View allAll Photos Tagged progress.

helios 44-k-4 test, minimum focal distance

Some call it progress...

 

View from Central High School.

The current City Hall building is a near-50-year-old structure that has served the city well but, in its current state, is functionally obsolete. Built in 1969, the current City Hall requires major renovations that are complicated by the presence of friable asbestos and the way the electrical and mechanical systems were installed.

On October 3, 2017, Virginia Beach city council unanimously approved a resolution to proceed with the design of a new city hall building. The new three-story structure adjacent to the current city hall, between Buildings 1 and 2, is under construction and progressing well.

For more information - www.vbgov.com/government/departments/public-works/Buildin...

 

Photography - Craig McClure

  

© 2020

ALL Rights reserved by City of Virginia Beach.

Contact photo[at]vbgov.com for permission to use. Commercial use not allowed.

Image converted using ifftoany

progress for a swap i?ve joined at DOA

Still lots to do, I'm getting there slowly!

i can't remember why it was so important to photograph this pie in progress, but there must have been some reason. There is a more serious version of this photo, but it's not as good. This is from way back in January 2010.

I've got to start taking photos when I arrive, not when I leave, the light has all but gone.

Harry Miller Addresses

(Work in Progress)

  

Miller Factory Locations

 

Miller Carb. And Manufacturing Co.

A long Shed in backyard of home. 1939 S. Maple Av.

 

Harry A. Miller Mfg. Co. (Miller and Adamson) Carburetors (from 1916 Business Dir.).

(In 1915) 219 E. Washington St (between Maple and Los Angeles St)

Trivia- At some point Wash 'Street' was renamed Wash "Blvd'

  

Master Carburetor Co. (from1916 Business Directory)

W.E. Burke President, I.J. Ransford V.P., J.E. Ransford Sect-Treasurer.

922-24 S. Los Angeles St.

 

Miller Carburetor Sales Co.

E.S. Harlan of Chicago, President (from 1916 Bus. Directory)

834 S. Los Angeles St.

 

Miller Engine and Foundry Works

1923-29 Long Beach Av

1930 Venice Blvd

1931 Grammercy Pl.

  

Miller Residence Locations

(Born in 1875 moved to L.A. 1894)

 

1905 - 52 Delacey St. Pasadena

(Age 30 worked at Pasadena Auto Company)

 

1918 - 201 N. Coronado, Los Angeles

 

1910 – 1939 ???? S Maple Av (near Washington St in Los Angeles)????

 

Somewhere on Chevy Chase Drive

  

Last Updated Nov. 9, 2014

 

Contagion follows the rapid progress of a lethal airborne virus that kills within days. As the fast–moving epidemic grows, the worldwide medical community races to find a cure and control the panic that spreads faster than the virus itself. At the same time, ordinary people struggle to survive in a society coming apart.

Heniken Cup

Reggio Emilia

Viadana - Ospreys

During the month of November I've had a collection of work up at Progress and this event is a bit of a closing party.

 

more info here

Progress on the new Queensferry Crossing of the Firth of Forth on 15th September with some sections of decking now in place at the South Queensferry end. As viewed from the train on the Forth Bridge through a zoom lens, 15th September, 2015, with the new works framed by the Forth Road Bridge.

eww! excuse the nasty carpet. i think it was the original carpet from when our 1969 house was built... gotta get that replaced pronto!

 

anyway, i thought i'd go with the magic carpet feel borders. unless you really love it, i might start over with something new. i'm not totally happy with this for this swap... it might turn into a christmas present for my bro (he lives and works out in the middle east)

 

what do you all think, though?

Well I have made some progress. All my sewing/fabric things are in the sewing room and unpacked ( well from boxes not yet from the plastic containers) On the list to do:

 

1.Paint room

 

2.Buy a table so I can sew and cut fabric

 

3.Organize stash

    

is the party of progress, the party of the future

An improvised pattern, based off the Joy mitts, for my kid.

Work in progress ^__^

Ivy is progressing nicely - Her wings are almost stitched and I've done most of the beading on the skirt of her dress. She needs some legs though! I think she should be done in a couple of weeks.

 

1 2 ••• 28 29 31 33 34 ••• 79 80