View allAll Photos Tagged constructionwork
Nederland, Gelderland, Gemeente Arnhem, 30-09-2015; IJsselkop, splitsing van het Pannerdensch Kanaal (uitloper van de Rijn) in Neder-Rijn en IJssel. De uiterwaarden van de Hondsbroeksche Pleij bij Westervoort.
Division of river Rhine in Lower Rhine and IJssel.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
Nederland, Gelderland, Gemeente Arnhem, 30-09-2015; IJsselkop, splitsing van het Pannerdensch Kanaal (uitloper van de Rijn) in Neder-Rijn en IJssel. Met wegwijzer. Division of river Rhine in Lower Rhine and IJssel.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
Transformation du Grand Hôtel de la Reine dans le Pavillon Alliot en hôtel 5 étoiles.
Le projet comprend la reprise des fondations, la restauration des façades, ainsi qu'un réaménagement de l'intérieur et la création d’un spa.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresse : place Stanislas
Construction : 1751 → 1755
▻ Architecte : Emmanuel Héré
Rénovation : 2024 → 2026
â–» Architectes : Pierre-Yves Caillaut ACMH / L'Atelier DH
Autorisation de travaux n° AC 054 395 23 00017
▻ Délivrée le 14/09/2023
Permis de démolir n° PD 054 395 23 00039
▻ Délivré le 03/01/2024
Déclaration préalable n° DP 054 395 23 01660
▻ Délivré le 15/01/2024
Permis de construire n° PC 054 395 23 00051
▻ Délivré le 24/01/2024
Niveaux : R+2
Hauteur : 21,66 m
Surface de plancher totale : 4 570 m²
▻ Surface de plancher avant travaux : 8 652 m²
Superficie du terrain : 1 165 m²
Construction de l'ensemble immobilier Les Rives D'Austra comprenant 4 bâtiments pour 98 logements.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : 38, boulevard de la Mothe
Fonction : Logements
Construction : 2025 → 2026
â–» Architecte : Clement Blanchet Architecture
Permis de construire n° PC 54 395 24 00019
▻ Délivré le 17/07/2024
Permis de construire n° PC 54 395 24 00018
▻ Délivré le 17/07/2024
Niveaux : R+5
Hauteur : 18,50 m
Surface de plancher : 6  400 m²
Superficie du terrain : 2  792 m²
Rénovation énergétique des bâtiments 2
et 3 de la résidence universitaire Saurupt.
P R É S E N T A T I O N
Construction : 2025 → 2026
Architecte : Pierron Architecture
Fonction : Logements
Déclaration préalable : DP 54 395 26 00114
▻ Délivré le 18/02/2026
Déclaration préalable : DP 54 395 26 00115
▻ Délivré le 18/02/2026
A R C H I T E C T U R E
Niveaux : R+4
Hauteur : 15,82 m
Superficie du terrain : 14 666 m²
L O C A L I S A T I O N
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Mon Désert, Jeanne d'Arc, Saurupt
Adresse : rue de Saurupt
RIght place, right time. The moon was rising over the East end of Glasgow and I was able to use it to silhouette one of the cranes being used in the city centre.
OLYMPUS DIGITAL CAMERA
Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.
Wegens een verzakking op de Vijzelgracht, bij het boren van een nieuwe metrotunnel, rijden lijn 16 en 24 sins gisteravond om. viceversa via de weteringschans, de Roeterstraat en de Plantage, het Waterloo en het Rembrandtplein.
Due to extra constructionworks on the normal route, the tramlines 16 and 24 are diferted.
Crew laying foundation for Iowa's new state capitol building. Des Moines, Iowa. 1871.
Source: State Historical Society of Iowa, Des Moines
Reproductions and permissions: www.iowaculture.gov/history/research/research-centers/cop...
A Marine with Bravo Company, 4th Marine Logistics Group, 6th Engineer Support Battalion, sands down a classroom wall at a school in Moamba, Mozambique, Aug. 3, 2010. During the coming days, Marines will use approximately 80 gallons of paint and primer, 2,000 pounds of hand-mixed concrete and several thousand pounds of lumber to reconstruct the school, which will be used to teach male and female middle and high school students. The U.S. Marine engineer battalion is in Mozambique as part of Exercise SHARED ACCORD 2010, a 10-day exercise designed to build U.S. Africa Command partner nation capacity for peace and stability operations.
Visit us at
www.africom.mil www.africom.mil/getArticle.asp?art=4982&lang=0
Construction of four-lane highway from Faisalabad to Gojra (Section 1 of the Faisalabad-Khanewal Highway, M4). The National Trade Corridor Highway Investment Program will play an important role to promote the trade and industrial operations in Pakistan.
Read more on:
National Trade Corridor Highway Investment Program - Tranche 1
OLYMPUS DIGITAL CAMERA
Brückenschlag?
Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.
Journal:
I wanted this to feel like I was looking down on a construction site from an office building.
The water tanker is showering water and the rollers are leveling the ground surface while performing the compaction for the embankment (Section 1 of the Faisalabad-Khanewal Highway, M4). The National Trade Corridor Highway Investment Program will play an important role to promote the trade and industrial operations in Pakistan.
Read more on:
National Trade Corridor Highway Investment Program - Tranche 1
Today we publish a nice pic taken by our foreman on site in Segezha, Karelia.This time our team was engaged in an old 72m height tower crane dismantling project on plump and paper mill. This crane used to have 1 metre of vertical deviation and the counterweight was overhanging on the facilities of the plant. That's why our team used 250t #Liebherr #LTM1250 for an accurate lowering of the structures after the manual cutting.
Road construction site in Tarawa. Major roads upgraded under the Kiribati Road Rehabilitation Project.
Read more on:
OLYMPUS DIGITAL CAMERA
Wanddetails!
Am 12. Juni 2016 war ich mit Freunden im Berliner Bezirk Mittezwischen dem Kupfergraben sowie der Baustelle des „Berliner Schlosses“ bzw. „Humboldtforum“ unterwegs und habe dabei diese Aufnahmen gemacht.
As you can see from my photographs work has resumed on the multi-million Greystones harbour and marina development project, with the first of more than 350 new homes expected to be offered for sale by April 2016. Because of the weather I did not photograph the new houses. The project has already seen the old Victorian era harbour replaced by a new structure with south and north piers, a large marina and ongoing work on five new clubhouses for sea scouts, divers, sailors, rowers and anglers. Also included in the project is a coastguard station, a new town square, a 16-acre public park, a new beach and marine-related shops and leisure facilities. It should be interesting to see if the ‘Public Areas’ are truly public and if the remain so for more than a year or two … I say this because there are many signs indicating that Fishing, Swimming or Jumping was not allowed. I will visit again later in the year, assuming that the weather improves.
The Hassan Tower is unfortunately wrapped in scaffolding. Construction of the minaret and the accompanying mosque began in the 12th century, with the intention of becoming the largest mosque and highest minaret in the world. However, the project was never finished.
A large loader stands prominently at a construction site while other heavy machines work in the background, moving earth across the gravel terrain on a cloudy day.
But only for a while. The major reconstruction work which is going on at the moment will reshape the the most central area of Wuppertal. The best thing is: No historic buildings have to be sacrifeced (since they are already gone).
In the background we see one of the oldest surviving railway buildings in Germany. It was erected in 1875 by the privately owned railroad company "Bergisch-Märkische Eisenbahn". When the Prussian governement nationalized the railroads they took over this structure. In the 1920s it was handed over to the Deutsche Reichsbahn, and after WW II it was operated by the Deutsche Bundesbahn (which closed it in 1974). Today it is privately owned again. Most of the space is out of use. There are concepts for a new utilization.
Travaux de renouvellement du réseaux d'assainissement et d'adduction d'eau potable rue Gustave Simon et place Vaudémont à Nancy.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Centre
Adresses : rue Gustave Simon / place Vaudémont
Durée des travaux : mars 2025 → mai 2025
Nederland, Zuid-Holland, Nieuwe Waterweg, 28-09-2014; Functioneringssluiting Maeslantkering. De waterkering in de Nieuwe Waterweg wordt een maal per jaar, voordat het stormseizoen begint, getest. Tijdens het sluiten van de kering ligt alle scheepvaartverkeer naar de Rotterdamse haven stil. Aan de horizon Rotterdam, rechts Callandkanaal en de havens van Europoort. De Maeslantkering sluit normaal gesproken alleen bij dreigende stromvloed en bij een waterstand van 3 meter of meer boven NAP. De kering, onderdeel van de Deltawerken, vormt samen met de Hartelkering de Europoortkering en beschermt Rotterdam en achterland bij extreme waterstanden.
Hoek van Holland - Port of Rotterdam. Aerial view of the new storm surge barrier (Maeslantkering) in the Nieuwe waterweg during the so-called functioning closure, taking place one a year before the storm season begins. The waterway, leading to the Port of Rotterdam (at the horizon), is closed during the test.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
Travaux de développement et d'interconnexion des réseaux de chauffage urbain de la Métropole du Grand Nancy sur le secteur Saurupt.
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Durée des travaux : mars 2024 → février 2025