likely a low-bid piece, Gamba cut a few corners. The wedge-shaped section of metal traditionally placed in front of the trigger guard on HSc's was omitted and the grips, typically polished wood, are plastic.

 

This was one of a few hundred surplus pistols imported a couple of years back. They came with one magazine and it's been impossible to find a spare. I did find a 10-rounder on an online gun auction, but it looked like total junk in the pictures. Definitely not worth the scalper's price the seller was asking!

Meeting in Yaoundé and Douala on the capacity building of journalists to better communicate themes relating to the environment. Yaoundé - Cameroon

Facilitators: Denis Sonwa, Senior Scientist, Agro-Ecologist - Raphael Tsanga Senior Research Officer - Edouard Essiane Mendoula, Research Assistant - Philippe Guizol, Secondary Scientist - Fai Collins.

 

Photo by Ollivier Girard/CIFOR

 

cifor.org

 

forestsnews.cifor.org

 

If you use one of our photos, please credit it accordingly and let us know. You can reach us through our Flickr account or at: cifor-mediainfo@cgiar.org and m.edliadi@cgiar.org

River Dargle Flood Defence Scheme.

These images were taken during the third week of August 2014.

 

Work is now on-going in this area of the The Slang/Dargle River, involving: -- Site preparation and mobilisation comprising sheetpile flood defence walls.

The site preparation required the removal of mature trees and vegetation along the riverbank. Section-by-section, long lengths of steel sheet piling are aligned within a frame, and then driven partially into the bedrock by crane-suspended hydraulic hammers.

 

The guys were now working to reinforce the riverside of the sheetpiling, buttressing with large boulders, and an overlay of smaller gravel. Work also started on the other side of the river, again driving sheet piles.

A new access ramp down to the riverbed was carved out to accommodate the extra pile driving. Other sub-contractors are now engaged in securing the riverbanks+sheet piles by drilling and securing rock anchors.

 

Directly under the La Vallee building, the final anchor rods angled in approx 14 meters underground before being anchored to suitably solid ground.

Elsewhere along the stretch of the riverside, where the ground was more clay based, the rods had to extend to a distance of approx 17+ metres before being anchored securely in place.

 

====================================

 

M6A-1 Casagrande drilling rig.

 

M6A-1 – Technical Data:

 

Weight :-

in working condition - 12000 kg

 

Undercarriage 2310mm width, with hydraulically adjustable steel track pads, 400mm wide

 

Deutz diesel engine type BF4M 1013C, 104Kw

 

Mast 5200mm long, rotary head stroke 4000mm

 

Rotary head type T1000 6V, max torque 13500kgm, 6 speeds up to 530rpm

 

Blocking and breakout clamps type M4/M4S, max dia 305mm (to be confirmed)

 

Handling winch type A2, 2t capacity

 

Deputy Managing Director Antoinette Sayeh talks with Sania Nishtar, Special Assistant of the Prime Minister of Pakistan on Poverty Alleviation and Social Protection, and Tanja Goodwin, Senior Country Economist for Bolivia, Chile, Ecuador and Peru, at the World Bank Group, during the Capacity Development Talk: The IMF’s Engagement on Social Protection during the 2021 Spring Meetings at the International Monetary Fund.

 

IMF Photo/Joshua Roberts

5 April 2021

Washington, DC, United States

Photo ref: JR210405.001.jpg

 

Probably one of the busiest stops along the old Northwestern Elevated, Belmont is busy on this day, even during non-peak hours, as track work north of the station created a flood of trains coming in and out. Here are Red Line #812 and Brown Line #407 boarding at Belmont. Following an enormous increase of riders in the last few decades, this stop and Fullerton underwent a major reconstruction project that increased capacity and realigned the tracks.

Focus on Eldercare's response to COVID-19

 

At the purpose when the noxious impacts of COVID-19 showed first in Wuhan, the entire city and therefore the entire of Hubei Province ground to a halt. The lockdown of Wuhan brought remarkable torment and threatening difficulties for several individual occupants therein first focus. Presently, COVID-19 represents those equivalent difficulties for individuals and social welfare frameworks all-inclusive. Especially, it tests our aggregate endeavors to believe one another, particularly the foremost defenseless among us.

 

As a populace, individuals quite 70 will generally have more fragile insusceptible frameworks and progressively fundamental conditions that obstruct their capacity to battle the infection. They're likewise sure to dwell on bunch day to day environments, nearby people. Floods of COVID-19 passings in nursing homes — first within the Seattle territory, at that time on the brink of Sacramento and now during the country — have underscored this inauspicious reality. Up until now, Californians quite 65 have made up, at any rate, a fourth of the state's affirmed instances of COVID-19.

 

Be that because it may, guidelines, especially for helping living offices, are unsafely failing to satisfy the expectations in protecting California's older folks from this infection. Luck, Gov. Gavin Newsom's plan on Aging activity, as of now ongoing, presents an opportunity to forcefully address this peril and find how to secure an enormous number of more seasoned Americans.

 

Helped living focuses are an aid to the Eldercare business and therefore the enormous corporate proprietors that currently command the market. Simultaneously, in any case, an absence of guideline and oversight of staffing levels and capabilities — particularly prerequisites for on-location doctors and much prepared clinical experts — has left the business defenseless against misuse and unfortunate results. One glaring issue that has got to be tended to: helped living focuses are directed by the state Department of Social Services rather than the Department of Public Health.

 

In any case, it helped to measure maybe a piece of social welfare and clinical consideration conveyance framework, not only a direction for living. Propelled a year ago, Newsom's plan on Aging has framed a warning advisory group, is holding open gatherings and within the fall is planned to offer a 10-year plan which will address issues from lodging and vagrancy to crisis readiness to manhandle and disrespect. The venture has made a "Value Committee" to urge a contribution from a progressively differing gathering of residents and associations, including agents of the crippled network, Native Americans and other ethnic minorities.

 

Considering the spreading coronavirus general wellbeing emerging, it's basic that the representative's plan on Aging takes on an expansive and genuine open arrangement job. We weren't bothered with elevated level clichés for tending to the wants of the old. We'd like solid arrangements, solid guidelines with implementation teeth and a guarantee to continued oversight.

 

The Age of COVID-19

 

Older people who get themselves out of the blue alone without authority over their conditions are at specific hazards for an assortment of serious, even hazardous, physical and psychological well-being conditions, including a subjective decrease. Limitations on the opportunity of development ought to be proportionate and not founded solely on age.

 

COVID-19, as different irresistible melodies, represents a higher hazard to populaces that live in nearness. This hazard is especially intense in nursing or matured consideration offices, where the infection can spread quickly and has just brought about numerous passings. About 1.5 million older people individuals live in the nursing homes in the US, barring helped living offices and different settings making nearness.

 

Twenty-three individuals kicked the bucket in a flare-up at an office in Washington State in February and March, and the US Centers for Disease Control detailed 400 additional cases in offices as of April 1. On March 31, wellbeing experts in the Grand East district of France detailed 570 passings of older people in nursing homes.

 

Older people often end up in nursing homes due to governments' inability to offer adequate social types of assistance for individuals to live freely in the network, approaches that have put millions at included danger of getting the infection as a result of their organization. Governments ought to guarantee the progression of network-based administrations with the goal that individuals don't wind up in organizations without different alternatives.

 

Expound now on the roles played via care laborers in continuing the lives of the old during that emergency, and who, however dreadful themselves, by and by remain day in and outing inside the bounds of their wards to offer fundamental consideration.

 

Care supervisor Chang, the woman in charge of the consideration laborers among whom I led my hands-on work, coordinated the change of her ward into a self-sufficient fixed of a unit of care. The passage to her floor is carefully monitored; just fundamental conveyances are permitted, for instance, nourishment and clothing. Since nobody can enter or leave the structure, the flask for the older was transformed into a dozing region for care laborers. Despite the very fact that a lot of consideration laborers have their circle of relatives to require care of, they put that piece of their life under the control of others. Care specialist Lin, whose spouse died at the start of the pandemic, did not have the chance to completely grieve his passing due to incessant understaffing at Sunlight. She came back to figure following the burial service, despite realizing that she not, at now expected to figure at Sunlight to hide her significant other's clinical costs. Lin's arrival says much regarding her promise to her calling, to her colleagues, and to the old she had come to understand so well. My examination with care laborers recommends that it's an enthusiastic association and an awareness of other's expectations that propels them to remain the end of the day in care work. This is often borne out immediately.

 

Carefully add China is often seen as being grimy and unfortunate, thanks to an excellent extension to its nearby hook up with the realistic consideration required by slight, skilled bodies. Chinese consideration laborers are for the foremost part provincial to urban transients or urban specialists laid far away from previous state-claimed processing plants. In any case, direct consideration is intricate. In any case, its unpredictability goes unrecognized, or maybe disregarded by institutional powers that organize benefits and generalize the old as bodies to chip away at, to the disregard of their social-passionate necessities. As is valid with Sunlight, things which might typically undermine the keenness of care laborers, for instance, the absence of institutional acknowledgment for his or her enthusiastic work, are required to be postponed. Care specialists are currently centered around a shared objective: ensuring the gift assistance of the older. COVID-19 propels care laborers to consider what kind of care is required and the way to offer that care. It fills in as a channel through which the elemental beliefs of care are observed. Care is about common human weakness and our intrinsic association. Care laborers at Sunlight, in their aggregate every minute of everyday endeavors to secure the older, typify this ethic through their consideration. May the respectful regard, they hold of the older in their consideration redound on them and everyone consideration laborers overall who are fighting this pandemic on the bleeding edge!

 

Like the consideration laborers at Sunlight, the laborers in numerous nations are regarded human life so that we cannot be embarrassed to return clean with the leading edge about ourselves. Salute the spearheading staff who salutes our purposeful endeavors to handle the pandemic in numerous settings around the globe, within the daylight, yet additionally to ensure that veterans are appropriately treated, took care of and washed.

 

We all hope and pray that the coronavirus will soon be controlled and subdued. And that when the crisis is behind us, that we continue the important work of protecting the elderly and other vulnerable segments of our citizenry.

 

DONATE paypal.me/pools/c/8obn2hcLVG

 

How Can I Contribute in Times of COVID-19?

 

Write your testimony about the concequences from the time of Corona virus (COVID-19). Here is a great knowledge base about the effects of the Corona virus. Thank you for your story! article-directory.org/article/717/40/Emergency-Situations...

 

CONSTANTA, Romania – An M1A2 Abrams Tank is lifted by a mobile harbor crane onto a flatcar at the Port of Constanta, June 25, 2016. Once loaded, the tank will be transported to Cincu, Romania via rail to be used in the upcoming Exercise Saber Guardian, scheduled to begin late next month. Saber Guardian is a U.S. Army Europe-led exercise, in the spirit of partnership for peace. It is designed to promote regional stability and security, while strengthening partnership capacity, and fostering trust while improving interoperability between Romania, the U.S., NATO and Partnership for Peace member nations. (U.S. Army photo by SPC Devone Collins/ 24th Press Camp Headquarters)

车辆自编号:8

车辆所属线路/公司:华南农业大学校内1号线/佳华汽车运输

车辆牌照:粤C 31048

车型:厦门大金龙 XMQ6119AGBEV1

 

Bus Register Number: 8

Route/Company: SCAU Internal Transport Route 1/Jiahua Transport

Bus License Number: Yuè C·31048

Bus Model: Xiamen Kinglong, XMQ6119AGBEV1

60degrees W12 cylinders engine

Water cooled

391kg

450 HP @1850 RPM

capacity: 24,420cc

 

Over 8000 engines built or sold in 24 countries.

Powerplant for about 35 different A/C including famous Potez 25

High capacity beam bender, roll bender,

Domenico Lombardi hosts the Seminar "Collect More and Spend Better: The Role of Capacity Development" during the 2016 IMF/World Bank Spring Meetings in Washington, D.C., with opening remarks provided by Managing Director Christine Lagarde. Panelists include Carla Grasso, Vitor Gaspar, Klaus Rudischhauser, Amadou Ba, Nancy Birdsall, and Alonso Segura. Stephen Jaffe/IMF Photo

Built: 1956, refurbished 2007

Dimensions: 140 feet length/ 22 feet beam/ 10 feet draft

Class: Luxury Class

Type: Sailing Ship

Capacity: 16 passengers

Crew: 8 crew members + 1 natural guide

-

Accommodation: 8 cabins with private bathroom, all cabins have climate controls and ample space to hang and store clothing

Facilities: comfortable salon for lectures and presentations, TV/Video system, inside and Al Fresco Dinning Areas, sundeck with lounge chairs, a resting area

Activities: walks & hikes, snorkeling, kayaking, dinghy rides, diving

Safety and navigation: all international standards of safety, ISM certified, equipped with an emergency alarm system, 2 emergency life rafts for 16 pax each, emergency life vests, fog horns, smoke detectors, and fire extinguishers, all emergency equipment, SOLAS certified

Specific feature: Sea kayaks, snorkeling gear, wetsuits, kids club.

 

+Info: www.travelgalapagosislands.com

Capacity: 3179 cm³

Output: 184 kW (250 PS) @ 6200/min

Torque: 300 Nm @ 4800/min

Top speed: > 250 km/h

0–100 km/h: 6,3 s

Powertrain: Alfa Romeo Arese V6

Dancers, Cheerleaders, Sergey Prokopiev, Konstantin Semenov, RUS, Russia, The Mall, Horse Guards Parade, Whitehall, Olympic Venue, Beach Volleyball, Olympic Park, 2012, Stadium, London, Olympics, Olympic, Summer Olympics, London 2012, regeneration, capacity, 15000, Olympic Rings, Bikini, Architect, Populous, Beach Party

 

www.london2012.com/beach-volleyball/event/men/match=bvm40...

 

en.wikipedia.org/wiki/The_Mall,_London

en.wikipedia.org/wiki/Horse_Guards_Parade

en.wikipedia.org/wiki/Venues_of_the_2012_Summer_Olympics_...

en.wikipedia.org/wiki/2012_Summer_Olympics

DSC_9043 - 4703 - HH-YB 4703 - Mercedes-Benz Citaro C2 GL CapaCity L - Hamburger Hochbahn - Hamburg, Steintordamm 09/05/25

Large capacity, waterproof, lockable, lightweight, functional...Made for the Bullitt and meant for those who need lots of carrying space w/o sacrificing function or convenience or weight.

Registration SK09LVT

Make VAUXHALL

Model VECTRA SRI CDTI 150

Date of first registration :24 April 2009

Cylinder capacity 1910cc - DIESEL

Vehicle status Tax not due

Vehicle colour BLUE

Vehicle type approval M1

The aim of this Capacity Building Seminar is to have an international exchange of information on the most successful programmes and policies supporting the establishment of effective ecosystems for social enterprises across the EU.

Use of a river bed for irrigated agriculture in an arid upland landscape in Yunnan Province, China.

 

Photo by Louis Putzel/CIFOR

 

cifor.org

 

blog.cifor.org

 

If you use one of our photos, please credit it accordingly and let us know. You can reach us through our Flickr account or at: cifor-mediainfo@cgiar.org and m.edliadi@cgiar.org

can you open the door?

 

F3+Ai Nikkor 35mm F1.4S+EPP100

Every year, all over the world, Bhakti Marga bhaktas devote the day of Gurupurnima to acknowledge, praise and thank our Gurudev. Naturally, the atmosphere at SPN was one of celebration and reverence for our Satguru, and the temple was packed to capacity.

 

This year, Gurupurnima was set between the joyous Just Love Festival and two Darshan days, so the entire week was a non-stop celebration. Gurupurnima events included the day-long traditional Bhajan Mala: 108 bhajans sung, one after the other, by country devotees from all over the world; Guru Pada Abhishekam to Gurudev's feet; a Maha Abhishekam for all the Temple deities; a play done by the children, and of course lots of singing, dancing and blessings given by our Gurudev.

 

paramahamsavishwananda.com

bhaktimarga.org

1 2 ••• 11 12 14 16 17 ••• 79 80