View allAll Photos Tagged class2

The Aberlemno 2, class II Pictish symbol stone.

 

A battle scene on the opposite face is believed to depict the Battle of Dunnichen, also called the Battle of Nechtansmere in 685 A.D. King Bridei III was leader of the Pictish army.

 

The helmeted soldiers are believed to be the Anglo Saxons from Northumbria who were defeated outright and lost their lands north of Northumbria such as Fife.

 

A raven is drawn feeding on a dead Anglo Saxon. The Anglo Saxon King Edwin of Deira may be depicted in this battle scene on horseback or the dead warrior on the ground. Two Anglo Saxons are shown having lost their shields.

 

The Picts appear to have no helmets. The Pictish horsemen appear to have stirrups so that they can hold a spear and a shield unlike the Anglo Saxons.

 

The Pictish stategy appears to be three ranks. The first soldier has a sword for close combat, protected with a spear carried by the soldier behind. A third spearman is in reserve.

 

The stone slab is believed to have been produced two to three centuries after the battle.

 

The Aberlemno 3, class II Pictish symbol stone, also called the Great Stone. The ornate Celtic cross is impressive with two angels either side, one reading a book.

 

A hunting scene and the double disc Pictish symbol is visible on the opposite face which is not visible from the roadside. Three trumpeters are also visible.

 

The meaning of these symbols commonly carved by the Picts is unknown.

 

Strangely the missionaries or scribes from the Celtic church did not record the meaning of the symbols in their texts. This was even more strange as Celtic christian crosses were engraved on one side of the class II symbol stones or cross slabs.

 

Links:

en.wikipedia.org/wiki/Aberlemno

www.scribd.com/doc/2341785/The-Picts-and-Sculptured-Stones

 

Ex-LMS Ivatt Class 2 2-6-2T No.41241 once again shows off its unique Keighley and Worth Valley red livery at Sheringham station on the late afternoon of 2nd April 2022. This was the condition in which the Ivatt double-headed the KWVR's Reopening Special with USA 0-6-0T No.30072 on 29th June 1968, and reapplied for the 50th anniversary re-enactment in 2018.

 

In the background, resident GER Y14 (LNER J15) 0-6-0 No.564 shares company with the Ivatt on Platform 1.

BR Standard Class 2 2-6-0 No 78019 at Willesden Shed

18 December 1963

FG Steinle

LMR Class 2 46499 on Carnforth MPD

Reshot this with a little more care two weeks later into fall: www.flickr.com/photos/kscherer11/276713165/

York Races - Saturday 26th August 2023

scanned negative at 3200dpi.

With so much steam leakage it's a wonder the crew could see where they were going, certainly the fireman seems to be peering through the gloom!

Standard Class 2 78019 with Ivatt Class 2 46521

 

Great Central Railway

 

31st January 2015

visiting u class2-6-0 31806 proceeding towards apesford crossing with a froghall -cauldon low gala special

LMS Ivatt Class 2 2-6-2T No 41207 at Shrewsbury Shed

19 July 1964

FG Steinle

Ivatt Class 2 2-6-2T No 41283 stands in line in company with Standard Class 4 2-6-4T No 80144 and Schools Class 4-4-0 No 30929 Malvern at Brighton Shed

1961

Christmas is a-coming and the goose is getting fat. Which means it will soon be time for the GC's Santa Specials again. A mere 10 years ago Ivatt Class 2 2-6-4T 41312 prepares to leave Loughborough with just such a train.

 

41312 was visiting from the Mid-Hants Railway at the time. I was still a cleaner then but I got a real Christmas treat in the shape of 2 footplate rides, the first on 75014 and the second on this fine engine.

LMS Ivatt Class 2 2-6-0 No 46511 at Oswestry Shed

29 September 1963

FG Steinle

46521 heads for Leicester on the GCR having just gone under Woodthorpe Bridge.

BR Standard Class 2 2-6-2T No 84011 at Preston Station

19 July 1963

FG Steinle

The Aberlemno 2, class II Pictish symbol stone.

 

A battle scene on the opposite face is believed to depict the Battle of Dunnichen, also called the Battle of Nechtansmere in 685 A.D.

 

The helmeted soldiers are believed to be the Anglo Saxons from Northumbria who were defeated outright and lost their lands north of Northumbria which included the kingom of Fife and Lothian.

 

A raven is drawn feeding on a dead Anglo Saxon. The Anglo Saxon King Edwin of Deira may be depicted in this battle scene on horseback or the dead warrior on the ground. Two Anglo Saxons are shown having lost their shields.

 

The Picts appear to have no helmets. The Pictish horsemen appear to have stirrups so that they can hold a spear and a shield unlike the Anglo Saxons.

 

The Pictish stategy appears to be three ranks. The first soldier has a swrod for close combat, prottected with a spear carried by the soldier behind. A third spearman is in reserve.

 

The stone slab is believed to have been produced two to three centuries after the battle.

 

The Aberlemno 3, class II Pictish symbol stone, also called the Great Stone. The ornate Celtic cross is impressive with two angels either side, one reading a book.

 

A hunting scene and the double disc Pictish symbol is visible on the opposite face which is not visible from the roadside. Three trumpeters are also visible.

 

The meaning of these symbols commonly carved by the Picts is unknown.

 

Strangely the missionaries or scribes from the Celtic church did not record the meaning of the symbols in their texts. This was even more strange as Celtic christian crosses were engraved on one side of the class II symbol stones or cross slabs.

 

Links:

en.wikipedia.org/wiki/Aberlemno

www.scribd.com/doc/2341785/The-Picts-and-Sculptured-Stones

 

Loughborough GCR 18/04/2015

 

SR LMR class2 2-6-2T 41287 on Eastleigh MPD

A general view of Stranraer Shed with 46467 in the foreground

20 July 1963

FG Steinle

First train of the day enters the loop at Broomhill Ivatt Class2 No.46512 leads with 37 674 on rear. Recently acquired observation car behind the steam engine.

 

Ivatt LMS Class 2 2-6-0 No 46467 at Stranraer Shed

18 July 1963

FG Steinle

LMS Ivatt Class 4 2-6-0 No 43047 at Swindon Shed

26 July 1964

FG Steinle

A 'Class II Pictish Symbol Stone', standing in the grounds/ruin of Elgin Cathedral, Elgin. This stone was ploughed up by a farmer in 1894. This side (the back) of the stone has a 'double disk and Z-rod' above a 'crescent and V-rod' symbol. Below there two symbols is a hunting scene, including hunters on horses, birds of prey (including one on the on arm of the party leader), hounds, and deer.

British Railways (Midland Region) 2-6-0 Class 2 No. 46521 at Rothley

 

This locomotive was originally preserved at the Severn Valley Railway and was the star of BBC TV Drama series 'Oh Doctor Beeching!' when it was named 'Blossom'. She hauled three carmine and cream Mark 1 carriages over Victoria Bridge and into/out of Arley Station, which itself was renamed 'Hatley'.

More information given by Emile Badawy in comment below:

"It is actually Sandringham station, and the train is bound for Flinders Street station, Melbourne. The little E class 2-4-2 tank engine was built specifically for this type of work, and they did not often venture away from the metropolis."

Alejandra Salazar Salame

Lady Victoria was always a good student at college. Paying attention in class and taking copious notes help in studying for exams.

BR Standard Class 2 locomotive

Rocky goes over fire pump operations and maintenance with ODHFS members at CFDEMS Station 15 next to the Chesterfield County (VA) Airport.

16.11.2013. LMS Ivatt Class 2 2-6-0 No 46521 storms up the grade towards Woodthorpe with a late afternoon train from Loughborough.

Samples from the around 1650 B&W survey images taken in 1988 for the Geelong City Urban Conservation Study, Graeme Butler.

`In 1866 a board established by the Colonial government

in 1864 to promote Victorian industry, awarded £1500 to

the Victorian Woollen & Cloth Manufacturing Co. to

aid their establishment as the first woollen mill in the

colony. Geelong was well-suited for such an investment

given its proximity both to the raw materials and the

ex-gold seeking labour force from the Ballarat region, the

rail, port and river facilities, and the investor potential of

the grazier class2.

Messrs. W. F. Sayers (secretary pro. tem.), Slater & John

Woods (engineer, manager pro. tem.) advertised for

shareholders, to meet the proposed £25,000 capital, in

1865. Their first mill, measuring 130by 25 fee~and built

in 1866-7 of basalt masonry by Clement Nash , survives

today although not publicly visible. Architect, J Pitman

and the secretary, William Sayers, called tenders for the

first mill in October 186s4 followed by an apparent

redesign by Geelong architect, John Young, and culminating

in a construction decision in September 1866

when Nash won out of 25 tenderers 5.The machinery

arrived from Britain in 1866,its erection to be supervised

by Mr. C. Horsefield of the Lee~ Horse?eld En~eering

Works6• Horsefeild also supervised the installation at the

Albion Mile.

After arrival of more machinery in 1867 and the addition

of another building, in January 1868, the first cloth was

exhibited and in May 1868,some 7000 yards were sold as

their first marketable produce.1 The opening ball had

been February 1st 1867 and the delayed manufacture

(accident) started some U months later with 23 workers

averaging60 hours each per wee~.

Rate descriptions for the mill start in 1867-8 when it was

a 'brick and stone factory'. By 1869-70, it was the same but

with a 25hp steam engine and boiler, 14 rooms, 16 steam

looms, 6 hand looms, 3 lots of scribbling machines and

stables.3 Architects, Davidson & Henderson had called

tenders at the end of 1870 for a new dye house (50 by 30

feet) as part of the improvements described4 Robertson

& Dickwere the contractors5as theywere for the erection

ofa two-storey masonry building (20by 14 feet) at the mill

in 1872-36

•

A fire in August 18737 preceded a '...general overhauling

of the whole establishment...'. (There was also a fire in

1876)8.

'Within the last 12 months they have erected a splendid new engine of about double the power of the original one...Since Christmas (1873) the factory has been extended to the north by the addition of a building of brick and stone, uniform in size and structure with the new room previously erected, and measuring 144 feet each way. The result is that

the factory is now divided into three large compartments, the engine being near the centre'.

The new rooms allowed redeployment of machinery

which had previously been inefficiently arranged in a

'...strange labyrinth of confusion'. The carding, spinning,

scribbling and weaving machines were now separated,

with the new room being devoted to the weavers and their

77 steam looms. Carding and spinning functioned in the

adjoining former 'big room' which had been the principal

room in the complex and was now intended for 'milling

and raising'. Between the first room built (intended to be

a finishing room) and the newest room (near the engine)

a new drying room was being built mid 1874 to replace

what had been the old 'woolley room' prior to the fire

(presumably of timber) and allowed wool drying regardless

of the weather. The new Woolley Room was built on

the east of the main buildings, constructed from brick,

stone and iron and thought near fireproof. Here the dyed wool was cleaned and purified. A third boiler was being

planned to be followed by another 9..

Davidson & Henderson were the architects 10 for the

additions to a complex which now covered two acres.

They called further tenders in 1877 for a fellmongery and

additions to the 'woolley room' also for a boiler house,

fender and chipping rooms in 1878 11.

By then, employees numbered near 250 hands, many of

whom resided too far for home-cooked meals during

working hours (6am to 9p.m.) and hence a dining room

was to be built later in 1874 with a library attached. After

three years of blanket making, some 1500 pairs were

produced in that year while broad cloths were being

supplied to line railway carriages and tweeds for the

industrial schools and volunteer defence uniforms. Blue

twill for the Queensland police was one of the latest

orders 12•In the same period Geelong Town Council Were

planting willows on both sides of the Barwon River, between

the bridge and the mills 13 following the drainage of

low-lying land in the area in previous years.

Tenders were called in 1882 for the company by architects,

Watts & Jackson, for a building plus 840 yards of flood wall,5 feet high to protect the entire complex and prevent what had

been a vexing problem with the flooding of the Barwon

River, particularly in 1880.14 Godfrey Hirst bought out

both this mill and the adjoining Barwon Woollen Mills by

1899-1900 15, after both had experienced difficulties.16In

this period (189Os), a view of the mills shows a 15 bay brick

building with a central ornamental tower on the south (?)

facing the river. The site was fenced (pickets) and the

fenestration of arched ground-level openings with attic type

windows above 17•

Another not unexpected disaster struck after Hirst's acquisition, when the former Barwon Mill (Excelsior Mill

no. 1) on the east side of Factories Road, was burnt out

in 19U. The 2-storey mill was rebuilt (as one storey) and

extended 2 extra bays probably to the design of Laird &

Barlow.18

Laird & Barlow had been already extending the millat its

northern end, spending £1296 on a contract with W Murphy&

Son in 1905. Two years later, builder W Sadler, was

extending the mill to the south and east.19GF Taylor built an engine room in 1910, using up some 70,000 bricks in

the process, with Laird & Buchan again at the helm.1

& Son

At the end of this period (1912), the Geelong sewerage

and water trust produced detailed plans of the Excelsior

Woollen Mill complex. On the Swanston Street elevation,

starting at Barwon Terrace, there was the verandahed

office (now replaced) and the large brick Weaving Room

which was divided externally by pilasters and blind arcading

along its west wall. The same treatment extended

southwards as the Spinning Room until a group of smaller

purpose-built structures broke the rhythm of the facades.

Here was the Boiler Room and impressive two-level Engine

Room, with a coal bunker nearby clad with galvanized

iron sheet and a weighbridge. As in the 1874

description, this marked the demarcation of the new and

old rooms: the Finishing Room extending in brick to the

south and the first bluestone section laying to the east. A

small Weaving Room occupied the south-west corner of

the site .The Factories Road elevation was far less impressive,

consisting of iron- clad sheds used as drying rooms2

 

Only the 1874 'Woolley Room' was evident as masonry on

the plans, being separated from the old room by a tramline

which ran from drying rooms to the south and then

east of the site along the Barwon River.'

46443 was built at BR’s Crewe works in April 1950 and was based at Derby for 11 years. In 1961, 46443 moved to Saltley, where duties were limited to infrequent rush hour journeys. A final move to Newton Heath (near Manchester) in 1966 was followed by withdrawal in March 1967.

It was then preserved and is resident on the Severn Valley Railway. It is now on display in The Engine House awaiting its next overhaul, following withdrawal from service, whilst in preservation, in October 2011.

In July 1987, 46443 was asked to replace Class 4MT 75069 on the BR Cardigan Bay Express service in North Wales and despite initial misgivings it performed well in that role. This picture records that time.

Date Taken: December 31, 2025

 

Basic Details:

Operator: Millenians Transport Service Cooperative

Fleet Number: 12

Classification: Air-Conditioned City Operation Bus (Modern PUV Class 2)

Seating Configuration: Side Facing Bench-Type Seats

Seating Capacity: 23 Passengers

Standing Capacity: 10 Passengers (LTFRB Maximum Imposed Limit)

Remarks: Compliant to the Philippine National Standard (PNS) 2126:2017 - ICS 42.040.01: Public Utility Vehicles Class 2 & Class 3 - Dimensions

 

Body:

Coachbuilder: Wuxi Huace Automobile Co., Ltd.

Body Model: Forland M5 MPUV Class 2 (Rebadged Huaxin HM6605LFD5X)

 

Chassis:

Chassis Model: Dongfeng EQ6570K5AC

Layout: Front-Longitudinally-Mounted Engine Rear-Wheel Drive

Suspension: Leaf Springs Suspension

 

Engine:

Engine Model: Yunnei D25TCIE3

Cylinder Displacement: 2.5 Liters

Cylinder Configuration: Straight-4

Engine Aspiration: Turbo-Intercooler

Max. Power Output: 143 hp @ 3,200 rpm

Peak Torque Output: 325 N.m @ 1,400 - 2,700 rpm

Emission Standard: Euro 5

 

Transmission:

Type: Manual Transmission

Gears: 5-Speed Forward, 1-Speed Reverse

 

* Some parts of the specifications may be subjected for verification and may be changed without prior notice...

 

View on Sub-Reddit r/bus

 

Our Official Facebook Fan Page: Philippine Bus Enthusiasts Society (PhilBES)

LMR class2 41316 carriage shunting at Brockenhurst. Rescanned on 4-12-09

1 2 ••• 11 12 14 16 17 ••• 79 80