View allAll Photos Tagged completed
Muslin complete. None of the details or flourished are added but the basic shape is there. We'll sew how it fits later
the X-axis has been taken from an old canon inkjet printer i got from a junkyard for 50 bucks. The z-axis (with the yellow pencil) has been scavenged from an old CD-ROM drive's tray assembly. ou can see my cluttered new "worktable" in the background
A new "Little Sister" wooden doll is completed! Little Sister is the second youngest doll in my 'Sisters' series. They're around 18cm tall.
I've been temporarily calling this commission girl "Jen", after her soon-to-be owner =P. I've slightly upgraded her joints to function better, compared to the original design of Little Sis (she now has ball jointed knees and wrists).
Hope you like her!
HafenCity Hamburg
HafenCity is being developed from west to east and from north to south – 62 projects are completed in 2017 and another 70 are under construction or in the planning stage; deals through sale of land or exclusive options have been closed on around 1.65 million sqm GFA. In the meantime, HafenCity has established its popularity as a place to live and work. Nowadays more than 1,800 residential units are completed approx. 12,000 people work in HafenCity as a whole, employed by more than 730 companies
HafenCity is among the most outstanding urban development projects on the waterfront anywhere. Based on a sophisticated concept, it is expanding the area of Hamburg City by 40 percent. It also has spin-off effects for the existing city centre, the whole of the Hanseatic city state with its 1.8 million inhabitants and its surrounding metropolitan region with a population of some five million. Hamburg’s identity as a maritime port city will be underscored in the process and HafenCity itself serve as a blueprint for the development of the European city of the 21st century. It is already regarded as a model for major international urban development projects, although its development timescale continues through to 2025/30.
In 2009, Am Sandtorkai/Dalmannkai led the way as the first completed neighbourhood in HafenCity’s development. The beginning of 2017 saw the opening of Hamburg’s outstanding and internationally applauded new Elbphilharmonie Concert Hall, designed by Herzog & de Meuron, which sits atop the historic Kaispeicher A warehouse building. The new Hamburg landmark accommodates two concert auditoria, a five-star hotel and around 45 apartments. Close by, completion of the second large neighbourhood, Am Sandtorpark/Grasbrook, popular with many young families, followed at the beginning of 2011. The first primary school with kindergarten opened here in 2009, followed in 2013 by the popular Grasbrook park – primary school children were also involved in its design. Meanwhile, on Strandkai to the south, the first buildings completed there in 2009, Unilever headquarters and the Marco Polo Tower, an ensemble of office building and residential multi-storey, won multiple awards. At the same time, the first open spaces directly adjoining the River Elbe were opened up.
Complete Runner WY Cross Country League Race 4, Thornes Park
Incorporating Club Cross Country Championships
Sunday 4th December.
D26693vs. Worm's Head on The Gower in South Wales is an off shore headland, connected to the mainland by a rocky causeway. But this causeway is only passable at low tide, so care is needed when crossing to make sure that there is sufficient time to return before the tide comes in again. People often get stranded over there - and this includes the famous Welsh poet Dylan Thomas!
On the occasion of my visit the tide came in and Worm's Head causeway rapidly disappeared under the rising waters. Several people were cut off and stranded on Worm’s Head so the coastguards called out the inshore lifeboat to come and rescue them.
Mission completed, the RNLI inshore lifeboat turns for home.
This area has the World’s second highest tidal range which can be up to 49 feet / 15 metres and more details of Worm's Head can be found here:
en.wikipedia.org/wiki/Worm%27s_Head
Tuesday, 15th August, 2023. Copyright © Ron Fisher 2024.
after president obama deplaned at mccarran international airport, S28000 departed KLAS and landed KLSV (nellis air force base) located 10 miles to our north. (view from KLAS tower)
Olafur Eliasson Reveals Versailles Waterfall: The artist finally completes his special project for the Palace... t.co/cIOTr96HBd (via Twitter twitter.com/luxury_hd/status/740509797246603265)
Ok, I missed one. I was at the Mad Men theme party last night, taking pictures. It's a lame excuse, but honestly: I couldn't be bothered to talk up some stranger after taking pictures for hours.
Most photos were taken either on request, or, more often, when the moment was right. Party pictures.
This image was different; I had seen her at the same party before, and already tried to snatch a pic, but it didn't work. So yesterday I told her that I was going to take another one later on. The guy didn't look like he was going to enjoy me small talking, so I let them carry on instead.
Oh, her name is not Molly, but she reminds me of Molly Ringwald.
This arch will be the main support for the span of a new bridge over the Colorado River next to Hoover Dam.
*FAIRWEATHER*cx complete bike
BLUE LUG custom
SPEC
Frame:*FAIRWEATHER*track BLUE LUG CUSTOM PAINT by COOK PAINT WORKS
Headset:*CHRIS KING*
Wheels:*H PLUS SON*archetype rim × *GRAN-COMPE* smal track hub
Tire:*PANARACER*pasela
Brake:*DIA=COMPE*br100
Crankset:*FAIRWEATHER*cx crank
Handle:*NITTO*rb001 handle
*FAIRWEATHER* crystal3 stem
*CINELLI* unicanitor saddle Barry McGee
Pedal:*MKS*bm-7