View allAll Photos Tagged constructionwork
Travaux de renouvellement du site propre du trolley à Nancy dans le cadre des aménagements pour la ligne 1 du trolley.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Ouest
Adresse : avenue du XXᵉ Corps
Construction of 7 blocks of 30-storey residential blocks comprising of studio apartments, 3 and 4 room flats by the Housing and Development Board (HDB) between Telok Blangah Heights and Telok Blangah Street 31.
Well, here's the problem; any archeological excavation is to be payed by the owner of the land. This is percieved as expensive, and there _are_ large sums we're talking about; for the place pictured here (five minutes walk from Stabby Backe) my estimation is that it would cost around one million dollars - if the archeologists are happy with an average salary and don't use any advanced technology. (There are ways to make it cheaper.) Builders are bound by law to initiate an excavation if there are known findings on the site, or if they find any during construction.
The temptation to "not find anything" on a site is strong, in other words. Big builders may be echonomical about their project, small builders may not have the money at all. I don't know if the flat top mound of Stabby Backe is dug away, since we hade a lot of trouble finding it (it _may_ be hiding in a bush somewhere). On the other hand I stumbled across many cases where people lied about findings to save money, and I'm prone to rush to conclusions. A small bowery may not be a project where people think an excavation is needed.
Réalisation d'un centre thermal et aquatique comprenant des espaces de stationnement et une résidence hôtelière dans le cadre du projet Grand Nancy Thermal.
• Réhabilitation et extension de la piscine intérieure.
• Réhabilitation et extension du bâtiment de la piscine ronde.
• Création de nouveaux bassins extérieurs.
• Création d'espaces verts et de stationnements (découverts et souterrains).
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : rue du Maréchal Juin
Fonction : Piscine
Construction : 2020 → 2023
• Architecte : Architectures Anne Démians / Chabanne & Partenaires
• Gros œuvre : Bouygues Construction
PC n° 54 395 19 R0043 délivré le 20 septembre 2019
Niveaux : R+3
Hauteur maximale : 26.66 m
Surface de plancher totale : 16 547 m²
Superficie du terrain : 37 248 m²
As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.
Evening prayer in an angle of Satwa. In the background, a glimpse of what this area is due to become: a high-tech, postmodern city without a soul.
Dépose des grilles Jean Lamour dans le cadre du projet de transformation du Grand Hôtel de la Reine dans le Pavillon Alliot en hôtel 5 étoiles.
Le projet comprend la reprise des fondations, la restauration des façades, ainsi qu'un réaménagement de l'intérieur et la création d’un spa.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : place Stanislas
Construction : 1751 → 1755
▻ Architecte : Emmanuel Héré
Rénovation : 2024 → 2026
â–» Architectes : Pierre-Yves Caillaut ACMH / L'Atelier DH
Autorisation de travaux n° AC 054 395 23 00017
▻ Délivrée le 14/09/2023
Permis de démolir n° PD 054 395 23 00039
▻ Délivré le 03/01/2024
Déclaration préalable n° DP 054 395 23 01660
▻ Délivré le 15/01/2024
Permis de construire n° PC 054 395 23 00051
▻ Délivré le 24/01/2024
Niveaux : R+2
Hauteur : 21,66 m
Surface de plancher totale : 4 570 m²
▻ Surface de plancher avant travaux : 8 652 m²
Superficie du terrain : 1 165 m²
The area around my apartment has been effectively a building site for three or four years and I am really pleased by the fact the majority of projects will be completed by the end of this year.
The major project with the biggest impact on my living environment is the Luas Cross City project but the good news for me is that the working date for opening the new route to passengers is December 9th/10th. Of course I do not know if the service it self will have unexpected negative social impacts but I am hoping that if there are any they will be more than compensated for by the positives. It would appear that property prices are increasing but as I do not wish to move this is not really relevant to me [except for an increase in property tax]
There will be two tram stops on O’Connell Street.
The GPO Stop will be located within the median of O’Connell Street Lower, north of Middle Abbey Street and will be conveniently located to provide interchange with the Luas Red Line at the Abbey Street stop. This is an important description because it contains a bit of information that might surprise some people. The common belief is that the purpose of the Cross-City was to connect the Red Line and the Green Line services but this is not actually true from a service point of view because users will need to interchange between the lines near the GPO
Réalisation d'un restaurant inter administration dans l’ancien bâtiment de l’Institut agricole et colonial de Nancy.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : 38-42, rue Sainte-Catherine
Fonction : Restauration
Construction : 2023 → 2024
► Architecte : BMT & Associés
PC n° 54 395 22 00044 délivré le 19/10/2022
Niveaux : R+3
Hauteur : ≈14,00 m
workers doing construction work that involves the moving of a heavy concrete pillar, which i did help a little.
::Olympus OM-2n with Zuiko 50mm f/1.4 + Kodak EPP ::
Sa Pa, Việt Nam
...which is being reconstructed in the original style. At the moment the monorail cars pass the nearly finished station without stop. Seen through my "Cenei Vario-Spiegel-Vorsatz" which projects multiple reflections into the lens.
A bed space is not a space to put a bed but an empty bed, often only a wooden plate without mattress, or even a space on the floor of an overcrowded room.
Travaux de renforcement des quais Joannès Couvert, Quai RORO et LO-LO dans le port du Havre.
Aménagements : 2021 → 2023
► Gros œuvre : Eiffage Genie Civil
Travaux de renouvellement du réseau d'alimentation en eau potable et du réseau d'assainissement de la rue du 8ᵉ R.A.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Villes : Vandoeuvre-lès-Nancy (54511)
Adresse : rue du 8ᵉ R.A.
But only for a while. The major reconstruction work which is going on at the moment will reshape the the most central area of Wuppertal. The best thing is: No historic buildings have to be sacrifeced (since they are already gone).
The building in the background is the savings bank tower. It was opened in 1973. Architect is Paul Schneider-Esleben.
Construction de l'ensemble immobilier Key Garden comprenant 2 bâtiments pour 127 logements ainsi que deux niveaux de sous-sol avec stationnements dans la ZAC Nancy Grand Coeur.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : boulevard de l'Insurrection du Ghetto de Varsovie
Fonction : Logements
Construction : 2022 → 2024
â–º Architecte : Tectoniques
PC n° 54 395 18 R0095 délivré le 26/03/2019
Niveaux : R+7
Hauteur : 24,55 m
Surface de plancher : 7 087 m²
Superficie du terrain : 2 485 m²
These men come from India, Pakistan or Bangladesh to work on Dubai multiple construction sites for a monthly basic salary of 800 Drhs (320 euros).
Massive construction works are going on in the city of Mumbai. As the city is always under constant pressure of searching new places for thriving population of commerce and business. Skyline of Mumbai changing rapidly than ever.Central of these real estate activity is Lower Parel a former cotton mill locality of Mumbai.
Construction site in colorful Viareggio, Italy: pedestrians are adviced to walk on the other side of the road, not obstructed.
Nikon FM2n, Nikkor AI-S 50/1.2, Coolscan 9000, Photoshop, Provia 100F
Other photos with road signs on my site:
Construction works of the future Thomson East Coast Line at the existing Outram Park MRT Interchange.
Construction d'un bâtiment de bureaux.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresses : boulevard de la Mothe / rue des Cinq-Piquets
Fonction : Bureaux
Construction : 2024 → 2026
â–» Architecte : PPX Architectes
Permis de construire n° PC 54 395 23 00034
▻ Délivré le 11/10/2023
Niveaux : R+5
Hauteur : 22,00 m
Surface de plancher : 5 296,60 m²
Superficie du terrain : 1 834 m²
Interstate 10 traffic flowing well as construction crews work at the Highland Avenue interchange. Minimizing congestion is a primary goal of the construction teams as they work to expand the Baton Rouge transportation infrastructure.
©Louisiana DOTD/Owen Murphy
Construction of 7 blocks of 30-storey residential blocks comprising of studio apartments, 3 and 4 room flats by the Housing and Development Board (HDB) between Telok Blangah Heights and Telok Blangah Street 31.
Lance Cpl. Gary Munro, a 27-year-old combat engineer from New Haven, Ind., takes a break from paint fumes after painting a classroom, Aug. 3, in support of exercise SHARED ACCORD 2010. The 27-year-old Marine is working with other Marines with Bravo Company, 4th Marine Logistics Group, 6th Engineer Support Battalion, and soldiers with the Armed Forces for the Defense of Mozambique to rebuild a school for Mozambican children.
Visit us at
The dismantling of the Art Nouveau train shed (and of the terminus station) is on its way. Both will soon be replaced with new structures which will look pretty much like the old ones.
This is part of a huge renovation project which started in 1995. The complete infrastructure of the 13.3 km long monorail line had to be replaced after 100 years of service. About 95% of this undertaking have already been finished. As of July 2012 the dismantling and reconstruction of the eastern terminus of the line has begun. This includes the renewal of the train shed with the storage sidings. The shed will be replaced by a modern construction which will be designed more or less in the traditional style. It will be much longer than the existing hall.
Massive construction works are going on in the city of Mumbai. As the city is always under constant pressure of searching new places for thriving population of commerce and business. Skyline of Mumbai changing rapidly than ever.Central of these real estate activity is Lower Parel a former cotton mill locality of Mumbai.
Altered construction work sign. The sign is all bent out of shape, so it was difficult to get a clean shot.........hehehehe!