View allAll Photos Tagged completed

Made by me!~ Instructions to come at diynamite.com

 

You gotta love my pillow people pillow case too!

 

Full Region complete Yacht Club & Marina. build for Zack Friller on the Blake sea to visit or rent a mooring maps.secondlife.com/secondlife/Soreide/55/139/22 Discover the ultimate boating experience at The Mast Yacht Club & Marina. From boat dock rentals to live entertainment featuring talented singers and DJs, our breathtaking club invites you to immerse yourself in a world of luxury and excitement. Dm me or Creative Habitats SL to view more builds.✌

  

Soldiers assigned to Fort Pickett’s Maneuver Area Training Equipment Site, or MATES, reinstall two tracked vehicles Jan. 19, 2016, after completing exterior refurbishments on the vehicles. Both vehicles, originally used by the U.S. Army during the Vietnam and Korean Wars, have been on continuous display along Fort Pickett’s Military Road for approximately 20 years. For MATES personnel, the refurbishment process included cleaning the vehicles, sandblasting them down to bare metal and finally repainting and stenciling the vehicles to their original specifications. MATES personnel are also in the process of refurbishing the M60 Patton Main Battle Tank that usually resides adjacent to Fort Pickett’s main entrance. (Photo by Sgt. 1st Class Terra C. Gatti, Virginia National Guard Public Affairs)

The final completed pictures of the Carl Sagan Corvair Spyder convertible. Restoration by Dennis Dorogi 5/29/2014 restoration started in 2009, see other Sagan Spyder albums for step by step restoration

 

Complete with goat...and where the Internet was very pole pole (slow)

The removal of the rear seating in my new (used) Ram City wagon. It includes both side panels and the package trays, the seatbelt & retractor mechs for both sides, and both seats. Make an offer.

Merdean Munes from Complete Dance Company performs as part of Street by Sweden, wearing a Pippi Longstocking wig while guests watch. By Tobias Andersson Åkerblom

Complete Run Through Part 2

 

built in TheLab™ by Article19

www.article19.co.uk

Complete suite includes the mattress

Other than the bullhorn bars and pedals, this bike is stock. It's been lovely thus far.

My Complete CPs <3

 

CP Soony (Kaede)

CP Lishe (Kira

CP El (Yori)

Pattern: Irish hiking scarf

Yarn: SWTC's Karaoke (50% Soy Silk, 50% Wool) - Mermaid Mix

sticky rice is a must at dinner. (i can live without, but don't tell my fam that)

The back of the pack crew of the Lake Auburn half marathon. It didn’t take long for me to lose sight of these athletes. But I did complete my training and I did finish so there is that.

Completed custom fabricated bed with bedding.

Here's the whole outfit. I came up with the idea over the weekend, it suddenly all came together! For sale on Etsy.

des mitaines de même.

the straps haven't been oiled yet, but check out that sexy butt stitching my Wolf did.

Photographed by Beekeeper for reference purpose

The enquiry is complete.

The vehicle details for VRR 385Y are:

Date of Liability 01 07 1996

Date of First Registration 13 08 1982

Year of Manufacture 1982

Cylinder Capacity (cc) 998cc

CO2 Emissions Not Available

Fuel Type PETROL

Export Marker N

Vehicle Status Unlicensed

Vehicle Colour SILVER

Vehicle Type Approval Not Available

Completed in 1962. The Peter Kaffka designed building borrows it's shape from the BC Electric Building. When completed, it was the tallest apartment building in western Canada at 83.2 m (272 ft.).

1 2 ••• 38 39 41 43 44 ••• 79 80