View allAll Photos Tagged phasor

oberalppass - switzerland

The images were taken with Jupiter 37A lens. Time lapse interval is 3 minutes between shots. I wanted to capture more phases, but cloudy skies interfered with my intentions. I believe that apparent different disk size is noticeable. The Super Moon was observed January 31 2018. The atmosphere affected the color rendition. Photoshop white balance is the same on all images.

Phase I restoration area low discharge river channel and drying floodplain (Discharge at S65A was ~300)

From left to right, each camera represents the different phases I've gone through in my particular journey in the hobby of photography.

Day 361 (v 10.0) - i haven't caught up to myself

The third phase of my project to show Arangr Castle through all 4 seasons. See spring: www.flickr.com/photos/66620538@N04/24268640963/in/datepos...

and summer: www.flickr.com/photos/66620538@N04/24349653464/in/datepos...

  

This was a fun season to build, as it being the time of harvest, I was able to have lots of fun minifig details. As well as some fall foliage, which is always neat.

 

Arangr castle is located near the Avalonian border, in Mitgardia. Fall sees the harvest of crops, and storage of provisions for winter. The leaves fall, as the weather gets colder, and animals also make preparation to hibernate or migrate south.

 

See more pictures here: www.brickbuilt.org/?p=3567

SSR loaded grain ex Barellan bound for Allied Mills at Enfield. Mittagong. 13 May 2021.

- www.kevin-palmer.com - Sitting isolated on the prairie of far northern Montana is a former US Air Force base. At the height of the Cold War it was home to 7,000 residents. But since being decommissioned in 1976, almost every house has sat empty and neglected. Most ghost towns consist of a handful of old buildings. But this one is different because the houses are modern enough to belong in just about any town. And there are hundreds of dilapidated homes lining street after street. The harsh climate has taken its toll on these structures. Like something out of a movie set, it was a spooky place to wander around at midnight. That was when the northern lights were at their brightest. Between passing clouds deep reds and greens shined through. Back home an aurora like this would be much lower on the horizon. But going north 3° in latitude meant the aurora filled half the sky. This wasn’t the easiest geomagnetic storm to predict. But with the weather and moon phase being ideal, I had to give it a shot.

️ SPQR - Phase I ️

 

▶️ Watch the Model Film in 4K on YouTube:

youtu.be/zEbGFWenbKI

 

▶️ Intro to SPQR Project:

youtu.be/AUoltNrMyR4

 

Support this unprecedented project on Patreon:

www.patreon.com/RoccoButtliere

 

Parts: 104,000+ (~1,700 unique)

 

Scale: 1:650

 

Dimensions: 57in x 289in (143cm x 231cm)

 

Research Time: 2,000+ hours since 2019

 

Design Time: 1,000+ hours in 200 days

 

Build Time: 600+ hours in 90 days

 

Photography: EClarke Photo 📷

 

© MMXXIII - Rocco Buttliere, LLC

About the best full sun 3/4 view you're gonna get of Amtrak's Anniversary Unit in Phase IV.

 

-AMTK P42DC #184 (Phase IV Heritage) leading power

-Amtrak #313 Missouri River Runner

-Track 1 UP (ex-MoPac) Jefferson City Sub, former location CP Kirk, near MP 13

-S Fillmore Avenue Crossing, Kirkwood, MO

-September 30, 2017

 

TT2_6315_edited-1

Amtrak P42 130, recently painted into the phase II heritage scheme, leads the California Zephyr westbound through Hinsdale. I never got a photo of Amtrak 66 in this scheme before it was involved in a grade crossing accident that ultimately ended it's serviceable life. This completes my list of Amtrak heritage units.

Moon's current phase

Date and time: February 26, 2016 - 23:55

Distance from Earth to the Moon: 405.485 km

Moon's age: 18.6 days

Moon Phase: The moon is waning

Illuminated percentage: 85%

An outbound Regional Rail train approaches Temple University station. In the background one can see the incredibly rare phase break position light signals, though somewhat obscured by catenary and signal bridges.

Solar Eclispe Partial Phase With Sunspots

OLYMPUS DIGITAL CAMERA

️ SPQR - Phase I ️

 

▶️ Watch the Model Film in 4K on YouTube:

youtu.be/zEbGFWenbKI

 

▶️ Intro to SPQR Project:

youtu.be/AUoltNrMyR4

 

Support this unprecedented project on Patreon:

www.patreon.com/RoccoButtliere

 

Parts: 104,000+ (~1,700 unique)

 

Scale: 1:650

 

Dimensions: 57in x 289in (143cm x 231cm)

 

Research Time: 2,000+ hours since 2019

 

Design Time: 1,000+ hours in 200 days

 

Build Time: 600+ hours in 90 days

 

Photography: EClarke Photo 📷

 

© MMXXIII - Rocco Buttliere, LLC

This S2000 is pretty well-known around MA.. goes through tons of phases. Owner does a lot of PlastiDip work for people, and he does amazing work. This car was once mint green with white wheels. Both PlastiDip of course. :D

AND7 D13*+11@#328-1 F9 n11 s10

The destination of the different three phase lines is marked on the wall of the generating hall at the Ardnacrusha hydro-electric power station.

Amtrak 164 the phase IV Heritage unit leads Amtrak train #1333 the WB Borealis at Northbrook, IL.

Model: Maria Kuckovska

 

MUA: Alessandra Giorgini

 

My Camera Settings:

 

Nikon D700

Nikkor 35mm f/ 2 D..at f/ 2.0

M.M. Spot

E.P. Manual

W.B. Manual

ISO 200

Shutter Speed 1/125

Available light across the window

Retouching black and white with Nik Silver Efex

As the sun sets on the SWT 458/5 junipers as they are refurbished, 458530 approaches Wokingham station at dusk with a an evening service to Reading from London Waterloo.

Phase 1 of the restoration and re-imagineering.

 

For more stop by www.yashicasailorboy.com

Thanks, C&C

️ SPQR - Phase I ️

 

▶️ Watch the Model Film in 4K on YouTube:

youtu.be/zEbGFWenbKI

 

▶️ Intro to SPQR Project:

youtu.be/AUoltNrMyR4

 

Support this unprecedented project on Patreon:

www.patreon.com/RoccoButtliere

 

Parts: 104,000+ (~1,700 unique)

 

Scale: 1:650

 

Dimensions: 57in x 289in (143cm x 231cm)

 

Research Time: 2,000+ hours since 2019

 

Design Time: 1,000+ hours in 200 days

 

Build Time: 600+ hours in 90 days

 

Photography: EClarke Photo 📷

 

© MMXXIII - Rocco Buttliere, LLC

The extension.........

 

Folded from square 20 cm, grid 1:64.

Amtrak Keystone Service 655 flies through Villanova University's campus under a remaining original PRR Position light signal tower, with the newly repainted Amtrak Metroliner Cabcar #9635 leading in new Phase VII paint (the first of the Metroliners to get this treatment!).

 

Though it's sparkled up in the newest paint scheme from Amtrak (sides included!) the Metroliner Cabcars still show their years of hard work they put into passenger service.

1 2 ••• 6 7 9 11 12 ••• 79 80