View allAll Photos Tagged constructionwork

Construction of 7 blocks of 30-storey residential blocks comprising of studio apartments, 3 and 4 room flats by the Housing and Development Board (HDB) at Telok Blangah Street 31 will be completed by 4th Quarter 2017.

Construction d'un bâtiment à usage de commerce à la place d'anciennes concessions à Laxou.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Laxou (54520)

Quartier : Plateau de la Sapinière

Adresse : 21, avenue de la Résistance

Fonction : Commerces

 

Construction : 2021

PC n° 54 304 18 00019 délivré le 01/12/2020

 

Hauteur : 7.00 m

Surface de plancher : 1 460 m²

Superficie du terrain : 10 880 m²

Construction of 7 blocks of 30-storey residential blocks comprising of studio apartments, 3 and 4 room flats by the Housing and Development Board (HDB) between Telok Blangah Heights and Telok Blangah Street 31.

Construction of 7 blocks of 30-storey residential blocks comprising of studio apartments, 3 and 4 room flats by the Housing and Development Board (HDB) between Telok Blangah Heights and Telok Blangah Street 31.

Keski-Pasila consstruction work 2015

Travaux de voirie boulevard du 21E Régiment Aviation et boulevard Lobau à Nancy.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Sud / Nancy Centre

Adresse : boulevard du 21E Régiment Aviation / boulevard Lobau

Poids en ordre de marche : 25 000 kg

 

Chantier de réhabilitation des bâtiments 001 et 003 de la Cité administrative – Caserne Thiry et aménagement de la place d'Armes.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Centre

Adresse : 47, rue Sainte-Catherine,

Fonction : Administration

 

Construction : 2022 → 2024

â–º Architectes : Architectures Studio

PC n° 54 395 22 N0016 délivré le 20/06/2022

 

Niveaux : R+3

Hauteur maximale : 26,95 m

Surface de plancher totale : 17 301 m²

Superficie du terrain : 46 014 m²

Construction works of PUB Water Pipeline at the former Tanjong Pagar Railway site, Keppel Road.

"And I'm far, far away

With my head up in the clouds

And I'm far, far away

With my feet down in the crowds

Letting loose around the world

But the call of home is loud

Still as loud"

- The Slade

Keski-Pasila consstruction work 2015

A tradesman is in the process of cutting cement on Chicago's State Street.

Construction works at the Gardens by the Bay along Sheares Avenue.

...closely resembles the historic structure. I took this shot when the edifice still was under construction.

The official demolition announcement of most of the "villas" at Satwa was made in October 2008 unveiling its replacement by a luxurious city-garden.

    

The area of Satwa, five minutes away from Sheikh Zayed prestigious street, is marked for razing. It is going to be replaced by Jumeirah Gardens City, a Dhrs 350 billion project.

   

Keski-Pasila consstruction work 2015

Construction of 7 blocks of 30-storey residential blocks comprising of studio apartments, 3 and 4 room flats by the Housing and Development Board (HDB) at Telok Blangah Street 31 will be completed by 4th Quarter 2017.

Closed due to construction work

Nederland, Zuid-Holland, Botlek, 28-09-2014; Functioneringssluiting Hartelkering. De waterkering in het Hartelkanaal wordt een maal per jaar, voordat het stormseizoen begint, getest. Tijdens het sluiten van de kering ligt alle scheepvaartverkeer naar de Rotterdamse haven stil.

De kering, onderdeel van de Deltawerken, vormt samen met de Maeslantkering de Europoortkering en beschermt Rotterdam en achterland bij extreme waterstanden.

Port of Rotterdam. Aerial view of one of the two storm surge barriers. This barrier, the Hartelkering in the Hartel canal, is tested once a year together with the greater nearby Maeslant barrier (in the New Waterwy),

During the so-called functioning closure, taking place one a year before the storm season begins, the waterway and canal, leading to the Port of Rotterdam, are closed.

luchtfoto (toeslag op standard tarieven);

aerial photo (additional fee required);

copyright foto/photo Siebe Swart

Viewed from the temporary footbridge over the railway at Jumble Lane crossing which is closed to traffic until building work has been completed.

It's only 50 years since they started the last major redevelopment in Barnsley. Just goes to show that they don't build things to last these days, unlike the Town Hall.........now that's a proper building!

Construction of the third metro line of Nuremberg.

Philosophikal Tools:

 

Series about Dualism.

Visualization of the kantian "Things-it-self" - some Tools of Artists, Thinkers, Poets and Philosophers...

Simple eidetik Way to illustrate what has Rodins Thinker in his Head.

 

If you like Photos & Thoughts kombined,

may you´ll like to join PhotoPhilosophy

   

©1999-2008 all Rights reserved, Krystian

Poids en ordre de marche : 22 100 kg

 

Construction de l'ensemble immobilier Le RE/NOUVEAU comprenant 26 logements.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Est

Adresse : 21-23, rue Victor

Fonction : Logements

 

Construction : 2021 → 2022

â–º Architecte : Alain Casari

► Gros œuvre : Dalla Costa

PC n° 54 395 19 R0078 délivré le 17/02/2020

 

Niveaux : R+5

Hauteur : 18.27 m

Surface de plancher : 1 734 m²

Superficie du terrain : 859 m²

Dernière tranche de l'aménagement du contournement de Malzéville entre la rue Pasteur et le viaduc Louis Marin.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Villes : Malzéville (54220) / Saint-Max (54130)

 

Durée des travaux : 2020 → 2021

Inauguration : 18/12/2021

Nederland, Zuid-Holland, Nieuwe Waterweg, 28-09-2014; Functioneringssluiting Maeslantkering. De waterkering in de Nieuwe Waterweg wordt eenmaal per jaar, voordat het stormseizoen begint, getest. Tijdens het sluiten van de kering ligt alle scheepvaartverkeer naar de Rotterdamse haven stil.

De Maeslantkering sluit normaal gesproken alleen bij dreigende stromvloed en bij een waterstand van 3 meter of meer boven NAP. De kering, onderdeel van de Deltawerken, vormt samen met de Hartelkering de Europoortkering en beschermt Rotterdam en achterland bij extreme waterstanden.

Hoek van Holland - Port of Rotterdam. Aerial view of the new storm surge barrier (Maeslantkering) in the Nieuwe waterweg during the so-called functioning closure, taking place one a year before the storm season begins. The waterway, leading to the Port of Rotterdam (at the horizon), is closed during the test.

luchtfoto (toeslag op standard tarieven);

aerial photo (additional fee required);

copyright foto/photo Siebe Swart

Fra venstre: Gunvald Byrkjedal, Ommund T. Gilja, Sverre Øvstebø, Bernhard Gilja og Ommund S. Gilja

Construction d'une résidence étudiante de 156 logements.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Vandœuvre-lès-Nancy (54500)

Quartier : Vélodrome

Adresse : avenue du Général Leclerc

Fonction : Logements étudiants

 

Construction : 2024 → 2025

â–» Architecte : Olivier Bourbon Architecte

PC n° 54 547 22 R0018 délivré le 23/03/2023

 

Niveaux : R+5

Hauteur : 17,37 m

Surface de plancher : 3 776 m²

Superficie du terrain : 1 758 m²

Just seconds later the machine started working in its own style of motion and ruttling.

 

Another three shots from the track replacement work between Zürich Binz and Zürich Giesshübel.

Det gamle skolehuset midt på bildet. Arbeidsgjeng foran

Keski-Pasila consstruction work 2015

"No work today so I will eat a little and then go to bed" says Otul. When asked whether he can still send money home, the answer comes up as an evidence: "I have to manage otherwise, what am I here for?"

   

Berlin. 2013.

 

"East Side Gallery Retten - Wall Parade"

 

Dr. Motte.

 

Thorsten Strasas. - Demotix. - Seconds2Real.

1 2 ••• 24 25 27 29 30 ••• 79 80