View allAll Photos Tagged constructionwork

Fra venstre: Gunvald Byrkjedal, Ommund T. Gilja, Sverre Øvstebø, Bernhard Gilja og Ommund S. Gilja

"No work today so I will eat a little and then go to bed" says Otul. When asked whether he can still send money home, the answer comes up as an evidence: "I have to manage otherwise, what am I here for?"

   

Keski-Pasila consstruction work 2015

Nederland, Zuid-Holland, Nieuwe Waterweg, 28-09-2014; Functioneringssluiting Maeslantkering. De waterkering in de Nieuwe Waterweg wordt een maal per jaar, voordat het stormseizoen begint, getest. Tijdens het sluiten van de kering ligt alle scheepvaartverkeer naar de Rotterdamse haven stil. Foto richting Noordzee. De Maeslantkering sluit normaal gesproken alleen bij dreigende stromvloed en bij een waterstand van 3 meter of meer boven NAP. De kering, onderdeel van de Deltawerken, vormt samen met de Hartelkering de Europoortkering en beschermt Rotterdam en achterland bij extreme waterstanden.

Hoek van Holland - Port of Rotterdam. Aerial view of the new storm surge barrier (Maeslantkering) in the Nieuwe waterweg during the so-called functioning closure, taking place one a year before the storm season begins. The waterway, leading to the Port of Rotterdam (at the horizon), is closed during the test.

luchtfoto (toeslag op standard tarieven);

aerial photo (additional fee required);

copyright foto/photo Siebe Swart

Format: Glassnegativ, storformat

Dato / Date: 1888

Fotograf / Photographer: Erik Olsen (1835 - 1920)

Sted / Place: Theisendammen, Trondheim

 

Wikipedia: Theisendammen

 

Eier / Owner Institution: Trondheim byarkiv, The Municipal Archives of Trondheim

Arkivreferanse / Archive reference: Tor.H42.B55.F3943

 

Merknad: Theisendammen er en dam i Ilavassdraget, bygd eller oppført på slutten av 1700-tallet av kanselliråd Simon Lorentz Thaysen, som ønsket å sikre sitt møllebruk vanntilførsel. Den 27 mai 1791 brøt den sammen og gjorde stor skade på Ilavassdraget. Fra 1889 brukte vannverket den som vanninntak, men er i dag bare en reservedam med en kapasitet på 2,2 mill. m3 per år.

Den har hatt forskjellige navn opp gjennom årene, Nedre Kobberdammen, Mølledammen, og Bagersætherdammen. I dag brukes den til sportfiske av ørret, gjedde og mort.

 

Bratberg, Terje T. V.: Trondheim byleksikon (Oslo 2008) s. 536.

Cracow - renewal works at St. Gertruda Street and Stradomska Street junction

The area of Satwa, five minutes away from Sheikh Zayed prestigious street, is marked for razing. It is going to be replaced by Jumeirah Gardens City, a Dhrs 350 billion project.

   

Constructruction work on reclaimed land, Central, Hong Kong

Réhabilitation de deux collecteurs d'assainissement à Nancy.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Centre

Adresse : rue du Préfet Claude Erignac / rue Pierre Fourier

 

Durée des travaux : mars 2021 → juin 2021

Det gamle skolehuset midt på bildet. Arbeidsgjeng foran

Construction at the Interstate 10/Highland Avenue interchange.

 

©Louisiana DOTD/Owen Murphy

 

We spoke about renewable Energy today. The Problem we point out is, that the whole modern Diskussion to the very important Theme has lost the straight Direktion. Everybody is happy about beeing natural grounded, open minded - just korrekt and a good Guy...

Is this it? What about the advantageous Deeds, make the first Steps, quitting the Kars or some Kommitment for the long known Alternatives - Wind, Solar, Waterpower... You must not save the World, play the Hero or be an Angel - the right Thoughts or AKTions in our Everydaylife would be enough. So I start by asking Myself:

What have I done for all that?

The Answer is easy...

Construction work for some improvements at Terminal 1-B in Frankfurt airport.

Construction of the third metro line of Nuremberg.

Construction of a new resort in Sentosa. Taken from the cable car

Trams will soon be online. More than 2 years late and way over budget (close to £1b).

There is a lot of construction work ongoing in Singapore. You turn the corner and there would be a cordoned off section where there would be some sort of construction work ongoing, and a crane hanging over the entire area. This was a photo of a lot of work happening right in front of a high rise building, with the section having been cordoned off and a lot of machinery in the site including cranes and bulldozers and construction material lying all around.

Format: Glassnegativ, storformat

Dato / Date: 1888

Fotograf / Photographer: Erik Olsen (1835 - 1920)

Sted / Place: Theisendammen, Trondheim

 

Wikipedia: Theisendammen

 

Eier / Owner Institution: Trondheim byarkiv, The Municipal Archives of Trondheim

Arkivreferanse / Archive reference: Tor.H42.B55.F3941

 

Merknad: Theisendammen er en dam i Ilavassdraget, bygd eller oppført på slutten av 1700-tallet av kanselliråd Simon Lorentz Thaysen, som ønsket å sikre sitt møllebruk vanntilførsel. Den 27 mai 1791 brøt den sammen og gjorde stor skade på Ilavassdraget. Fra 1889 brukte vannverket den som vanninntak, men er i dag bare en reservedam med en kapasitet på 2,2 mill. m3 per år.

Den har hatt forskjellige navn opp gjennom årene, Nedre Kobberdammen, Mølledammen, og Bagersætherdammen. I dag brukes den til sportfiske av ørret, gjedde og mort.

 

Bratberg, Terje T. V.: Trondheim byleksikon (Oslo 2008) s. 536.

Olympus OM-2m / Zukio 50/f1.4 / Fuji Provia 400X @1600

2008/4/5

神奈川県、横浜、桜木町

 

See where this picture was taken. [?]

Format: Glassnegativ, storformat

Dato / Date: 1888

Fotograf / Photographer: Erik Olsen (1835 - 1920)

Sted / Place: Theisendammen, Trondheim

 

Wikipedia: Theisendammen

 

Eier / Owner Institution: Trondheim byarkiv, The Municipal Archives of Trondheim

Arkivreferanse / Archive reference: Tor.H42.B55.F3940

 

Merknad: Theisendammen er en dam i Ilavassdraget, bygd eller oppført på slutten av 1700-tallet av kanselliråd Simon Lorentz Thaysen, som ønsket å sikre sitt møllebruk vanntilførsel. Den 27 mai 1791 brøt den sammen og gjorde stor skade på Ilavassdraget. Fra 1889 brukte vannverket den som vanninntak, men er i dag bare en reservedam med en kapasitet på 2,2 mill. m3 per år.

Den har hatt forskjellige navn opp gjennom årene, Nedre Kobberdammen, Mølledammen, og Bagersætherdammen. I dag brukes den til sportfiske av ørret, gjedde og mort.

 

Bratberg, Terje T. V.: Trondheim byleksikon (Oslo 2008) s. 536.

Another three shots from the track replacement work between Zürich Binz and Zürich Giesshübel.

Poids en ordre de marche : 26 170 - 28 340 kg

 

Travaux de renouvellement du site propre du trolley à Nancy dans le cadre des aménagements pour la ligne 1 du trolley.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Ouest

Adresse : avenue du XXᵉ Corps

Peepin' through a hole in the fence: the construction site at Polk and Hayes.

This is what parts of Parnell street looks like today [13 October 2017]

 

I live in Henrietta Place and the whole area has been a large building site for many years and at times the impact has been extreme mainly because of the Luas Cross-City Tram Project but there have been a number of other projects and programmes including the new museum in Henrietta Street [the building site was directly outside my bedroom] and the Grangegorman College Campus project. I have just discovered that a new hotel is planned for Bolton street and there may be a new apartment block at Henrietta Place.

I was crossing Vauxhall Bridge and saw this work being done. Perhaps a new landing stage is being built.

1 2 ••• 24 25 27 29 30 ••• 79 80