View allAll Photos Tagged constructionwork
Nederland, Zuid-Holland, Botlek, 28-09-2014; Functioneringssluiting Hartelkering. De waterkering in het Hartelkanaal wordt een maal per jaar, voordat het stormseizoen begint, getest. Tijdens het sluiten van de kering ligt alle scheepvaartverkeer naar de Rotterdamse haven stil.
De kering, onderdeel van de Deltawerken, vormt samen met de Maeslantkering de Europoortkering en beschermt Rotterdam en achterland bij extreme waterstanden.
Port of Rotterdam. Aerial view of one of the two storm surge barriers. This barrier, the Hartelkering in the Hartel canal, is tested once a year together with the greater nearby Maeslant barrier (in the New Waterwy),
During the so-called functioning closure, taking place one a year before the storm season begins, the waterway and canal, leading to the Port of Rotterdam, are closed.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
Construction of 7 blocks of 30-storey residential blocks comprising of studio apartments, 3 and 4 room flats by the Housing and Development Board (HDB) between Telok Blangah Heights and Telok Blangah Street 31.
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt und sind inzwischen abgeschlossen; jetzt ist die Gegenrichtung dran.
Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
Inzwischen gibt es Veröffentlichungen, die als Endtermin für die Bauarbeiten das Frühjahr 2015 bzw. September 2015 nennen. Mal sehen was dann stimmt!
Sollten Sie doch noch bis zum 20. Dezember 2014 fertig werden?
Melody and I often pass the corner of Hudson Avenue and Newhall Street on our way to either our credit union or a major postal facility. We had been recording the progress of the painting of the mural for some time. On this particular Wednesday mid morning we stopped to shoot the mural in its final stages. An added bonus was the preparing of this corner in the foreground for upgrade. After I captured this image of the overall area, I went across to the following corner and chatted briefly with the muralist. Her name is Briana Fleming and you can see a photo in the following slide of her atop her ladder while she painted the final strokes of her mural.
Nederland, Gelderland, Gemeente Arnhem, 30-09-2015; IJsselkop, splitsing van het Pannerdensch Kanaal (uitloper van de Rijn) in Neder-Rijn en IJssel. Schip is bezig van IJssel naar Nederrijn te keren. Rechts de uiterwaarden van de Hondsbroeksche Pleij bij Westervoort.
Division of river Rhine in Lower Rhine and IJssel.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
What is going on here? Well, these are temporary supports which are needed when the remaining old trusses of the monorail right-of-way are being taken down and new ones are set up. This is part of a huge renovation project which started in 1995. The complete infrastructure of the 13.3 km long monorail line had to be replaced after 100 years of service. About 95% of this undertaking have already been finished. As of July 2012 the dismantling and reconstruction of the eastern terminus of the line has begun. This includes the renewal of the train shed with the storage sidings. The shed will be replaced by a modern construction which will be designed more or less in the traditional style. It will be much longer than the existing hall.
OLYMPUS DIGITAL CAMERA
Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.
Nederland, Flevoland, Almere, 10-10-2014; knooppunt Almere, A6 en A27 met de Olifanten van Almere, kunstwerk van Tom Claassen.
Almere junction with Almere Elephants (artwork).
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
Construction work in progress for the 38-storey residential block comprising 175 units of 3 and 4-room flats with integrated commercial facilities located on the lower floors by Housing and Development Board (HDB).
VERGA Attachments- Truly International in Custom Built Attachments, We are world's most trusted brand for Custom Built Attachments.
VERGA Attachments has been operating for more than a decade & exporting attachments of international standard to over 70 customers in 5 continents. We have been establishing our markets & successfully exporting to: Europe | North America | Australia | New Zealand | Africa | Middle East | Latin America.
Our Major Customers-
JCB, Caterpillar, Tata Hitachi, Takeuchi, Volvo, Komatsu, Toyota, John Deere & Other Top OEM's
Our Major Products Include-
Excavator Attachments | Skid Steer Attachments | Loader Attachments | Buckets | Hitches | Quick Couplers | Grapples | Pallets Fork Frames | Rippers | Tree Shears | Thumbs | Snow Ploughs | Custom Built Attachments.
For more info,
Visit our website - www.verga.biz
Email - info@verga.biz
#Attachments #Excavator #ExcavatorAttachments #ExcavatorBuckets #HeavyEquipments #Skidsteer #Skidsteerattachments #loader #loaderattachments #construction #constructionattachments #excavators #digbucket #couplers #trenchbucket #couplers #loaderbackhoe #maskinredskap #wheelloader #skidloader #tractor #forklift #vårvisning #grävskopa #grävskopor #diggingbucket #graveskuffe #pallgafflar #pallegaffel #palletforks #cablebuckets #tractor #attachment #construction #ballinonabucket #case #caterpillar #doosan #hitachi #hyundai #JCB #Johndeere #mybrandbuckets #mydesignbuckets #bucketsinmylogo #yourlogobuckets #constructionwork #earthmovers #worktools #machineryattachments #skidsteerloader #farmequipment
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt und sind inzwischen abgeschlossen; jetzt ist die Gegenrichtung dran.
Vor vielen Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
Damit niemand mehr die Terminüberschreitung merkt, wurde Mitte März 2015 das Baustellenschild wieder entfernt!
Inzwischen gibt es Veröffentlichungen, die als Endtermin für die Bauarbeiten das Frühjahr 2015 bzw. September 2015 nennen. Mal sehen was dann stimmt!
Die „Deutsche Bahn AG hat natürlich nicht den Termin geschafft, denn bis zum späten April 2015 sind die Bauarbeiten immer noch nicht beendet! Aber vielleicht warten „Sie“ ja auf die Beendigung der Bauarbeiten im alten „Nordsüd-S-Bahntunnel“ am 3. Mai 2015, um dann alles zusammen wieder freizugeben?!
Travaux sur le réseau électrique.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Waiting some time to shunt back and forth with the empty cars.
The railway line I use is closed over the weekend due to track replacement work in one of the single track sections.
When the construction work was on its way during summer 2007 a platform was erected high above Kaiserstraße. It provided additional space for the storage of construction material and tools. On top of that it protected bicycle riders, pedestrians and car drivers from being hit by any falling material.
Some months back, Parks and Recreation sponsored a contest to find out which shade would be good for this part of Grand Park. The biggest vote went to a series of large paper airplanes. I had thought work would soon start after the winning design was announced, and we would have some nice shade during lunch on our famously hot summer days. Nope. Now that we are leaving the official summer season (autumn in three weeks), work is now only beginning on the project. The frame was set in place on Friday before Labor Day. I got this photo before eight in the morning, while we had some uncharacteristically overcast weather -- uncharacteristic from southern California standards.
A medical examination which includes a blood test and an x-ray is necessary to obtain a visa on top of the borrowed 12,000 Drhs (4,800 euros) already disbursed. They feel they cannot go back home as long as they haven't reimburse this amount.
Nederland, Gelderland, Gemeente Arnhem, 30-09-2015; IJsselkop, splitsing van het Pannerdensch Kanaal (uitloper van de Rijn) in Neder-Rijn en IJssel. Schip is bezig van IJssel naar Nederrijn te keren. Rechts de uiterwaarden van de Hondsbroeksche Pleij bij Westervoort.
Division of river Rhine in Lower Rhine and IJssel.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
Construction of the pathway linking Resorts World Sentosa (RWS) in the north to the island's beaches in the south are in progress.
Construction de l'ensemble immobilier L’Écrin des Jardiniers comprenant 2 bâtiments collectifs pour 64 logements, 6 maisons individuelles ainsi que 71 places de stationnement construits sur le site de l'ancienne maison de retraite Notre Maison.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : 52, rue des Jardiniers
Fonction : Logements
Construction : 2020 → 2022
• Architecte : Alain Casari
• Gros œuvre : Wig France
PC n° 54 395 19 R0021 délivré le 11/07/2019
Niveaux : R+5
Hauteur : 16.72 m
Surface de plancher : 4 888 m²
Superficie du terrain : 6 347 m²
Демонтаж зданий, сооружений и производства, выполненный в рамках модернизации завода «Первомайский» в Новороссийске, выполненный специалистами "Размах-Юг" в 2014 году
Заказчиком выступило ОАО «Новоросцемент»
- старейшее и одно из наиболее крупных в РФ предприятий-производителей цемента.
На фотографии запечатлен процесс демонтажа барабанной печи. Барабанная вращательная печь имеет форму горизонтально расположенного цилиндра диаметром 1,2…5 м и длиной 18…200 м.
Construction de 3 bâtiments comprenant 220 logements étudiants sur le site de la Résidence Universitaire Placieux. Ce projet remplace le bâtiment n°3 qui avait été construit en 1973.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Villers-lès-Nancy (54600)
Quartier : Placieux-Val
Adresse : 39, boulevard Maréchal Lyautey
Fonction : Logements étudiants
Construction : 2018 → 2020
► Architecte : Rolf Matz Architecture
► Gros œuvre : Bouygues Bâtiment
PC n° 54 578 17 R0012 délivré le 30/08/2017
PC modificatif n° 54 578 17 R0012 M01 délivré le 07/07/2020
Niveaux : R+5
Hauteur : 15,28 m
Surface de plancher : 6 485,7 m²
Surface du bâtiment à démolir : 6 527 m²
Superficie du terrain : 7 787 m²
A 60's 70's conrete 25 storey (ish) office block rising up above the new shard development and London Bridge Underground station, which was at the time, having a full on terror scare (not us!), walking around looking at possible things on the shard site we spotted a nice opportunit so took it.
It made for a nice new high view up into central london & the city.
All shot on kodak portra 160NC (my fav, can you tell?).
Not the tallest of towers, but gave great views.
a camera team from WDR (local broadcasting station) is on location taking scenes for a report of a WWII bomb found in the ground of a school. During defusing the traffic was stopped and the nearest buildings had been cleared and the people evacuated.
The following photo was taken twelve hours later at almost the same place.
Different jobs and different times of work.
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt und sind inzwischen abgeschlossen; jetzt ist die Gegenrichtung dran.
Vor vielen Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
Damit niemand mehr die Terminüberschreitung merkt, wurde Mitte März 2015 das Baustellenschild wieder entfernt!
Inzwischen gibt es Veröffentlichungen, die als Endtermin für die Bauarbeiten das Frühjahr 2015 bzw. September 2015 nennen. Mal sehen was dann stimmt!
Die „Deutsche Bahn AG hat natürlich nicht den Termin geschafft, denn bis zum späten April 2015 sind die Bauarbeiten immer noch nicht beendet! Aber vielleicht warten „Sie“ ja auf die Beendigung der Bauarbeiten im alten „Nordsüd-S-Bahntunnel“ am 3. Mai 2015, um dann alles zusammen wieder freizugeben?!
Idle construction works for coastal protection in Niendorf (Ostsee), municipality Timmendorfer Strand, district Ostholstein, Schleswig-Holstein, Germany.
Due to the snowy weather the construction works had to pause nearly throughout the whole winter.
Cardinal Place, Victoria. The site itself actually consists of three buildings covering an enormous space of over million square feet. The £200 million development was built directly over the District and Circle line underground tunnels which amazingly actually pass through the basement. The buildings rest on rubber shock absorbers to avoid vibrations from the train upsetting shoppers and their retail therapy.
It looked like this on Monday, July 27. The help and information desk is empty of files and books and is ready for demolition. The new desk will be to the left of this photo. Anyway, despite the dust and noise, people (like me) are still able to go into the library and use their facilities and check out books, DVDs, CDs, VHS tapes and audio books.
Oh, and the clock stopped working some time back. I shot this at two in the afternoon. The library never opens until ten in the morning, one in the afternoon on Sundays.