View allAll Photos Tagged plating

Sous chefs in action.

 

Le Méridien King Edward

37 King Street East

The Paseo de las Iglesias Phase 1 project has 3 main goals per the Bond: River Park, Ecosystem Restoration and Erosion Protection. Below is a summary of each of the final amenities in each category to be constructed onsite.

The project will provide river park pathway and amenities including 2.7 miles of paved pathway (16’ wide), 2.2 miles of DG pathway (8’ wide) and 10,305 new trees, shrubs and cacti irrigated using permanent irrigation, temporary irrigation and Dri-water irrigation methods. The water sources will be reclaimed water. With the construction of Paseo de las Iglesias the Loop will have an 8 mile continuous section on the Santa Cruz River. Amenities will also include 3 parking areas; the west side paved parking area with restroom, ramada and seating, east side paved parking and ramada, and west side equestrian staging area with dirt parking and mounting block.

 

The project will provide ecosystem restoration element including a plant pallet comprised of native species local to this part of the Santa Cruz but also sustainable for current conditions, water harvesting basins, preserve in place areas for vegetation and habitat, and special habitat structures like lizard habitat and raptor perches. Additionally, Lizard and amphibian salvage to be performed by RFCD though subcontract to Dr. Rosen at U of A. RFCD contracted with Dr. Rosen to collect and monitor lizards in a fenced off area off Cottonwood Lane south of the Community Garden. The fence has been constructed by Dr. Rosen and lizard catching is in progress. Other amphibians will also be salvaged for later release. This will be treated as a do not disturb area during construction. The focus of the restoration work will be improvement to Mesquite Circle Pond which is home to 9 unique and special interest native species and one of the jewels of urban Tucson herpetological community.

 

The project will provide erosion protection including 1.4 miles of new soil cement bank protection, 0.4 miles of gabion bank protection, and additional methods such as rip rap, rock plating and terracing.

In addition to the decorative elements designed by the landscape architect there will be Public Art elements. With the assistance of the Tucson Pima Arts Council, we selected public artist Andy Dufford. He has been working on an entry monument and ramada for the project site. We have also been working with Las Artes, a local Arts and Education center, on a tile mural at the restroom.

 

During the design process our individual Section 404 permit was obtained from the Army Corps of Engineers, cultural resources mitigation was performed and letter of clearance issued from SHPO, Intergovernmental Agreement obtained with from the City of Tucson regarding property within the project area and permits with ADOT applied for. A cultural resources/archeological Phase I, Class III study was completed. The study was conducted to the current standard and determined the extent of archeological resources on site. Based on the results from the study a mitigation plan was created to determine and plan for the extent of the impacts of the project and the necessary remediation. Additionally, a goal of the project is to create signage for a segment the proposed pathway to represent the Juan Bautista de Anza National Historic Trail along the west bank of the Santa Cruz River that commemorates the 1775-1776 expedition and the historic Paseo de las Iglesias Trail.

The 2010 CMC exam at The Culinary Institute of America

The 2010 CMC exam at The Culinary Institute of America

NiTEC specialise in electroless nickel plating and metal finishing, including plating stainless steel, plating copper and its alloys, and plating aluminium alloys. We also provide heat treatment services.

To copper plate an item, a layer of copper is deposited using an electric current. Bright copper plating can also be used decoratively as well as for functional purposes. Copper plating gives a highly polished copper-pink appearance.

James Beard Awards 2012 at Alice Tully Hall at Lincoln Center, NYC

 

The Wandering Eater | Twitter

 

© 2012 Tina Wong; The Wandering Eater. All Rights Reserved. Images may not be reproduced, copied, or used in any way without written permission.

A Cajun Shrimp Alfredo with fresh parsley.

 

Untouched, raw footage

Road bling.

Now to put it back together, and get the color in.

British Culinary Federation / Brakes Student Challenge Cook & Serve Competition 2012

Tuesday 24 April 2012

Stratford-upon-Avon College

Photos from the "Starters and Desserts" course at Tallinn Service School. Photo for Nami-nami food blog.

Fotod Tallinna Teeninduskooli kursuselt "Eel- ja järelroad". Foto Nami-nami retseptikogu jaoks.

Sharing a couple of apple beignets.

----------

Inside Degustation.

To copper plate an item, a layer of copper is deposited using an electric current. Bright copper plating can also be used decoratively as well as for functional purposes. Copper plating gives a highly polished copper-pink appearance.

Test of plating set ups for Cornish game hen shoot.

NiTEC’s diffused nickel plating process is the highest standard for corrosion resistance via the plating process.This method of nickel plating is so resistant to corrosion that it is suitable for marine environments. Mild steel plated using the diffused nickel plating process can be given a 30 year sub-sea guarantee.

1 2 ••• 22 23 25 27 28 ••• 79 80