View allAll Photos Tagged heavylifting

Liebherr LTM 1400 - 7.1 Mobile Crane from Crane Services lifting concrete floor pieces at Queens Park High School Handbridge, Chester.

 

Liebherr LTM 1400-7.1

  

Calandkanaal Europoort 1-8-2015 . SAPURA ESMERALDA geladen op de MIGHTY SERVANT 3 , morgen vertrekt het transport naar Brazilië , daar word de SAPURA ESMERALDA afgebouwd.

ALE has completed the offloading, site transportation and installation of two reactors for the EGTL project at Escravos, Nigeria, as part of an ongoing commitment to receive and install all major equipment during the project. www.ale-heavylift.com

Beerkanaal Europoort 12-7-2017

To watch the full video visit our YouTube page: www.youtube.com/user/ALEHeavylift

 

The installation and operation of a high capacity temporary external barge ballasing system use to compensatate for tidal range changes and load transfer onto a floating barge. Typical for a heavy load-out of a structure in excess of 5,000te.

CON2108/0 Custom Paint

Heavy Lift Vessel .... On the River Tyne at the Offshore Technology Park Quay

Verhalen SEVEN BOREALIS van Europoort naar Rotterdam , SMIT EBRO assisteerde tot in de Maasmond 18-6-2017

DOCKWISE VANGUARD , STRANDWAY & SMIT PANTHER

Waalhaven Rotterdam 11-9-2017

Hoek van Holland 20-9-2022

Hoek van Holland 23-11-2021

CHINAHEAVYLIFT Self-Propelled Modular Transporters - Scheuerle SPMT, Goldhofer SPMT - www.chinaheavylift.com

 

CHINAHEAVYLIFT manufacture Scheuerle model SPMT. Capacity 50 ton/axle line, 1,500 ± 350 mm height and 2,430 mm width, axle base 1,400 mm with S690 high tensile structure steel, extremely robust and durable construction with high bending moment, main components are all imported from Germany, such as Mercedes-Benz, Rexroth, Hawe, TTC, STAUFF, AKG, world class quality with longer life time.

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Email: yoko@chinaheavylift.com Tel: +86 137 7422 2241

 

Modular Trailer (Multi Axle Trailer) - Goldhofer THP/SL, Nicolas MDED, Scheuerle InterCombi, Cometto.

www.chinaheavylift.com/products/modular-trailers/

 

SPMT (Self-Propelled Modular Transporters) - Scheuerle SPMT, Goldhofer SPMT

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Lowbed trailer, Lowboy trailer, Flatbed container trailer, Extendable trailer, Windmill Transport, Blades/Nacelle/Tower Section Transport, Tank Transporter

www.chinaheavylift.com/products/lowbed-trailer/

  

100 axle lines CHINAHEAVYLIFT SPMTs assist 3200t giant bridge section roll onto the barge

www.chinaheavylift.com/news/100-axle-lines-chinaheavylift...

 

April 11 – With the strong support from CHINAHEAVYLIFT SPMT, our client Guangdong LIFT Engineering Machinery Co.,Ltd(GPEC) was contracted by Wuchang Shipbuilding Industry to transport 3,200t giant bridge section roll-on to barge for Hong Kong-Zhuhai-Macau Bridge project in Zhongshan city, Guangdong province.

 

This giant bridge section, which total weighed 3,200 tonnes and had the dimensions 132.6 m x 33.1 m, were transported from the fabrication facility yard to the barge by using total 100-axle lines SPMTs. So, how to move this giant steel structure onto the barge safely and accurately? As there’s over 20m distance from the bridge section and barge, crane is not suitable for this project. Based on the analysis of actual situation, our client GPEC choose the better solution of CHINAHEAVYLIFT S2.43 Self Propelled Modular Transporters(SPMT), which is more cost-effective and easier to operate.

 

Detail CHINAHEAVYLIFT SPMT transport system configuration:

 

100 axle lines S2.43 SPMT (10 units – 6 lines module, 10 units – 4 lines module) compose 4 big SPMT module

4 PPU (390kw Mercedes Benz engine for Power Pack Unit)

1 Wireless Remote control

 

Normally it will take 5-6 hours to roll-on, but in this project, we need complete the whole process in 2 hours as the reason of Tidal influence. Also, high precision is essential for roll-on, deviation is controlled smaller than 5mm in every 100m movement. This requires everyone and every steps close-cooperation and no mistake permitted.

 

The most difficult is, when SPMT move onto the barge, the barge will swing and tilt with the change of weight. So how to keep balance? Thanks to the hydraulic steady system of CHINAHEAVYLIFT SPMT, which adopt reliable Germany brand main components and have hydraulic compensation stroke of approx. 700mm (±350mm). Hydraulic support cylinder on suspension is connected to each other by steel pipes and hose. With a cut-off valve (ball valve) for grouping the hydraulic cylinder. Support system is set to three hydraulic group according to cargo weight, center of gravity location and road conditions. This ensures a uniform axle load in Uneven road when traveling. Besides, the barge is equiped with pressurized cabin to outward drainage to ensure the balance.

 

Through two hours efforts, CHINAHEAVYLIFT SPMT successfully assist the 3200t giant bridge section roll-onto the barge, this is the first step of HZMB CB02 project, one historic move in Chinese Bridge Construction area. But For CHINAHEAVYLIFT, just another case with SPMT.

With a global network of operating centres and a large fleet of heavy cranes, specialist transport and installation equipment, ALE combines exceptional project management with engineering intelligence to offer worldwide transportation and lifting services to all industry sectors.

ALE - With years of experience and one of the most comprehensive fleets of transportation equipment in the UK and Europe, we are a renowned authority in moving and transporting any weight of load.

  

Re-registered in Indonesia, but not taken up, this Herc sits on the apron at Stansted in full Heavylift Cargo Airlines colours with Oil Spill Protection Southampton titles.

Hoek van Holland 29-9-2020 , ASSISTER onderweg naar Rhenus in de Europahaven.

10kg lift at 50cm reach.

 

ALE was responsible for the assembly and transportation of seven Liebherr ship to shore cranes from the Mina Zayed Port UAE.

  

CHINAHEAVYLIFT Self-Propelled Modular Transporters - Scheuerle SPMT, Goldhofer SPMT - www.chinaheavylift.com

 

CHINAHEAVYLIFT manufacture Scheuerle model SPMT. Capacity 50 ton/axle line, 1,500 ± 350 mm height and 2,430 mm width, axle base 1,400 mm with S690 high tensile structure steel, extremely robust and durable construction with high bending moment, main components are all imported from Germany, such as Mercedes-Benz, Rexroth, Hawe, TTC, STAUFF, AKG, world class quality with longer life time.

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Email: yoko@chinaheavylift.com Tel: +86 137 7422 2241

 

Modular Trailer (Multi Axle Trailer) - Goldhofer THP/SL, Nicolas MDED, Scheuerle InterCombi, Cometto.

www.chinaheavylift.com/products/modular-trailers/

 

SPMT (Self-Propelled Modular Transporters) - Scheuerle SPMT, Goldhofer SPMT

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Lowbed trailer, Lowboy trailer, Flatbed container trailer, Extendable trailer, Windmill Transport, Blades/Nacelle/Tower Section Transport, Tank Transporter

www.chinaheavylift.com/products/lowbed-trailer/

  

100 axle lines CHINAHEAVYLIFT SPMTs assist 3200t giant bridge section roll onto the barge

www.chinaheavylift.com/news/100-axle-lines-chinaheavylift...

 

April 11 – With the strong support from CHINAHEAVYLIFT SPMT, our client Guangdong LIFT Engineering Machinery Co.,Ltd(GPEC) was contracted by Wuchang Shipbuilding Industry to transport 3,200t giant bridge section roll-on to barge for Hong Kong-Zhuhai-Macau Bridge project in Zhongshan city, Guangdong province.

 

This giant bridge section, which total weighed 3,200 tonnes and had the dimensions 132.6 m x 33.1 m, were transported from the fabrication facility yard to the barge by using total 100-axle lines SPMTs. So, how to move this giant steel structure onto the barge safely and accurately? As there’s over 20m distance from the bridge section and barge, crane is not suitable for this project. Based on the analysis of actual situation, our client GPEC choose the better solution of CHINAHEAVYLIFT S2.43 Self Propelled Modular Transporters(SPMT), which is more cost-effective and easier to operate.

 

Detail CHINAHEAVYLIFT SPMT transport system configuration:

 

100 axle lines S2.43 SPMT (10 units – 6 lines module, 10 units – 4 lines module) compose 4 big SPMT module

4 PPU (390kw Mercedes Benz engine for Power Pack Unit)

1 Wireless Remote control

 

Normally it will take 5-6 hours to roll-on, but in this project, we need complete the whole process in 2 hours as the reason of Tidal influence. Also, high precision is essential for roll-on, deviation is controlled smaller than 5mm in every 100m movement. This requires everyone and every steps close-cooperation and no mistake permitted.

 

The most difficult is, when SPMT move onto the barge, the barge will swing and tilt with the change of weight. So how to keep balance? Thanks to the hydraulic steady system of CHINAHEAVYLIFT SPMT, which adopt reliable Germany brand main components and have hydraulic compensation stroke of approx. 700mm (±350mm). Hydraulic support cylinder on suspension is connected to each other by steel pipes and hose. With a cut-off valve (ball valve) for grouping the hydraulic cylinder. Support system is set to three hydraulic group according to cargo weight, center of gravity location and road conditions. This ensures a uniform axle load in Uneven road when traveling. Besides, the barge is equiped with pressurized cabin to outward drainage to ensure the balance.

 

Through two hours efforts, CHINAHEAVYLIFT SPMT successfully assist the 3200t giant bridge section roll-onto the barge, this is the first step of HZMB CB02 project, one historic move in Chinese Bridge Construction area. But For CHINAHEAVYLIFT, just another case with SPMT.

Liebherr LTM 1400 - 7.1 Mobile Crane from Crane Services lifting concrete floor pieces at Queens Park High School Handbridge, Chester.

 

Liebherr LTM 1400-7.1

  

Europahaven 8-3-2019

LZ-BAE Antonov AN-12BP (402001) Heavylift - London Stansted Airport 24-09-1995

CHINAHEAVYLIFT Self-Propelled Modular Transporters - Scheuerle SPMT, Goldhofer SPMT - www.chinaheavylift.com

 

CHINAHEAVYLIFT manufacture Scheuerle model SPMT. Capacity 50 ton/axle line, 1,500 ± 350 mm height and 2,430 mm width, axle base 1,400 mm with S690 high tensile structure steel, extremely robust and durable construction with high bending moment, main components are all imported from Germany, such as Mercedes-Benz, Rexroth, Hawe, TTC, STAUFF, AKG, world class quality with longer life time.

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Email: yoko@chinaheavylift.com Tel: +86 137 7422 2241

 

Modular Trailer (Multi Axle Trailer) - Goldhofer THP/SL, Nicolas MDED, Scheuerle InterCombi, Cometto.

www.chinaheavylift.com/products/modular-trailers/

 

SPMT (Self-Propelled Modular Transporters) - Scheuerle SPMT, Goldhofer SPMT

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Lowbed trailer, Lowboy trailer, Flatbed container trailer, Extendable trailer, Windmill Transport, Blades/Nacelle/Tower Section Transport, Tank Transporter

www.chinaheavylift.com/products/lowbed-trailer/

  

100 axle lines CHINAHEAVYLIFT SPMTs assist 3200t giant bridge section roll onto the barge

www.chinaheavylift.com/news/100-axle-lines-chinaheavylift...

 

April 11 – With the strong support from CHINAHEAVYLIFT SPMT, our client Guangdong LIFT Engineering Machinery Co.,Ltd(GPEC) was contracted by Wuchang Shipbuilding Industry to transport 3,200t giant bridge section roll-on to barge for Hong Kong-Zhuhai-Macau Bridge project in Zhongshan city, Guangdong province.

 

This giant bridge section, which total weighed 3,200 tonnes and had the dimensions 132.6 m x 33.1 m, were transported from the fabrication facility yard to the barge by using total 100-axle lines SPMTs. So, how to move this giant steel structure onto the barge safely and accurately? As there’s over 20m distance from the bridge section and barge, crane is not suitable for this project. Based on the analysis of actual situation, our client GPEC choose the better solution of CHINAHEAVYLIFT S2.43 Self Propelled Modular Transporters(SPMT), which is more cost-effective and easier to operate.

 

Detail CHINAHEAVYLIFT SPMT transport system configuration:

 

100 axle lines S2.43 SPMT (10 units – 6 lines module, 10 units – 4 lines module) compose 4 big SPMT module

4 PPU (390kw Mercedes Benz engine for Power Pack Unit)

1 Wireless Remote control

 

Normally it will take 5-6 hours to roll-on, but in this project, we need complete the whole process in 2 hours as the reason of Tidal influence. Also, high precision is essential for roll-on, deviation is controlled smaller than 5mm in every 100m movement. This requires everyone and every steps close-cooperation and no mistake permitted.

 

The most difficult is, when SPMT move onto the barge, the barge will swing and tilt with the change of weight. So how to keep balance? Thanks to the hydraulic steady system of CHINAHEAVYLIFT SPMT, which adopt reliable Germany brand main components and have hydraulic compensation stroke of approx. 700mm (±350mm). Hydraulic support cylinder on suspension is connected to each other by steel pipes and hose. With a cut-off valve (ball valve) for grouping the hydraulic cylinder. Support system is set to three hydraulic group according to cargo weight, center of gravity location and road conditions. This ensures a uniform axle load in Uneven road when traveling. Besides, the barge is equiped with pressurized cabin to outward drainage to ensure the balance.

 

Through two hours efforts, CHINAHEAVYLIFT SPMT successfully assist the 3200t giant bridge section roll-onto the barge, this is the first step of HZMB CB02 project, one historic move in Chinese Bridge Construction area. But For CHINAHEAVYLIFT, just another case with SPMT.

Nieuwe Waterweg 8-5-2017

CHINAHEAVYLIFT Self-Propelled Modular Transporters - Scheuerle SPMT, Goldhofer SPMT - www.chinaheavylift.com

 

CHINAHEAVYLIFT manufacture Scheuerle model SPMT. Capacity 50 ton/axle line, 1,500 ± 350 mm height and 2,430 mm width, axle base 1,400 mm with S690 high tensile structure steel, extremely robust and durable construction with high bending moment, main components are all imported from Germany, such as Mercedes-Benz, Rexroth, Hawe, TTC, STAUFF, AKG, world class quality with longer life time.

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Email: yoko@chinaheavylift.com Tel: +86 137 7422 2241

 

Modular Trailer (Multi Axle Trailer) - Goldhofer THP/SL, Nicolas MDED, Scheuerle InterCombi, Cometto.

www.chinaheavylift.com/products/modular-trailers/

 

SPMT (Self-Propelled Modular Transporters) - Scheuerle SPMT, Goldhofer SPMT

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Lowbed trailer, Lowboy trailer, Flatbed container trailer, Extendable trailer, Windmill Transport, Blades/Nacelle/Tower Section Transport, Tank Transporter

www.chinaheavylift.com/products/lowbed-trailer/

  

100 axle lines CHINAHEAVYLIFT SPMTs assist 3200t giant bridge section roll onto the barge

www.chinaheavylift.com/news/100-axle-lines-chinaheavylift...

 

April 11 – With the strong support from CHINAHEAVYLIFT SPMT, our client Guangdong LIFT Engineering Machinery Co.,Ltd(GPEC) was contracted by Wuchang Shipbuilding Industry to transport 3,200t giant bridge section roll-on to barge for Hong Kong-Zhuhai-Macau Bridge project in Zhongshan city, Guangdong province.

 

This giant bridge section, which total weighed 3,200 tonnes and had the dimensions 132.6 m x 33.1 m, were transported from the fabrication facility yard to the barge by using total 100-axle lines SPMTs. So, how to move this giant steel structure onto the barge safely and accurately? As there’s over 20m distance from the bridge section and barge, crane is not suitable for this project. Based on the analysis of actual situation, our client GPEC choose the better solution of CHINAHEAVYLIFT S2.43 Self Propelled Modular Transporters(SPMT), which is more cost-effective and easier to operate.

 

Detail CHINAHEAVYLIFT SPMT transport system configuration:

 

100 axle lines S2.43 SPMT (10 units – 6 lines module, 10 units – 4 lines module) compose 4 big SPMT module

4 PPU (390kw Mercedes Benz engine for Power Pack Unit)

1 Wireless Remote control

 

Normally it will take 5-6 hours to roll-on, but in this project, we need complete the whole process in 2 hours as the reason of Tidal influence. Also, high precision is essential for roll-on, deviation is controlled smaller than 5mm in every 100m movement. This requires everyone and every steps close-cooperation and no mistake permitted.

 

The most difficult is, when SPMT move onto the barge, the barge will swing and tilt with the change of weight. So how to keep balance? Thanks to the hydraulic steady system of CHINAHEAVYLIFT SPMT, which adopt reliable Germany brand main components and have hydraulic compensation stroke of approx. 700mm (±350mm). Hydraulic support cylinder on suspension is connected to each other by steel pipes and hose. With a cut-off valve (ball valve) for grouping the hydraulic cylinder. Support system is set to three hydraulic group according to cargo weight, center of gravity location and road conditions. This ensures a uniform axle load in Uneven road when traveling. Besides, the barge is equiped with pressurized cabin to outward drainage to ensure the balance.

 

Through two hours efforts, CHINAHEAVYLIFT SPMT successfully assist the 3200t giant bridge section roll-onto the barge, this is the first step of HZMB CB02 project, one historic move in Chinese Bridge Construction area. But For CHINAHEAVYLIFT, just another case with SPMT.

CHINAHEAVYLIFT Self-Propelled Modular Transporters - Scheuerle SPMT, Goldhofer SPMT - www.chinaheavylift.com

 

CHINAHEAVYLIFT manufacture Scheuerle model SPMT. Capacity 50 ton/axle line, 1,500 ± 350 mm height and 2,430 mm width, axle base 1,400 mm with S690 high tensile structure steel, extremely robust and durable construction with high bending moment, main components are all imported from Germany, such as Mercedes-Benz, Rexroth, Hawe, TTC, STAUFF, AKG, world class quality with longer life time.

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Email: yoko@chinaheavylift.com Tel: +86 137 7422 2241

 

Modular Trailer (Multi Axle Trailer) - Goldhofer THP/SL, Nicolas MDED, Scheuerle InterCombi, Cometto.

www.chinaheavylift.com/products/modular-trailers/

 

SPMT (Self-Propelled Modular Transporters) - Scheuerle SPMT, Goldhofer SPMT

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Lowbed trailer, Lowboy trailer, Flatbed container trailer, Extendable trailer, Windmill Transport, Blades/Nacelle/Tower Section Transport, Tank Transporter

www.chinaheavylift.com/products/lowbed-trailer/

  

100 axle lines CHINAHEAVYLIFT SPMTs assist 3200t giant bridge section roll onto the barge

www.chinaheavylift.com/news/100-axle-lines-chinaheavylift...

 

April 11 – With the strong support from CHINAHEAVYLIFT SPMT, our client Guangdong LIFT Engineering Machinery Co.,Ltd(GPEC) was contracted by Wuchang Shipbuilding Industry to transport 3,200t giant bridge section roll-on to barge for Hong Kong-Zhuhai-Macau Bridge project in Zhongshan city, Guangdong province.

 

This giant bridge section, which total weighed 3,200 tonnes and had the dimensions 132.6 m x 33.1 m, were transported from the fabrication facility yard to the barge by using total 100-axle lines SPMTs. So, how to move this giant steel structure onto the barge safely and accurately? As there’s over 20m distance from the bridge section and barge, crane is not suitable for this project. Based on the analysis of actual situation, our client GPEC choose the better solution of CHINAHEAVYLIFT S2.43 Self Propelled Modular Transporters(SPMT), which is more cost-effective and easier to operate.

 

Detail CHINAHEAVYLIFT SPMT transport system configuration:

 

100 axle lines S2.43 SPMT (10 units – 6 lines module, 10 units – 4 lines module) compose 4 big SPMT module

4 PPU (390kw Mercedes Benz engine for Power Pack Unit)

1 Wireless Remote control

 

Normally it will take 5-6 hours to roll-on, but in this project, we need complete the whole process in 2 hours as the reason of Tidal influence. Also, high precision is essential for roll-on, deviation is controlled smaller than 5mm in every 100m movement. This requires everyone and every steps close-cooperation and no mistake permitted.

 

The most difficult is, when SPMT move onto the barge, the barge will swing and tilt with the change of weight. So how to keep balance? Thanks to the hydraulic steady system of CHINAHEAVYLIFT SPMT, which adopt reliable Germany brand main components and have hydraulic compensation stroke of approx. 700mm (±350mm). Hydraulic support cylinder on suspension is connected to each other by steel pipes and hose. With a cut-off valve (ball valve) for grouping the hydraulic cylinder. Support system is set to three hydraulic group according to cargo weight, center of gravity location and road conditions. This ensures a uniform axle load in Uneven road when traveling. Besides, the barge is equiped with pressurized cabin to outward drainage to ensure the balance.

 

Through two hours efforts, CHINAHEAVYLIFT SPMT successfully assist the 3200t giant bridge section roll-onto the barge, this is the first step of HZMB CB02 project, one historic move in Chinese Bridge Construction area. But For CHINAHEAVYLIFT, just another case with SPMT.

CHINAHEAVYLIFT Self-Propelled Modular Transporters - Scheuerle SPMT, Goldhofer SPMT - www.chinaheavylift.com

 

CHINAHEAVYLIFT manufacture Scheuerle model SPMT. Capacity 50 ton/axle line, 1,500 ± 350 mm height and 2,430 mm width, axle base 1,400 mm with S690 high tensile structure steel, extremely robust and durable construction with high bending moment, main components are all imported from Germany, such as Mercedes-Benz, Rexroth, Hawe, TTC, STAUFF, AKG, world class quality with longer life time.

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Email: yoko@chinaheavylift.com Tel: +86 137 7422 2241

 

Modular Trailer (Multi Axle Trailer) - Goldhofer THP/SL, Nicolas MDED, Scheuerle InterCombi, Cometto.

www.chinaheavylift.com/products/modular-trailers/

 

SPMT (Self-Propelled Modular Transporters) - Scheuerle SPMT, Goldhofer SPMT

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Lowbed trailer, Lowboy trailer, Flatbed container trailer, Extendable trailer, Windmill Transport, Blades/Nacelle/Tower Section Transport, Tank Transporter

www.chinaheavylift.com/products/lowbed-trailer/

  

100 axle lines CHINAHEAVYLIFT SPMTs assist 3200t giant bridge section roll onto the barge

www.chinaheavylift.com/news/100-axle-lines-chinaheavylift...

 

April 11 – With the strong support from CHINAHEAVYLIFT SPMT, our client Guangdong LIFT Engineering Machinery Co.,Ltd(GPEC) was contracted by Wuchang Shipbuilding Industry to transport 3,200t giant bridge section roll-on to barge for Hong Kong-Zhuhai-Macau Bridge project in Zhongshan city, Guangdong province.

 

This giant bridge section, which total weighed 3,200 tonnes and had the dimensions 132.6 m x 33.1 m, were transported from the fabrication facility yard to the barge by using total 100-axle lines SPMTs. So, how to move this giant steel structure onto the barge safely and accurately? As there’s over 20m distance from the bridge section and barge, crane is not suitable for this project. Based on the analysis of actual situation, our client GPEC choose the better solution of CHINAHEAVYLIFT S2.43 Self Propelled Modular Transporters(SPMT), which is more cost-effective and easier to operate.

 

Detail CHINAHEAVYLIFT SPMT transport system configuration:

 

100 axle lines S2.43 SPMT (10 units – 6 lines module, 10 units – 4 lines module) compose 4 big SPMT module

4 PPU (390kw Mercedes Benz engine for Power Pack Unit)

1 Wireless Remote control

 

Normally it will take 5-6 hours to roll-on, but in this project, we need complete the whole process in 2 hours as the reason of Tidal influence. Also, high precision is essential for roll-on, deviation is controlled smaller than 5mm in every 100m movement. This requires everyone and every steps close-cooperation and no mistake permitted.

 

The most difficult is, when SPMT move onto the barge, the barge will swing and tilt with the change of weight. So how to keep balance? Thanks to the hydraulic steady system of CHINAHEAVYLIFT SPMT, which adopt reliable Germany brand main components and have hydraulic compensation stroke of approx. 700mm (±350mm). Hydraulic support cylinder on suspension is connected to each other by steel pipes and hose. With a cut-off valve (ball valve) for grouping the hydraulic cylinder. Support system is set to three hydraulic group according to cargo weight, center of gravity location and road conditions. This ensures a uniform axle load in Uneven road when traveling. Besides, the barge is equiped with pressurized cabin to outward drainage to ensure the balance.

 

Through two hours efforts, CHINAHEAVYLIFT SPMT successfully assist the 3200t giant bridge section roll-onto the barge, this is the first step of HZMB CB02 project, one historic move in Chinese Bridge Construction area. But For CHINAHEAVYLIFT, just another case with SPMT.

A Leibherr heavylifting crane in place at Chatham Station Kent to remove an old footbridge this weekend.

Hoek van Holland 22-3-2020 , het kraaneiland arriveerde voor de eerste keer in Rotterdam.

CHINAHEAVYLIFT Self-Propelled Modular Transporters - Scheuerle SPMT, Goldhofer SPMT - www.chinaheavylift.com

 

CHINAHEAVYLIFT manufacture Scheuerle model SPMT. Capacity 50 ton/axle line, 1,500 ± 350 mm height and 2,430 mm width, axle base 1,400 mm with S690 high tensile structure steel, extremely robust and durable construction with high bending moment, main components are all imported from Germany, such as Mercedes-Benz, Rexroth, Hawe, TTC, STAUFF, AKG, world class quality with longer life time.

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Email: yoko@chinaheavylift.com Tel: +86 137 7422 2241

 

Modular Trailer (Multi Axle Trailer) - Goldhofer THP/SL, Nicolas MDED, Scheuerle InterCombi, Cometto.

www.chinaheavylift.com/products/modular-trailers/

 

SPMT (Self-Propelled Modular Transporters) - Scheuerle SPMT, Goldhofer SPMT

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Lowbed trailer, Lowboy trailer, Flatbed container trailer, Extendable trailer, Windmill Transport, Blades/Nacelle/Tower Section Transport, Tank Transporter

www.chinaheavylift.com/products/lowbed-trailer/

  

100 axle lines CHINAHEAVYLIFT SPMTs assist 3200t giant bridge section roll onto the barge

www.chinaheavylift.com/news/100-axle-lines-chinaheavylift...

 

April 11 – With the strong support from CHINAHEAVYLIFT SPMT, our client Guangdong LIFT Engineering Machinery Co.,Ltd(GPEC) was contracted by Wuchang Shipbuilding Industry to transport 3,200t giant bridge section roll-on to barge for Hong Kong-Zhuhai-Macau Bridge project in Zhongshan city, Guangdong province.

 

This giant bridge section, which total weighed 3,200 tonnes and had the dimensions 132.6 m x 33.1 m, were transported from the fabrication facility yard to the barge by using total 100-axle lines SPMTs. So, how to move this giant steel structure onto the barge safely and accurately? As there’s over 20m distance from the bridge section and barge, crane is not suitable for this project. Based on the analysis of actual situation, our client GPEC choose the better solution of CHINAHEAVYLIFT S2.43 Self Propelled Modular Transporters(SPMT), which is more cost-effective and easier to operate.

 

Detail CHINAHEAVYLIFT SPMT transport system configuration:

 

100 axle lines S2.43 SPMT (10 units – 6 lines module, 10 units – 4 lines module) compose 4 big SPMT module

4 PPU (390kw Mercedes Benz engine for Power Pack Unit)

1 Wireless Remote control

 

Normally it will take 5-6 hours to roll-on, but in this project, we need complete the whole process in 2 hours as the reason of Tidal influence. Also, high precision is essential for roll-on, deviation is controlled smaller than 5mm in every 100m movement. This requires everyone and every steps close-cooperation and no mistake permitted.

 

The most difficult is, when SPMT move onto the barge, the barge will swing and tilt with the change of weight. So how to keep balance? Thanks to the hydraulic steady system of CHINAHEAVYLIFT SPMT, which adopt reliable Germany brand main components and have hydraulic compensation stroke of approx. 700mm (±350mm). Hydraulic support cylinder on suspension is connected to each other by steel pipes and hose. With a cut-off valve (ball valve) for grouping the hydraulic cylinder. Support system is set to three hydraulic group according to cargo weight, center of gravity location and road conditions. This ensures a uniform axle load in Uneven road when traveling. Besides, the barge is equiped with pressurized cabin to outward drainage to ensure the balance.

 

Through two hours efforts, CHINAHEAVYLIFT SPMT successfully assist the 3200t giant bridge section roll-onto the barge, this is the first step of HZMB CB02 project, one historic move in Chinese Bridge Construction area. But For CHINAHEAVYLIFT, just another case with SPMT.

CHINAHEAVYLIFT Self-Propelled Modular Transporters - Scheuerle SPMT, Goldhofer SPMT - www.chinaheavylift.com

 

CHINAHEAVYLIFT manufacture Scheuerle model SPMT. Capacity 50 ton/axle line, 1,500 ± 350 mm height and 2,430 mm width, axle base 1,400 mm with S690 high tensile structure steel, extremely robust and durable construction with high bending moment, main components are all imported from Germany, such as Mercedes-Benz, Rexroth, Hawe, TTC, STAUFF, AKG, world class quality with longer life time.

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Email: yoko@chinaheavylift.com Tel: +86 137 7422 2241

 

Modular Trailer (Multi Axle Trailer) - Goldhofer THP/SL, Nicolas MDED, Scheuerle InterCombi, Cometto.

www.chinaheavylift.com/products/modular-trailers/

 

SPMT (Self-Propelled Modular Transporters) - Scheuerle SPMT, Goldhofer SPMT

www.chinaheavylift.com/products/self-propelled-modular-tr...

 

Lowbed trailer, Lowboy trailer, Flatbed container trailer, Extendable trailer, Windmill Transport, Blades/Nacelle/Tower Section Transport, Tank Transporter

www.chinaheavylift.com/products/lowbed-trailer/

  

100 axle lines CHINAHEAVYLIFT SPMTs assist 3200t giant bridge section roll onto the barge

www.chinaheavylift.com/news/100-axle-lines-chinaheavylift...

 

April 11 – With the strong support from CHINAHEAVYLIFT SPMT, our client Guangdong LIFT Engineering Machinery Co.,Ltd(GPEC) was contracted by Wuchang Shipbuilding Industry to transport 3,200t giant bridge section roll-on to barge for Hong Kong-Zhuhai-Macau Bridge project in Zhongshan city, Guangdong province.

 

This giant bridge section, which total weighed 3,200 tonnes and had the dimensions 132.6 m x 33.1 m, were transported from the fabrication facility yard to the barge by using total 100-axle lines SPMTs. So, how to move this giant steel structure onto the barge safely and accurately? As there’s over 20m distance from the bridge section and barge, crane is not suitable for this project. Based on the analysis of actual situation, our client GPEC choose the better solution of CHINAHEAVYLIFT S2.43 Self Propelled Modular Transporters(SPMT), which is more cost-effective and easier to operate.

 

Detail CHINAHEAVYLIFT SPMT transport system configuration:

 

100 axle lines S2.43 SPMT (10 units – 6 lines module, 10 units – 4 lines module) compose 4 big SPMT module

4 PPU (390kw Mercedes Benz engine for Power Pack Unit)

1 Wireless Remote control

 

Normally it will take 5-6 hours to roll-on, but in this project, we need complete the whole process in 2 hours as the reason of Tidal influence. Also, high precision is essential for roll-on, deviation is controlled smaller than 5mm in every 100m movement. This requires everyone and every steps close-cooperation and no mistake permitted.

 

The most difficult is, when SPMT move onto the barge, the barge will swing and tilt with the change of weight. So how to keep balance? Thanks to the hydraulic steady system of CHINAHEAVYLIFT SPMT, which adopt reliable Germany brand main components and have hydraulic compensation stroke of approx. 700mm (±350mm). Hydraulic support cylinder on suspension is connected to each other by steel pipes and hose. With a cut-off valve (ball valve) for grouping the hydraulic cylinder. Support system is set to three hydraulic group according to cargo weight, center of gravity location and road conditions. This ensures a uniform axle load in Uneven road when traveling. Besides, the barge is equiped with pressurized cabin to outward drainage to ensure the balance.

 

Through two hours efforts, CHINAHEAVYLIFT SPMT successfully assist the 3200t giant bridge section roll-onto the barge, this is the first step of HZMB CB02 project, one historic move in Chinese Bridge Construction area. But For CHINAHEAVYLIFT, just another case with SPMT.

ALE completed the transport and installation of seven locomotives int he port of Nouadhibou, Mauritania.

  

De-rigging the Nicolas girder frame trailer at ThamesPort, IoG.

video youtu.be/XiTE0pXJ22c

Aankomst in de Maasmond van de Pioneering Spirit van Allseas 17-5-2018

1 2 ••• 44 45 47 49 50 ••• 79 80