View allAll Photos Tagged constructionwork

The machine moved in just when I started my session. The specialists started then to prepare it for work, and started within 15 minutes working the ballast and track.

 

The railway line I use is closed over the weekend due to track replacement work in one of the single track sections.

Lower Parel area at Night

Construction de l'ensemble immobilier LIFE - INITIAL comprenant 42 logements ainsi que des bureaux.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Centre

Adresse : rue Edmonde Charles-Roux / rue Cyfflé

Fonction : Logements / Bureaux

 

Construction : 2021 → 2023

► Architecte : DRLW Architectes

PC n° 54 395 19 R0068 délivré le 28/11/2019

PC modificatif n° 54 395 19 R0068 M01 délivré le 18/08/2021

 

Niveaux : R+7

Hauteur : 25.95 m

Surface de plancher totale : 6 234,68 m²

Superficie du terrain : 1 305 m²

Steel fixing work during the construction of four-lane highway from Faisalabad to Gojra (Section 1 of the Faisalabad-Khanewal Highway, M4). The National Trade Corridor Highway Investment Program will play an important role to promote the trade and industrial operations in Pakistan.

 

Read more on:

Pakistan

Transport

National Trade Corridor Highway Investment Program - Tranche 1

Construction d'une résidence service de 70 logements.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Sud

Adresse : 13, rue Albert Lebrun

Fonction : Hôtel

 

Construction : 2007 → 2009

• Architecte : GHA Architectes

PC n° 54 395 00 0011 délivré le 18 janvier 2005

 

Niveaux : R+4

Hauteur : 15.00 m

SHON : 1 369 m²

Surface du terrain : 5 043 m²

As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.

  

Hotel "Rutenbecker Hof" (along with some other buildings) in the process of demolition. Wuppertal's famous suspension monorail had to reduce it's speed drastically when passing the site.

 

The early 20th century structures have to make way for a new supermarket is going to be built. I photographed this series with a 40 years old Nikon EL camera. This shot was made with a Nikkor-Q Auto 135mm f/3.5 (pre-AI) lens.

But only for a while. The major reconstruction work which is going on at the moment will reshape the the most central area of Wuppertal. The best thing is: No historic buildings have to be sacrifeced (since they are already gone).

Here we see a new underground parking and a bus terminal in the making - right beneath the railroad tracks.

Buchmann is one of the big bakeries in Zurich, and there was a wonderful smell of bread baking in the air.

 

Another three shots from the track replacement work between Zürich Binz and Zürich Giesshübel.

Construction works of the future Thomson East Coast Line at the existing Outram Park MRT Interchange.

Inside the Shelter of the Prehistoric Settlement of Akrotiri in Santorini

Inside the shelter

Hotel "Rutenbecker Hof" (along with some other buildings) in the process of demolition. Wuppertal's famous suspension monorail had to reduce it's speed drastically when passing the site.

 

The early 20th century structures have to make way for a new supermarket is going to be built. I photographed this series with a 40 years old Nikon EL camera. This shot was made with a Nikkor-Q Auto 135mm f/3.5 (pre-AI) lens.

Philosophikal Tools:

 

Series about Dualism.

Visualization of the kantian "Things-it-self" - some Tools of Artists, Thinkers, Poets and Philosophers...

Simple eidetik Way to illustrate what has Rodins Thinker in his Head.

 

If you like Photos & Thoughts kombined,

may you´ll like to join PhotoPhilosophy

   

©1999-2008 all Rights reserved, Krystian

Bauarbeiten auf dem Tempelhofer Feld

Tempelhofer Freiheit

Berlin, Januar 2014

Here is a nice picture of our #Liebherr944 on a demolition site in Kirovsk. Razmax group is an experienced contractor for redevelopment projects in the far north. Demolition of an old phosphate rock factory facilities is a part of production renovation project for one of the worlds biggest phosphorus manufacturer - PHOSAGRO.

 

Construction works of the pedestrian bridge linking the Merlion Park to the middle of the Esplanade Bridge and the Esplanade are in progress. The pedestrian bridge is 6m wide, 220m long and curved is scheduled to be completed in 2015.

Travaux sur le réseau électrique.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Ouest

Adresse : rue Jeanne d'Arc

 

Durée des travaux : mars 2021 → juin 2021

Demolition works on a former railway station in St.Petersburg. Razmax team has managed this redevelopment project in 2012 with a gentle care for historical buildings situated on a demolition site. Federal Group of Engineering Companies - RAZMAX is a trusted contractor for demolition, abatement and redevelopment works from Russia.

Rückbau des ehemaligen Übungsplatzes der Flughafenfeuerewehr

(Übungsplatz der Flughafenfeuerwehr wird zurückgebaut)

 

Tempelhofer Freiheit, Berlin Januar 2014

Constructing the new boulevard by Spanish landscape architect Manuel De Sola-Morales, Scheveningen, the Netherlands.

 

website | maasvlakte book | portfolio book

Today we publish an extraordinary pic of our #Liebherr944 doing some massive soilwork on site back in 2016. The special type of creative optics was used to make this shot. #Lensbaby is a nice choice to add some magic glitter on an industrial photo to give it a stunning look.

Dernière tranche de l'aménagement du contournement de Malzéville entre la rue Pasteur et le viaduc Louis Marin.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Villes : Malzéville (54220) / Saint-Max (54130)

 

Durée des travaux : 2020 → 2021

Inauguration : 18/12/2021

As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.

  

But only for a while. The major reconstruction work which is going on at the moment will reshape the the most central area of Wuppertal. The best thing is: No historic buildings have to be sacrifeced (since they are already gone).

In the background we see one of the oldest surviving railway buildings in Germany. It was erected in 1875 by the privately owned railroad company "Bergisch-Märkische Eisenbahn". When the Prussian governement nationalized the railroads they took over this structure. In the 1920s it was handed over to the Deutsche Reichsbahn, and after WW II it was operated by the Deutsche Bundesbahn (which closed it in 1974). Today it is privately owned again. Most of the space is out of use. There are concepts for a new utilization.

Travaux de développement et d'interconnexion des réseaux de chauffage urbain de la Métropole du Grand Nancy sur le quartier Centre Ville - Charles III.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Centre Ville - Charles III

 

Durée des travaux : mars 2025 → août 2025

Indian Construction workers at a site near Mumbai, India

As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.

  

When it comes to your town, tell your liberal friends there's another free ride in front of the grocercy store they are entitled to enjoy.

Poids en ordre de marche : 37 000 kg

Profondeur de forage max. : 48 m

Diamètre de forage max. : 1 800 mm

 

Construction de l'ensemble immobilier LIFE - INITIAL comprenant 42 logements ainsi que des bureaux.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Centre

Adresse : rue Edmonde Charles-Roux / rue Cyfflé

Fonction : Logements / Bureaux

 

Construction : 2021 → 2023

► Architecte : DRLW Architectes

PC n° 54 395 19 R0068 délivré le 28/11/2019

PC modificatif n° 54 395 19 R0068 M01 délivré le 18/08/2021

 

Niveaux : R+7

Hauteur : 25.95 m

Surface de plancher totale : 6 234,68 m²

Superficie du terrain : 1 305 m²

Демонтаж дымовых труб на территории бывшего завода Вагонмаш в Московском районе Санкт-Петербурга, осуществленный специалистами ФГИК "Размах" в 2013 году. За время работ на участке в 12 га было получено 198,1 тыс м3 отходов в твердом теле, а результатом редевелопмента промышленной зоны стало строительство многоэтажного жилого комплекса от ГК «Эталон ЛенСпецСМУ».

Massive construction works are going on in the city of Mumbai. As the city is always under constant pressure of searching new places for thriving population of commerce and business. Skyline of Mumbai changing rapidly than ever.Central of these real estate activity is Lower Parel a former cotton mill locality of Mumbai.

Copyright MMX by mcPhotoArts

All rights reserved.

Keski-Pasila construction work 2015

Most buildings of the former silk weaving mill were from second half of the 19th century. The company who owned them went out of business in 1974. After that the structure saw multiple uses. For several years they hosted an ice skating rink which was said to be one of the largest indoor rinks in Europe. There was also a dancing school, restaurants and shops in the basement. Three times the site was set on fire, non if these incidents really destroyed the buildings. Only recently a developper demolished them. First he announced to save at least the front but later he tore it down. Again a piece of industrial heritage is gone.

Indian Construction workers at a site near Mumbai, India

As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.

  

Massive construction works are going on in the city of Mumbai. As the city is always under constant pressure of searching new places for thriving population of commerce and business. Skyline of Mumbai changing rapidly than ever.Central of these real estate activity is Lower Parel a former cotton mill locality of Mumbai.

1 2 ••• 13 14 16 18 19 ••• 79 80