View allAll Photos Tagged constructionwork

The London Underground tube station at Tottenham Court Road, first opened for Central line services in 1900 with the 'Northern line' joining it in 1907 and having under gone various changes in the last century, is now being massively reconstructed to allieviate conditions that were pretty grim for both passengers and staff. New entrances, ticket halls, escalators and platform links are being constructed - alongside the wholly new Crossrail facilities that come into use in three years time. It is a massive job. I went on a site inspection so these are taken legitimately!

 

Parallel to the Central line access and running tunnels, and with links through to the new Crossrail station, this is one of the newly constructed deep level passageways at TCR being used for material and spoil transport before being fitted out for passenger use. The sheer scale of these new passageways, as against the original small diameter subways, is astonishing.

Construction de l'ensemble immobilier L’Écrin des Jardiniers comprenant 2 bâtiments collectifs pour 64 logements, 6 maisons individuelles ainsi que 71 places de stationnement construits sur le site de l'ancienne maison de retraite Notre Maison.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Sud

Adresse : 52, rue des Jardiniers

Fonction : Logements

 

Construction : 2020 → 2022

Architecte : Alain Casari

PC n° 54 395 19 R0021 délivré le 11/07/2019

 

Niveaux : R+5

Hauteur : 16.72 m

Surface de plancher : 4 888 m²

Superficie du terrain : 6 347 m²

The place where I took this photo is not far from the site where the first Neandertal man (Homo neanderthalensis) was found.

Three buidings in this image of part of the Abu Dhabi city. The balcony top right belongs to an apartment buiding, the buiding with the green glazing and yellowish facade is also an apartment buiding and behind that is the Landmark Tower presently under construction.

 

Compressed perspective from the Nikkor 70-300 mm lens at 300 mm , full details noted in the tags.

 

Shot in late December with the sunlight of the setting sun reflecting off the buidings .

 

Image is deliberately on a slant.

Dernière tranche de l'aménagement du contournement de Malzéville entre la rue Pasteur et le viaduc Louis Marin.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Villes : Malzéville (54220) / Saint-Max (54130)

 

Durée des travaux : 2020 → 2021

Inauguration : 18/12/2021

The is still a lot of construction work underway at the Broadstone Luas Tram stop

OLYMPUS DIGITAL CAMERA

 

Das "Berliner Schloß" im Modell!

 

Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.

OLYMPUS DIGITAL CAMERA

 

Berliner Schlosses“ bzw. „Humboldtforum

 

Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.

Today we publish o shot of our operated equipment being engaged in a huge soilworks on site some time ago. We used some #JCB's, #komatsu, two #liebherr944 and one #liebherr954 for an extra heavy duty works on site in our hometown, St.Petersburg.

OLYMPUS DIGITAL CAMERA

 

Im Schloß! Fassadenschmuck!

 

Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.

As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.

  

werkzaamheden in de bouwput aan de Croeselaan, op de achtergrond het gebouw van de Jaarbeurs

As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.

  

В 2012 году специалисты ФГИК "Размах" произвели

демонтаж вышедших из эксплуатации зданий завода "ФосАрго - Череповец", а также провели необходимые мероприятия, связанные с экологической безопасностью проекта. ФосАгро - крупнейший в Европе производитель фосфоросодержащих удобрений, фосфорной и серной кислот. Демонтажные работы на объекте компании выполнялись в условиях действующего производства, с поэтапным выводом действующих производственных мощностей и сохранением железнодорожного полотна, а общий объем демонтажа составил 51 тыс м3.

As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.

  

Nederland, Gelderland, Gemeente Arnhem, 30-09-2015; IJsselkop, splitsing van het Pannerdensch Kanaal (uitloper van de Rijn) in Neder-Rijn en IJssel. Links de uiterwaarden van de Hondsbroeksche Pleij bij Westervoort.

Division of river Rhine in Lower Rhine and IJssel.

 

luchtfoto (toeslag op standard tarieven);

aerial photo (additional fee required);

copyright foto/photo Siebe Swart

OLYMPUS DIGITAL CAMERA

 

Im Schloß!

 

Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.

Poids en ordre de marche : 37 000 kg

Profondeur de forage max. : 48 m

Diamètre de forage max. : 1 800 mm

 

Construction de l'ensemble immobilier LIFE - INITIAL comprenant 42 logements ainsi que des bureaux.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Centre

Adresse : rue Edmonde Charles-Roux / rue Cyfflé

Fonction : Logements / Bureaux

 

Construction : 2021 → 2023

Architecte : DRLW Architectes

PC n° 54 395 19 R0068 délivré le 28/11/2019

PC modificatif n° 54 395 19 R0068 M01 délivré le 18/08/2021

 

Niveaux : R+7

Hauteur : 25.95 m

Surface de plancher totale : 6 234,68 m²

Superficie du terrain : 1 305 m²

Unloading of pipes during the construction of four-lane highway from Faisalabad to Gojra (Section 1 of the Faisalabad-Khanewal Highway, M4). The National Trade Corridor Highway Investment Program will play an important role to promote the trade and industrial operations in Pakistan.

 

Read more on:

Pakistan

Transport

National Trade Corridor Highway Investment Program - Tranche 1

As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.

  

Construction de l'ensemble immobilier L’Écrin des Jardiniers comprenant 2 bâtiments collectifs pour 64 logements, 6 maisons individuelles ainsi que 71 places de stationnement construits sur le site de l'ancienne maison de retraite Notre Maison.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Sud

Adresse : 52, rue des Jardiniers

Fonction : Logements

 

Construction : 2020 → 2022

Architecte : Alain Casari

PC n° 54 395 19 R0021 délivré le 11/07/2019

 

Niveaux : R+5

Hauteur : 16.72 m

Surface de plancher : 4 888 m²

Superficie du terrain : 6 347 m²

Een onbekend metrotreinstel van het gemeentelijk vervoerbedrijf van Amsterdam passeert de werkzaamheden ter hoogte van station Amsterdam Bijlmer.

 

A unknown unit from the city of Amsterdam metro passes the constructionworks for the new station from Amsterdam Bijlmer Arena.

Travaux de désamiantage, déconstruction des bâtiments de l'ancien collège Claude le Lorrain.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Adresse : place Alain Fournier

Fonction : Éducation

 

Déconstruction : 2023

Entreprises : Hollinger

This time we are about to reveal some interesting details for our project we used to manage back in 2014. It was an infrastructure reconstruction project for @gctc_official - the training centre of Russian State Space Corporation @roscosmosofficial. Our customer was in need for a delicate solutions on site, that's why we used to deal with all the goals of the project without any outage of the training centre.

Construction du Parc Eolien de Lemoncourt en Moselle.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Moselle (57)

Village : Lemoncourt (57590)

 

Construction : 2025

Nombre d'éoliennes : 5

Modèle : Vestas V117

Hauteur de la nacelle : 91,5 m

Diamètre du rotor : 117 m

Hauteur totale en bout de pales : 150 m

Puissance unitaire : 3,6 MW

As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.

  

Not really... Just a reflexion on a traffic sign.

 

After today's TV event in Germany one question still remains: Angela Steinbrück or Peer Merkel? Or...? To be decided in three weeks.

The bridge in the foregournd has just been rebuilt. It will soon be reopened. The monorail station (which you have to imagine just left of the bridge) is still in the process of reconstruction. When it's finished it will resemble the original structure.

 

If you are interested in cameras and lenses: I took this series with an old manual focus Vivitar lens from the mid-70s (a 35mm 1:1.9 Auto Wide-Angle) on a Nikon D3000.

As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.

  

Travaux sur le réseau électrique.

 

Pays : France 🇫🇷

Région : Grand Est (Lorraine)

Département : Meurthe-et-Moselle (54)

Ville : Nancy (54000)

Quartier : Nancy Centre

Identifier: SFFf-1991100.118157

 

Description: D/S "Lodølen" under construction in 1910.

 

Media: Glass plate negative

 

Extent: 18 x 24 cm

 

Photographer: Jens Knudsen Maurseth

Today we publish a nice video of huge casting bridge crane demolition on abadoned foundry as part of a large-scale redevelopment project for an old industrial area of Chelyabinsk.

OLYMPUS DIGITAL CAMERA

 

Im Schloß!

 

Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.

OLYMPUS DIGITAL CAMERA

 

Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.

1 2 ••• 8 9 11 13 14 ••• 79 80