View allAll Photos Tagged constructionwork
The Consortium which constructs the Shelter above the Prehistoric Site of Akrotiri has already started removing the old roof which will be replaced by a new one... The goal is the archaeological site to be open to the public in the summer of 2011.
Der Wuppertaler Hauptbahnhof ist eigentlich ein klassizistischer Prachtbau. Es stammt aus dem Jahr 1848 und ist eines der ältesten erhaltenen Bahnhofsgebäude. Leider wurde der Bau über die Jahrzehnte durch diverse An- und Umbauten immer mehr entstellt. Jetzt läuft ein Projekt, an dessen Ende die mehr oder weniger vollständige Wiederherstellung des ursprünglichen Zustands stehen wird. Meine Fotoserie zeigt den Abbruch der 60er-Jahre-Vorbauten.
Wuppertal's main station is a classicist marvel from 1848. It is one of the oldest surviving structures of its kind. Unfortunately it has been marred by ugly additions and alterations. Right now a reconstruction project has been started. When it is finished, the historic structure will have regained its original form (more or less, that is). My photo series documents the destruction of the awning from the 1960s.
Massive construction works are going on in the city of Mumbai. As the city is always under constant pressure of searching new places for thriving population of commerce and business. Skyline of Mumbai changing rapidly than ever.Central of these real estate activity is Lower Parel a former cotton mill locality of Mumbai.
A sign on the Four Squares estate in Bermondsey, south London. Used on the Randomness Guide to London.
Travaux d'extension et de rénovation du Musée Lorrain.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : 64, Grande Rue
Fonction : Musée
Construction : 1502 → 1512
Rénovation : 2024 → 20??
▻ Architecte : Philippe Charles Dubois et Associés
Permis de construire n° PC 54 395 23 00040
▻ Délivré le 25/10/2023
Hauteur : 42,09 m
Surface de plancher : 4 524 m²
▻ Existante : 4 033 m²
▻ Supprimée : 1 023 m²
▻ Créée : 1 514 m²
Superficie du terrain : 5 205 m²
Travaux de réaménagement de la rue des Scillas en préparation de l'extension du réseau de tramway dans le quartier de Howald à Luxembourg Ville.
Le réaménagement prévoit la déviation du cours d'eau de la Drosbech avec la construction d'un ouvrage de 394 m de longueur à une profondeur comprise entre 5 et 16 m.
Pays : Luxembourg🇱🇺
Ville : Hesperange
Quartier : Howald
Adresse : rue des Scillas
Aménagements : 2020 → 2024
Massive construction works are going on in the city of Mumbai. As the city is always under constant pressure of searching new places for thriving population of commerce and business. Skyline of Mumbai changing rapidly than ever.Central of these real estate activity is Lower Parel a former cotton mill locality of Mumbai.
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt und sind inzwischen abgeschlossen; jetzt ist die Gegenrichtung dran.
Vor vielen Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
Damit niemand mehr die Terminüberschreitung merkt, wurde Mitte März 2015 das Baustellenschild wieder entfernt!
Inzwischen gibt es Veröffentlichungen, die als Endtermin für die Bauarbeiten das Frühjahr 2015 bzw. September 2015 nennen. Mal sehen was dann stimmt!
Die „Deutsche Bahn AG hat natürlich nicht den Termin geschafft, denn bis zum späten April 2015 sind die Bauarbeiten immer noch nicht beendet! Aber vielleicht warten „Sie“ ja auf die Beendigung der Bauarbeiten im alten „Nordsüd-S-Bahntunnel“ am 3. Mai 2015, um dann alles zusammen wieder freizugeben?!
This bridge from the 19th century has just been rebuilt. It will soon be reopened.
If you are interested in cameras and lenses: I took this series with an old manual focus Vivitar lens from the mid-70s (a 35mm 1:1.9 Auto Wide-Angle) on a Nikon D3000.
The bridge in the foregournd has just been rebuilt. It will soon be reopened. The monorail station (which you have to imagine just left of the bridge) is still in the process of reconstruction. When it's finished it will resemble the original structure.
If you are interested in cameras and lenses: I took this series with an old manual focus Vivitar lens from the mid-70s (a 35mm 1:1.9 Auto Wide-Angle) on a NIkon D3000.
The area around my apartment has been effectively a building site for three or four years and I am really pleased by the fact the majority of projects will be completed by the end of this year.
The major project with the biggest impact on my living environment is the Luas Cross City project but the good news for me is that the working date for opening the new route to passengers is December 9th/10th. Of course I do not know if the service it self will have unexpected negative social impacts but I am hoping that if there are any they will be more than compensated for by the positives. It would appear that property prices are increasing but as I do not wish to move this is not really relevant to me [except for an increase in property tax]
There will be two tram stops on O’Connell Street.
The GPO Stop will be located within the median of O’Connell Street Lower, north of Middle Abbey Street and will be conveniently located to provide interchange with the Luas Red Line at the Abbey Street stop. This is an important description because it contains a bit of information that might surprise some people. The common belief is that the purpose of the Cross-City was to connect the Red Line and the Green Line services but this is not actually true from a service point of view because users will need to interchange between the lines near the GPO
Construction site in colorful Viareggio, Italy: pedestrians are adviced to walk on the other side of the road, not obstructed.
Nikon FM2n, Nikkor AI-S 50/1.2, Coolscan 9000, Photoshop, Provia 100F
Other photos with road signs on my site:
Dépose des grilles Jean Lamour dans le cadre du projet de transformation du Grand Hôtel de la Reine dans le Pavillon Alliot en hôtel 5 étoiles.
Le projet comprend la reprise des fondations, la restauration des façades, ainsi qu'un réaménagement de l'intérieur et la création d’un spa.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : place Stanislas
Construction : 1751 → 1755
▻ Architecte : Emmanuel Héré
Rénovation : 2024 → 2026
▻ Architectes : Pierre-Yves Caillaut ACMH / L'Atelier DH
Autorisation de travaux n° AC 054 395 23 00017
▻ Délivrée le 14/09/2023
Permis de démolir n° PD 054 395 23 00039
▻ Délivré le 03/01/2024
Déclaration préalable n° DP 054 395 23 01660
▻ Délivré le 15/01/2024
Permis de construire n° PC 054 395 23 00051
▻ Délivré le 24/01/2024
Niveaux : R+2
Hauteur : 21,66 m
Surface de plancher totale : 4 570 m²
▻ Surface de plancher avant travaux : 8 652 m²
Superficie du terrain : 1 165 m²
Massive construction works are going on in the city of Mumbai. As the city is always under constant pressure of searching new places for thriving population of commerce and business. Skyline of Mumbai changing rapidly than ever.Central of these real estate activity is Lower Parel a former cotton mill locality of Mumbai.
Travaux de renouvellement du site propre du trolley à Nancy dans le cadre des aménagements pour la ligne 1 du trolley.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Ouest
Adresse : avenue du XXᵉ Corps
Massive construction works are going on in the city of Mumbai. As the city is always under constant pressure of searching new places for thriving population of commerce and business. Skyline of Mumbai changing rapidly than ever.Central of these real estate activity is Lower Parel a former cotton mill locality of Mumbai.
Konica Hexanon AR 40mm 1.8
First shot with the Konica Hexanon AR 40mm 1.8 lens. Feels like a soft lens, not so sharp and it makes some crazy stuff with all kinds of lights. Think this will work better when a bit brighter outside. It was kind of winter-evening-lowlight, and that in combination with the craziest bokeh (even when in focus) I've ever seen made it quite hard to get what I wanted. I don't think it's a bad lens, just have to learn what conditions that works best for it
Nederland, Zuid-Holland, Nieuwe Waterweg, 28-09-2014; Functioneringssluiting Maeslantkering. De waterkering in de Nieuwe Waterweg wordt een maal per jaar, voordat het stormseizoen begint, getest. Tijdens het sluiten van de kering ligt alle scheepvaartverkeer naar de Rotterdamse haven stil. Aan de horizon Rotterdam, rechts Callandkanaal en de havens van Europoort. De Maeslantkering sluit normaal gesproken alleen bij dreigende stromvloed en bij een waterstand van 3 meter of meer boven NAP. De kering, onderdeel van de Deltawerken, vormt samen met de Hartelkering de Europoortkering en beschermt Rotterdam en achterland bij extreme waterstanden.
Hoek van Holland - Port of Rotterdam. Aerial view of the new storm surge barrier (Maeslantkering) in the Nieuwe waterweg during the so-called functioning closure, taking place one a year before the storm season begins. The waterway, leading to the Port of Rotterdam (at the horizon), is closed during the test.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
Marines with 1st Ballation 8th Marines, Bravo Company, 1st Platoon construct new barracks at Combat Outpost 7171, Helmand Province on October 27, 2010.
As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.
Construction de l'ensemble immobilier Les Rives D'Austra comprenant 4 bâtiments pour 98 logements.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : 38, boulevard de la Mothe
Fonction : Logements
Construction : 2025 → 2026
▻ Architecte : Clement Blanchet Architecture
Permis de construire n° PC 54 395 24 00019
▻ Délivré le 17/07/2024
Permis de construire n° PC 54 395 24 00018
▻ Délivré le 17/07/2024
Niveaux : R+5
Hauteur : 18,50 m
Surface de plancher : 6 400 m²
Superficie du terrain : 2 792 m²
Travaux d'extension et de rénovation du Musée Lorrain.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : 64, Grande Rue
Fonction : Musée
Construction : 1502 → 1512
Rénovation : 2024 → 20??
▻ Architecte : Philippe Charles Dubois et Associés
Permis de construire n° PC 54 395 23 00040
▻ Délivré le 25/10/2023
Hauteur : 42,09 m
Surface de plancher : 4 524 m²
▻ Existante : 4 033 m²
▻ Supprimée : 1 023 m²
▻ Créée : 1 514 m²
Superficie du terrain : 5 205 m²
Der Wuppertaler Hauptbahnhof ist eigentlich ein klassizistischer Prachtbau. Es stammt aus dem Jahr 1848 und ist eines der ältesten erhaltenen Bahnhofsgebäude. Leider wurde der Bau über die Jahrzehnte durch diverse An- und Umbauten immer mehr entstellt. Jetzt läuft ein Projekt, an dessen Ende die mehr oder weniger vollständige Wiederherstellung des ursprünglichen Zustands stehen wird. Meine Fotoserie zeigt den Abbruch der 60er-Jahre-Vorbauten.
Wuppertal's main station is a classicist marvel from 1848. It is one of the oldest surviving structures of its kind. Unfortunately it has been marred by ugly additions and alterations. Right now a reconstruction project has been started. When it is finished, the historic structure will have regained its original form (more or less, that is). My photo series documents the destruction of the awning from the 1960s.
Massive construction works are going on in the city of Mumbai. As the city is always under constant pressure of searching new places for thriving population of commerce and business. Skyline of Mumbai changing rapidly than ever.Central of these real estate activity is Lower Parel a former cotton mill locality of Mumbai.
Construction works of the pedestrian bridge linking the Merlion Park to the middle of the Esplanade Bridge and the Esplanade are in progress. The pedestrian bridge is 6m wide, 220m long and curved is scheduled to be completed in 2015.
I could be wrong but this is/was locally known as the Long Stone. If you search for the “Long Stone” in Google it is most likely that you will find information relating to a local pub rather than this sculpture
The Steine structure was erected in 1986 and was sculpted by Cliodhna Cussen. It was removed for a few years because of construction works associated with the new Luas cross-city tram service. The original installation included a granite inscribed plaque and a bronze plaque on a circular shaft set into granite setts arranged in eight circular bands around the principal granite shaft. The last time I photographed this the bronze plate was missing but the granite setts are still missing.
The stone is erected on a site near which stood a famous Long Stone or Steine / Steyne standing 12-14 feet high and erected by the Viking inhabitants of Dublin in the 10th or 11th centuries.
The River Liffey was much broader then and the stone actually stood close to the shoreline and perhaps marked a landing place.
The 3.35m high granite shaft is carved with two faces, one of which represents Ivor the first Viking King of Dublin who ruled in the 9th century. The other face is that of a nun and commemorates the convent of St. Mary Hogges, which stood nearby in the middle ages.
Nederland, Zuid-Holland, Nieuwe Waterweg, 28-09-2014; Functioneringssluiting Maeslantkering. De waterkering in de Nieuwe Waterweg wordt eenmaal per jaar, voordat het stormseizoen begint, getest. Tijdens het sluiten van de kering ligt alle scheepvaartverkeer naar de Rotterdamse haven stil.
De Maeslantkering sluit normaal gesproken alleen bij dreigende stromvloed en bij een waterstand van 3 meter of meer boven NAP. De kering, onderdeel van de Deltawerken, vormt samen met de Hartelkering de Europoortkering en beschermt Rotterdam en achterland bij extreme waterstanden.
Hoek van Holland - Port of Rotterdam. Aerial view of the new storm surge barrier (Maeslantkering) in the Nieuwe waterweg during the so-called functioning closure, taking place one a year before the storm season begins. The waterway, leading to the Port of Rotterdam (at the horizon), is closed during the test.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart