View allAll Photos Tagged constructionwork
Viewed from the temporary footbridge over the railway at Jumble Lane crossing which is closed to traffic until building work has been completed.
It's only 50 years since they started the last major redevelopment in Barnsley. Just goes to show that they don't build things to last these days, unlike the Town Hall.........now that's a proper building!
Series about Dualism.
Visualization of the kantian "Things-it-self" - some Tools of Artists, Thinkers, Poets and Philosophers...
Simple eidetik Way to illustrate what has Rodins Thinker in his Head.
If you like Photos & Thoughts kombined,
may you´ll like to join PhotoPhilosophy
©1999-2008 all Rights reserved, Krystian
Poids en ordre de marche : 22 100 kg
Construction de l'ensemble immobilier Le RE/NOUVEAU comprenant 26 logements.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Est
Adresse : 21-23, rue Victor
Fonction : Logements
Construction : 2021 → 2022
â–º Architecte : Alain Casari
► Gros œuvre : Dalla Costa
PC n° 54 395 19 R0078 délivré le 17/02/2020
Niveaux : R+5
Hauteur : 18.27 m
Surface de plancher : 1 734 m²
Superficie du terrain : 859 m²
Dernière tranche de l'aménagement du contournement de Malzéville entre la rue Pasteur et le viaduc Louis Marin.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Villes : Malzéville (54220) / Saint-Max (54130)
Durée des travaux : 2020 → 2021
Inauguration : 18/12/2021
Nederland, Noordoostpolder, Markenesse, 04-11-2018; Waterloopbos, voormalig Waterloopkundig Laboratorium "De Voorst" (WLV). De Deltagoot, nu kunstwerk Deltawerk // (kunstenaars Ronald Rietveld, Erick de Ly)
Waterloopbos (watercourse wood), former hydrological laboratory.
luchtfoto (toeslag op standaard tarieven);
aerial photo (additional fee required);
copyright © foto/photo Siebe Swart
Nederland, Zuid-Holland, Nieuwe Waterweg, 28-09-2014; Functioneringssluiting Maeslantkering. De waterkering in de Nieuwe Waterweg wordt eenmaal per jaar, voordat het stormseizoen begint, getest. Tijdens het sluiten van de kering ligt alle scheepvaartverkeer naar de Rotterdamse haven stil.
De Maeslantkering sluit normaal gesproken alleen bij dreigende stromvloed en bij een waterstand van 3 meter of meer boven NAP. De kering, onderdeel van de Deltawerken, vormt samen met de Hartelkering de Europoortkering en beschermt Rotterdam en achterland bij extreme waterstanden.
Hoek van Holland - Port of Rotterdam. Aerial view of the new storm surge barrier (Maeslantkering) in the Nieuwe waterweg during the so-called functioning closure, taking place one a year before the storm season begins. The waterway, leading to the Port of Rotterdam (at the horizon), is closed during the test.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
Just seconds later the machine started working in its own style of motion and ruttling.
Another three shots from the track replacement work between Zürich Binz and Zürich Giesshübel.
Fra venstre: Gunvald Byrkjedal, Ommund T. Gilja, Sverre Øvstebø, Bernhard Gilja og Ommund S. Gilja
"No work today so I will eat a little and then go to bed" says Otul. When asked whether he can still send money home, the answer comes up as an evidence: "I have to manage otherwise, what am I here for?"
Nederland, Zuid-Holland, Nieuwe Waterweg, 28-09-2014; Functioneringssluiting Maeslantkering. De waterkering in de Nieuwe Waterweg wordt een maal per jaar, voordat het stormseizoen begint, getest. Tijdens het sluiten van de kering ligt alle scheepvaartverkeer naar de Rotterdamse haven stil. Foto richting Noordzee. De Maeslantkering sluit normaal gesproken alleen bij dreigende stromvloed en bij een waterstand van 3 meter of meer boven NAP. De kering, onderdeel van de Deltawerken, vormt samen met de Hartelkering de Europoortkering en beschermt Rotterdam en achterland bij extreme waterstanden.
Hoek van Holland - Port of Rotterdam. Aerial view of the new storm surge barrier (Maeslantkering) in the Nieuwe waterweg during the so-called functioning closure, taking place one a year before the storm season begins. The waterway, leading to the Port of Rotterdam (at the horizon), is closed during the test.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
Format: Glassnegativ, storformat
Dato / Date: 1888
Fotograf / Photographer: Erik Olsen (1835 - 1920)
Sted / Place: Theisendammen, Trondheim
Wikipedia: Theisendammen
Eier / Owner Institution: Trondheim byarkiv, The Municipal Archives of Trondheim
Arkivreferanse / Archive reference: Tor.H42.B55.F3943
Merknad: Theisendammen er en dam i Ilavassdraget, bygd eller oppført på slutten av 1700-tallet av kanselliråd Simon Lorentz Thaysen, som ønsket å sikre sitt møllebruk vanntilførsel. Den 27 mai 1791 brøt den sammen og gjorde stor skade på Ilavassdraget. Fra 1889 brukte vannverket den som vanninntak, men er i dag bare en reservedam med en kapasitet på 2,2 mill. m3 per år.
Den har hatt forskjellige navn opp gjennom årene, Nedre Kobberdammen, Mølledammen, og Bagersætherdammen. I dag brukes den til sportfiske av ørret, gjedde og mort.
Bratberg, Terje T. V.: Trondheim byleksikon (Oslo 2008) s. 536.
We spoke about renewable Energy today. The Problem we point out is, that the whole modern Diskussion to the very important Theme has lost the straight Direktion. Everybody is happy about beeing natural grounded, open minded - just korrekt and a good Guy...
Is this it? What about the advantageous Deeds, make the first Steps, quitting the Kars or some Kommitment for the long known Alternatives - Wind, Solar, Waterpower... You must not save the World, play the Hero or be an Angel - the right Thoughts or AKTions in our Everydaylife would be enough. So I start by asking Myself:
What have I done for all that?
The Answer is easy...
Construction de l'ensemble immobilier Jardin Florentin comprenant 2 immeubles pour 31 logements.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Est
Adresse : 18, rue du Maréchal Victor duc de Bellune
Fonction : Logements
Construction : 2019 → 2020
▻ Architecte : Alexandre Chemetoff & Associés
PC n° 54 395 18 R0047 délivré le 18 septembre 2018
PC modificatif n° 54 395 18 R0047 M02 délivré le 23 août 2019
Niveaux : R+3
Hauteur : 14.98 m
Surface de plancher : 4 591 m²
Superficie du terrain : 4 790 m²
Construction d'un bâtiment à usage de commerce à la place d'anciennes concessions à Laxou.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Laxou (54520)
Quartier : Plateau de la Sapinière
Adresse : 21, avenue de la Résistance
Fonction : Commerces
Construction : 2021
PC n° 54 304 18 00019 délivré le 01/12/2020
Hauteur : 7.00 m
Surface de plancher : 1 460 m²
Superficie du terrain : 10 880 m²
Poids en ordre de marche : 26 170 - 28 340 kg
Travaux de renouvellement du site propre du trolley à Nancy dans le cadre des aménagements pour la ligne 1 du trolley.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Ouest
Adresse : avenue du XXᵉ Corps
Construction d'une résidence étudiante de 156 logements.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Vandœuvre-lès-Nancy (54500)
Quartier : Vélodrome
Adresse : avenue du Général Leclerc
Fonction : Logements étudiants
Construction : 2024 → 2025
â–» Architecte : Olivier Bourbon Architecte
PC n° 54 547 22 R0018 délivré le 23/03/2023
Niveaux : R+5
Hauteur : 17,37 m
Surface de plancher : 3 776 m²
Superficie du terrain : 1 758 m²