View allAll Photos Tagged constructionwork
Construction de l'ensemble immobilier Au Jardin des Arts comprenant 41 logements dans 2 bâtiments.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Moselle (57)
Ville : Metz (57000)
Quartier : Nouvelle-Ville Metz
Adresses : avenue André Malraux / rue Sturel Paigné
Fonction : Logements
Construction : 2022 → 2026
â–» Architecte : Thierry Hamamm
Permis de construire n° PC 57 463 20 X0095
▻ Délivré le 12/08/2021
Niveaux : R+5
Hauteur : 19,25 m
Surface de plancher : 3 105, 91m²
Surface du terrain : 2 558 m²
In 2017 there will be a new tram service which will have two stops very close to my home. One will be on Lower Domnick Street and the other just in front of the Bus Depot in Broadstone. Of the two the one at Broadstone should be of greatest interest to me as it will only a two or three minute walk [assuming that I can go through Kings Inns].
Connection of the new Granegegorman campus on the new line is very important, and there will be in excess of 20,000 students using the service.
The old railway line that ran through Dublin city included a stop at Broadstone and at Harcourt St. The latter line was preserved over the years after being closed down in the 1950s, which made it available for the RPA to use during the green Luas line construction. A similar scenario will occur with the Broadstone facilities near Constitution Hill.
In the city centre, trams are planned to run on street, but starting from the north west of the inner-city trams will run in a trench and under roads on the disused Broombridge railway alignment.
The plan includes pedestrian access and lifts from Irish Rail’s Broombridge Station to the Luas stop beside it, and vehicle access from Broombridge Road to the stations, including a set down area for buses, taxis and car, as well as bicycle parking.
At Broadstone the relocation of the Dublin Bus and Bus Eireann bus depots was expected to be needed, although it is unclear if this is part of the current plan. At least some destruction of the depot building is planned.
A light railway depot to service and store trams is planned in the area beside Broombridge Station and the Royal Canal.
There is a Marian Statue located in front of the old station building but I have been unable to find out if it will remain at its current location.
Travaux de renouvellement du réseaux d'assainissement et d'adduction d'eau potable rue Gustave Simon et place Vaudémont à Nancy.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresses : rue Gustave Simon / place Vaudémont
Durée des travaux : mars 2025 → mai 2025
OLYMPUS DIGITAL CAMERA
Bauakademie
Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.
King size excavator.
Most buildings of the former silk weaving mill were from second half of the 19th century. The company who owned them went out of business in 1974. After that the structure saw multiple uses. For several years they hosted an ice skating rink which was said to be one of the largest indoor rinks in Europe. There was also a dancing school, restaurants and shops in the basement. Three times the site was set on fire, non if these incidents really destroyed the buildings. Only recently a developper demolished them. First he announced to save at least the front but later he tore it down. Again a piece of industrial heritage is gone.
Réhabilitation de deux collecteurs d'assainissement à Nancy.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : rue du Préfet Claude Erignac / rue Pierre Fourier
Durée des travaux : mars 2021 → juin 2021
As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.
Construction de l'ensemble immobilier LIFE - INITIAL comprenant 42 logements ainsi que des bureaux.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : rue Edmonde Charles-Roux / rue Cyfflé
Fonction : Logements / Bureaux
Construction : 2021 → 2023
â–º Architecte : DRLW Architectes
PC n° 54 395 19 R0068 délivré le 28/11/2019
PC modificatif n° 54 395 19 R0068 M01 délivré le 18/08/2021
Niveaux : R+7
Hauteur : 25.95 m
Surface de plancher totale : 6 234,68 m²
Superficie du terrain : 1 305 m²
Dernière tranche de l'aménagement du contournement de Malzéville entre la rue Pasteur et le viaduc Louis Marin.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Villes : Malzéville (54220) / Saint-Max (54130)
Durée des travaux : 2020 → 2021
Inauguration : 18/12/2021
OLYMPUS DIGITAL CAMERA
Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.
Construction de l'ensemble immobilier LIFE - INITIAL comprenant 42 logements ainsi que des bureaux.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : rue Edmonde Charles-Roux / rue Cyfflé
Fonction : Logements / Bureaux
Construction : 2021 → 2023
â–º Architecte : DRLW Architectes
PC n° 54 395 19 R0068 délivré le 28/11/2019
PC modificatif n° 54 395 19 R0068 M01 délivré le 18/08/2021
Niveaux : R+7
Hauteur : 25.95 m
Surface de plancher totale : 6 234,68 m²
Superficie du terrain : 1 305 m²
A large loader stands prominently at a construction site while other heavy machines work in the background, moving earth across the gravel terrain on a cloudy day.
Identifier: SFFf-100585.274991
Photographer: Kristian Berge.
Medium: Cellulose nitrate negative.
Extent: 7 x 12 cm.
Original caption (from Berge's negative album): "Ekskavator Nærøsundet k."
The new lock will be known as "Keith Ayling" lock.
Please don't use this image on websites, blogs or other media .com without my explicit permission. All rights reserved.
© rogerperriss@aol.com
OLYMPUS DIGITAL CAMERA
Schloßecke!
Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.
Massive construction works are going on in the city of Mumbai. As the city is always under constant pressure of searching new places for thriving population of commerce and business. Skyline of Mumbai changing rapidly than ever.Central of these real estate activity is Lower Parel a former cotton mill locality of Mumbai.
The rollers are leveling the ground surface while performing the compaction for the embankment (Section 1 of the Faisalabad-Khanewal Highway, M4). The National Trade Corridor Highway Investment Program will play an important role to promote the trade and industrial operations in Pakistan.
Read more on:
National Trade Corridor Highway Investment Program - Tranche 1
As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.
As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.
As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.
Nederland, Gelderland, Gemeente Arnhem, 30-09-2015; IJsselkop, splitsing van het Pannerdensch Kanaal (uitloper van de Rijn) in Neder-Rijn en IJssel. De uiterwaarden van de Hondsbroeksche Pleij bij Westervoort.
Division of river Rhine in Lower Rhine and IJssel.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.
Nederland, Gelderland, Gemeente Arnhem, 30-09-2015; IJsselkop, splitsing van het Pannerdensch Kanaal (uitloper van de Rijn) in Neder-Rijn en IJssel. Met wegwijzer. Division of river Rhine in Lower Rhine and IJssel.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
Construction of four-lane highway from Faisalabad to Gojra (Section 1 of the Faisalabad-Khanewal Highway, M4). The National Trade Corridor Highway Investment Program will play an important role to promote the trade and industrial operations in Pakistan.
Read more on:
National Trade Corridor Highway Investment Program - Tranche 1
RIght place, right time. The moon was rising over the East end of Glasgow and I was able to use it to silhouette one of the cranes being used in the city centre.
As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.
OLYMPUS DIGITAL CAMERA
Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.
Wegens een verzakking op de Vijzelgracht, bij het boren van een nieuwe metrotunnel, rijden lijn 16 en 24 sins gisteravond om. viceversa via de weteringschans, de Roeterstraat en de Plantage, het Waterloo en het Rembrandtplein.
Due to extra constructionworks on the normal route, the tramlines 16 and 24 are diferted.
Crew laying foundation for Iowa's new state capitol building. Des Moines, Iowa. 1871.
Source: State Historical Society of Iowa, Des Moines
Reproductions and permissions: www.iowaculture.gov/history/research/research-centers/cop...
A Marine with Bravo Company, 4th Marine Logistics Group, 6th Engineer Support Battalion, sands down a classroom wall at a school in Moamba, Mozambique, Aug. 3, 2010. During the coming days, Marines will use approximately 80 gallons of paint and primer, 2,000 pounds of hand-mixed concrete and several thousand pounds of lumber to reconstruct the school, which will be used to teach male and female middle and high school students. The U.S. Marine engineer battalion is in Mozambique as part of Exercise SHARED ACCORD 2010, a 10-day exercise designed to build U.S. Africa Command partner nation capacity for peace and stability operations.
Visit us at
www.africom.mil www.africom.mil/getArticle.asp?art=4982&lang=0
Journal:
I wanted this to feel like I was looking down on a construction site from an office building.
The water tanker is showering water and the rollers are leveling the ground surface while performing the compaction for the embankment (Section 1 of the Faisalabad-Khanewal Highway, M4). The National Trade Corridor Highway Investment Program will play an important role to promote the trade and industrial operations in Pakistan.
Read more on:
National Trade Corridor Highway Investment Program - Tranche 1