Construction d'un bâtiment de bureaux.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresses : boulevard de la Mothe / rue des Cinq-Piquets
Fonction : Bureaux
Construction : 2024 → 2026
â–» Architecte : PPX Architectes
Permis de construire n° PC 54 395 23 00034
▻ Délivré le 11/10/2023
Niveaux : R+5
Hauteur : 22,00 m
Surface de plancher : 5 296,60 m²
Superficie du terrain : 1 834 m²
Massive construction works are going on in the city of Mumbai. As the city is always under constant pressure of searching new places for thriving population of commerce and business. Skyline of Mumbai changing rapidly than ever.Central of these real estate activity is Lower Parel a former cotton mill locality of Mumbai.
The bridge in the foregournd has just been rebuilt. It will soon be reopened. The monorail station (which you have to imagine just left of the bridge) is still in the process of reconstruction. When it's finished it will resemble the original structure.
If you are interested in cameras and lenses: I took this series with an old manual focus Vivitar lens from the mid-70s (a 35mm 1:1.9 Auto Wide-Angle) on a Nikon D3000.
OLYMPUS DIGITAL CAMERA
Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.
Construction of 7 blocks of 30-storey residential blocks comprising of studio apartments, 3 and 4 room flats by the Housing and Development Board (HDB) between Telok Blangah Heights and Telok Blangah Street 31.
Identifier: SFFf-100585.274959
Photographer: Kristian Berge.
Medium: Cellulose nitrate negative.
Extent: 7 x 12 cm.
Original caption (from Berge's negative album): Grip gamle og nye molo, "promenaden".
Identifier: SFFf-100585.274953
Photographer: Kristian Berge.
Medium: Cellulose nitrate negative.
Extent: 7 x 12 cm.
Original caption (from Berge's negative album):
Réalisation d'un centre thermal et aquatique comprenant des espaces de stationnement et une résidence hôtelière dans le cadre du projet Grand Nancy Thermal.
• Réhabilitation et extension de la piscine intérieure.
• Réhabilitation et extension du bâtiment de la piscine ronde.
• Création de nouveaux bassins extérieurs.
• Création d'espaces verts et de stationnements (découverts et souterrains).
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : rue du Maréchal Juin
Fonction : Piscine
Construction : 2020 → 2023
• Architecte : Architectures Anne Démians / Chabanne & Partenaires
• Gros œuvre : Bouygues Construction
PC n° 54 395 19 R0043 délivré le 20 septembre 2019
Niveaux : R+3
Hauteur maximale : 26.66 m
Surface de plancher totale : 16 547 m²
Superficie du terrain : 37 248 m²
Photograph taken at 10:20am on June 3rd 2012 off Broad Street as the old meets the new and Oxford's beautiful and historic past meets the inevitability of modern day expansion and building by the Museum of the History of Sciece in the grounds shared by Bodleian Library and Sheldonian Theatre, Oxford, England.
Nikon D7000 85mm 1/80s f/13.0 iso200
Nikkor AF-S 18-105mm f/3.5-5.6G VR. UV filter. Nikon GP-1 GPS.
LATITUDE: N 51d 45m 15.74s
LONGITUDE: W 1d 15m 19.96s
ALTITUDE: 86.0m
The bridge in the foregournd has just been rebuilt. It will soon be reopened. The monorail station behind the bridge is still in the process of reconstruction. When it's finished it will resemble the original structure.
If you are interested in cameras and lenses: I took this series with an old manual focus Vivitar lens from the mid-70s (a 35mm 1:1.9 Auto Wide-Angle) on a Nikon D3000.
Construction du Parc Eolien de Lemoncourt en Moselle.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Moselle (57)
Village : Lemoncourt (57590)
Construction : 2025
Nombre d'éoliennes : 5
Modèle : Vestas V117
â–º Hauteur de la nacelle : 91,5 m
► Diamètre du rotor : 117 m
â–º Hauteur totale en bout de pales : 150 m
â–º Puissance unitaire : 3,6 MW
A view of the construction work taking place on the site behind the heritage-protected façade of Myer Lonsdale Street (www.myer.com.au/about-us_myer-melbourne-redevelopment_rei...).
What fascinates me about the back of this façade is the different colours remaining on the walls of different floors - remnants from other times and interior design tastes.
While I'm sad about the loss of yet another original building, I never really liked the Myer Lonsdale Street store's layout (remember those escalators criss-crossing the levels? And getting lost trying to navigate between the two buildings?). I'm hoping that the new space will be light, bright and respectful to the heritage of the area.
Travaux de renouvellement du site propre du trolley à Nancy dans le cadre des aménagements pour la ligne 1 du trolley.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Ouest
Adresse : avenue du XXᵉ Corps
Construction works of the future Thomson East Coast Line at the existing Outram Park MRT Interchange.
Déconstruction d'un bâtiment d'activité en vue de la réalisation d'un ensemble commercial.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Villes : Houdemont (54180) / Heillecourt (54180)
Adresse : avenue des Érables
Fonction : Industrie
Déconstruction : 2024 → 2025
With its narrow streets, low buildings and houses, Satwa is the place where most of Dubai construction workers live. They come from India, Pakistan and Bangladesh.
All photographs in my photostream are Copyrighted © Dave Kirwin. All Rights Reserved.
| Flickr Photos | Flickr Railway Photos | Instagram | #eastleighsocialphotographer
-----------
Surface construction area of Nine Elms tube station. Part of the NLE (Northern Line Extension) that take the line from Kennington out to Battersea Power Station as part of the regeneration of the area.
Previous:
26/11/17
www.flickr.com/photos/davekirwin/31166830941
29/04/17
www.flickr.com/photos/davekirwin/33521419004
01/10/16
www.flickr.com/photos/davekirwin/29563841474
18/06/16
Construction works of the future Thomson East Coast Line at the existing Outram Park MRT Interchange.
This photograph shows the excavation and construction of the escalator shaft at Haymarket Station.
The image is taken from a series documenting the excavation and construction of the Haymarket metro station, including the escalator and lift shafts, a draught relief shaft, station platforms and lower concourse.
The images are taken from the Mott, Hay and Anderson collection, consulting civil engineers responsible from the Tyneside Metro light rail system and the Tyne Pedestrian, cyclist and vehicular tunnels.
The photographers were Turners (Photography) Ltd of 7-15 Pink Lane, Newcastle.
Reference no. DT.MHA/12/66237/C
This image inspired ‘Interchange’, an experimental film and album of music by Warm Digits. More information can be found here www.twmuseums.org.uk/halfmemory/warm-digits-
interchange
(Copyright) We're happy for you to share this digital image within the spirit of The Commons. Please cite 'Tyne & Wear Archives & Museums' when reusing. Certain restrictions on high quality reproductions and commercial use of the original physical version apply though; if you're unsure please email archives@twmuseums.org.uk
They do major overhauls on the tram tracks close to my home. They close the line with the last tram on Friday. Start on Saturday morning ripping out all tracks and ground work, laying the new tracks on Sunday morning and start attaching the new track with concrete on Sunday afternoon.
Monday morning, the trams run nearly normal again.
They manage to get around 200 - 300 metres of track replaced over one weekend.