View allAll Photos Tagged base
Eagle Scout James Kelly receives ROTC scholarship during the 2023 National Scout Jamboree at The Summit Bechtel Reserve in Mount Hope, West Virginia. (BSA Photo by Leo He)
**********Beginning of Shooting Data Section**********
20230721-20-04-02--LH date - 7/21/23 time - 20:04:02
This car was unbelievably basic. Very simple badging, no rear wash, basic interior (the dashboard seemed devoid of practically any switches). I think, as dtivney suggested a few weeks ago, the base model was promoted as a low price vehicle to get you in to the dealership, before the punter would yield to a GL or something with at least some features.
Panning back a bit, the storm looked pretty cold and its wall cloud was continually getting undercut by outflow. In spite of that it was still a pretty impressive storm given the day's modest dynamics. The cloud bases were extremely low by Alberta standards, owing to the highly moist air mass (the past few weeks had been quite rainy).
Loosely based upon the hotrod/ratrod featured on the American TV show ' Sin City Motors '...
Link to featured car : www.welderup.com/builds/steal-to-heal/
Basecamp bash during the 2023 National Scout Jamboree at The Summit Bechtel Reserve in Mount Hope, West Virginia. (BSA Photo by Leo He)
**********Beginning of Shooting Data Section**********
20230725-21-27-07--LH date - 7/25/23 time - 21:27:07
Archbishop Christophe Pierre celebrates Catholic Mass during the 2023 National Scout Jamboree at The Summit Bechtel Reserve in Mount Hope, West Virginia. (BSA Photo by Dan Glass)
**********Beginning of Shooting Data Section**********
20230723-10-32-54-81-DG date - 7/23/23 time - 10:32:54 AM
+++ DISCLAIMER +++
Nothing you see here is real, even though the model, the conversion or the presented background story might be based on historical facts. BEWARE!
Some background:
The First Chechen War (also known as the First Chechen Сampaign, First Russian-Chechen war, or, from Russian point of view, as “Armed conflict in the Chechen Republic and on bordering territories of the Russian Federation”), was a rebellion by the Chechen Republic of Ichkeria against the Russian Federation, fought from December 1994 to August 1996. After the initial campaign of 1994–1995, culminating in the devastating Battle of Grozny, Russian federal forces attempted to seize control of the mountainous area of Chechnya but were set back by Chechen guerrilla warfare and raids on the flatlands despite Russia's overwhelming advantages in firepower, manpower, weaponry, artillery, combat vehicles, airstrikes and air support. The resulting widespread demoralization of federal forces and the almost universal opposition of the Russian public to the conflict led Boris Yeltsin's government to declare a ceasefire with the Chechens in 1996 and sign a peace treaty a year later.
The conflict started in 1991, when Chechnya declared, in the wake of the dissolution of the Soviet Union, independence and was named the Chechen Republic of Ichkeria. According to some sources, from 1991 to 1994, tens of thousands of people of non-Chechen ethnicity (mostly Russians, Ukrainians and Armenians) left the republic amidst reports of violence and discrimination against the non-Chechen population. Other sources do not identify displacement as a significant factor in the events of the period, instead focusing on the deteriorating domestic situation within Chechnya, the aggressive politics of the Chechen President, Dzhokhar Dudayev, and the domestic political ambitions of Russian President Boris Yeltsin.
On 11 December 1994, Russian forces launched a three-pronged ground attack towards Grozny. The main attack was temporarily halted by the deputy commander of the Russian Ground Forces, General Eduard Vorobyov, who then resigned in protest, stating that it was "a crime" to "send the army against its own people." Many in the Russian military and government opposed the war as well. Yeltsin's adviser on nationality affairs, Emil Pain, and Russia's Deputy Minister of Defense General Boris Gromov (esteemed commander of the Afghan War), also resigned in protest of the invasion ("It will be a bloodbath, another Afghanistan", Gromov said on television), as did General Boris Poliakov. More than 800 professional soldiers and officers refused to take part in the operation; of these, 83 were convicted by military courts and the rest were discharged. Later General Lev Rokhlin also refused to be decorated as a Hero of the Russian Federation for his part in the war.
The Chechen Air Force (as well as the republic's civilian aircraft fleet) at the time of the 1st Chechen War consisted of a small, mixed fleet of annexed former Soviet air force types that had been based on Chechen ground. The backbone of the “Chechen Republic of Ichkeria Air Force”, how it was officially called, were a handful L-39 Albatros, L-29 Delfin and MiG-21UM jet trainers, augmented by single specimen of full-fledged combat aircraft like the MiG-21 and Su-25. Even a single vintage MiG-17, until then used as an instructional airframe, was revived and became part of the Chechen Air Force!
However, many of these were not fit for sustained operations due to lack of service, spares, weapons and qualified pilots.
The few aircraft that could be brought into the air within the very first hours of the conflict only made minor impression on the Russian forces, rather acting as distractions than being effective combat units. A few air strikes were flown, but no air-to-air combat occurred. Beyond the poor condition, most of the Chechen military aircraft fleet was destroyed or damaged beyond repair in the air strikes that occurred on the first days of the conflict, which included massive attacks against Khankala air base and its infrastructure. Single machines that had been on missions at that time escaped and were able to land on other airfields, but they became unusable within a few days due to the lack of maintenance, fuel and ordnance.
Boris Yeltsin's cabinet's expectations of a quick surgical strike, quickly followed by Chechen capitulation and regime change, were misguided: Russia found itself in a quagmire almost instantly. The morale of the Russian troops, poorly prepared and not understanding why and even where they were being sent, was low from the beginning. Some Russian units resisted the order to advance, and in some cases, the troops sabotaged their own equipment. In Ingushetia, civilian protesters stopped the western column and set 30 military vehicles on fire, while about 70 conscripts deserted their units. Advance of the northern column was halted by the unexpected Chechen resistance at Dolinskoye and the Russian forces suffered their first serious losses. Deeper in Chechnya, a group of 50 Russian paratroopers surrendered to the local Chechen militia after being deployed by helicopters behind enemy lines and then abandoned.
Yeltsin ordered the Russian Army to show restraint, but it was neither prepared nor trained for this. Civilian losses quickly mounted, alienating the Chechen population and raising the hostility that they showed towards the Russian forces, even among those who initially supported the Russians' attempts to unseat Dudayev. Other problems occurred as Yeltsin sent in freshly trained conscripts from neighboring regions rather than regular soldiers. Highly mobile units of Chechen fighters inflicted severe losses on the ill-prepared and demoralized Russian troops. Although the Russian military command ordered to only attack designated targets, due to the lack of training and experience of Russian forces, they attacked random positions instead, turning into carpet bombing and indiscriminate barrages of rocket artillery, and causing enormous casualties among the Chechen and Russian civilian population.
On 29 December, in a rare instance of a Russian outright victory, the Russian airborne forces seized the military airfield next to Grozny and repelled a Chechen armored counterattack in the Battle of Khankala; the next objective was the city itself. With the Russians closing in on the capital, the Chechens began to hastily set up defensive fighting positions and grouped their forces in the city. Russian Army forces were commanded into Grozny in 1994 but, after two years of intense fighting, the Russian troops eventually withdrew from Chechnya under the Khasavyurt Accord. Chechnya preserved its de facto independence until the second war broke out in 1999.
General characteristics:
Crew: 1
Length: 15.76 m (51 ft 7½ in) incl. pitot
Wingspan: 7.15 m (23 ft 6 in)
Height: 4.13 m (13 ft 6½ in)
Wing area: 23.0 m² (247.3 ft²)
Empty weight: 5,843 kg (12,870 lb)
Gross weight: 8,200 kg (18,060 lb)
Max. TOW: 9,400 kg (20,700 lb)
Powerplant:
1× Tumansky R-13-300 turbojet, rated at 40,30 kN (9,040 lbf) dry thrust
and 60,70 kN (13,650 lbf) with afterburner
Performance:
Maximum speed: 2,230 km/h (1,385 mph/1,205 kts) at 11.000 m
1,300 km/h (807 mph/702 kts) at sea level
Cruising speed: 1,200 km/h (745 mph/650 kts)
Landing speed: 350 km/h (217 mph/190 kts)
Range: (internal fuel) 1,210 km (751 miles)
Combat radius with two AAMs and three drop tanks: 465 ml (750 km)
Service ceiling: 19,000 m (62,200 ft)
Rate of climb: 180 m/s (35,375 ft/min)
Thrust-to-weight ratio: 1.03 maximum
Armament:
1x internal 23 mm GSh-23 cannon with 200 rounds
5x hardpoints for a wide range of ordnance of up to 2.870 lb (1.300 kg)
The kit and its assembly:
This rather simple what-if model had been on my idea list for some time, but the “Captured!” Group Build at whatifmodellers.com in late 2020 was a good occasion and motivation to take the idea to the hardware stage. This what-if model was originally inspired by a PrintScale aftermarket decal sheet for the Aero L-39 Albatros trainer. It contained markings for a lot of exotic operators, including Laos and Ghana, as well as markings for an aircraft of the Chechen Republic of Ichkeria Air Force from the early stages of the 1st Chechen War, actually a captured aircraft of the Russian Air Force. While the paint scheme was simple - a standard trainer livery, just with overpainted roundels and tactical markings - I found the historic context interesting. I did some legwork and tried to puzzle together the background of these markings, as well as the origins of the Chechen air force, in order to transfer it onto a different aircraft type.
In fact, much of the background given above is authentic (As far as I can tell, during such conflicts, there is always more than a single truth…), the Chechen makeshift air force was pretty small, consisting primarily of trainers, some helicopters and obsolete types (apparently, the single resurrected MiG-17 from storage was “real”!). AFAIK, no MiG-21 single seater was operated in Chechen colors, even though (at least) one MiG-21UM trainer carried Ichkerian roundels. However, all aircraft were destroyed on the ground within the first hours of the conflict, so that the air force did not play any role in the ongoing battles.
The basis of this build is the relatively new KP kit for the MiG-21MF/MA/R, which is apparently a low-budget re-boxing of the RV Aircraft kit without PE parts. Having some surplus MiG-21 kits at hand from a KP “Joy Pack” (with three complete MF/MA/R version kits, w/o decals), I decided to use one of them for a fictional Chechen Fishbed, an MF. This is/was actually an export version of the Fishbed (the MiG-21 SM, to be specific), but this variant was operated by the Soviet/Russian Air Force, too, alongside the more capable MiG-21bis, even though not in large scale. A Su-25 would have been another worthwhile choice, but I found the L-39 markings to be too small for this type, so the slender Fishbed was chosen, being a very common and therefore plausible type.
I had a trio “joy pack” sans decals stashed away some time ago and now is the occasion to build the first of these kits, and I built an MF from it, mostly OOB. So far, I am very impressed by the kit's details. The cockpit has a full tub, with side walls and consoles up to the canopy, rich detail everywhere (there is probably ANY rivet represented on the surface, finely recessed) and there are things like a free-standing shock cone, options for all air brakes to be built in opened position and even an opening for the air outlet in front of the windscreen. However, fit is not stellar, and any surface detail is a separate part. For instance, the small wing fences have to be glued into place - not that problem if they would fit... The fences are rectangular parts, and the wing surfaces are curved - that does not work. There are no locator pins for the wings, they have to be glued directly onto the fuselage flanks – a rather anachronistic approach. And the worst bummer is that the main landing gear wells are somehow located too far ahead - I am not certain how this blatant flaw on such a good model could find its way into the mold? Nevertheless, I am impressed by the many details and options of this kit, but feelings are ambiguous.
The kit was built OOB. I just gave it two pairs of bombs (a pair of FAB-250 bombs and two OFAB-100 fragmentation bombs) as ordnance from the scrap box (from a Kangnam Yak-38 and a KP Su-25). The Fishbeds from the Joy Pack come with drop tanks, some Atoll and Aphid AAMs and a pair of heavy unguided S-24 missiles, but I found none of these really suitable for a Chechen aircraft.
Painting and markings:
I used the L-39 from the PrintScale decal sheet as conceptual benchmark: a former Russian aircraft, captured and pressed into Chechen service on short notice. As such, the Fishbed received a typical Soviet/Russian disruptive four-tone, tactical “steppe” camouflage. A real-world MiG-21 was the benchmark for the pattern, I just replaced the colors. They became pale sand, medium brown, grass green and dark green, with blue undersides (Humbrol 121, 237, 150 and 75, respectively with 115 underneath).
The cockpit interior was painted in characteristic bright turquoise and medium grey, the landing gear became matt aluminum, with bright green wheel discs. The wells were painted with a mix of Humbrol 56 and 81, for a yellowish metallic grey. Humbrol 105 was used for the Fishbed’s typical di-electric fairings on nose, tail and ventral fin.
The kit received a light black ink wash and some post panel shading for a used/worn look, since the MiG-21 would in 1994 have already been a secondary line aircraft with many flying hours on the clock. The areas, where Red Stars and the tactical code had formerly been placed, were overpainted with fresh dark green (Humbrol 195) and light blue under the outer wings (Humbrol 89). The new operator’s markings were added on top of that: early Chechen roundels with a red star as background (which was later changed into green, probably in order to make the aircraft easier and clearer to distinguish, even though I have doubts about contrast on a camouflage background?) from the aforementioned PrintScale L-39 sheet. The large tactical code numbers come from a MiG-17 (Microscale sheet).
The slogan “Ӏожалла я маршо“ (Joƶalla ya marşo, “Death or Freedom”, after the Anthem of the Chechen Republic of Ichkeria’s title which was written in 1992 and lasted until 2004) was painted manually with acrylic white and a fine brush. The handwritten style pragmatically suits the aircraft and its situation well. Cheesy and patriotic, but IMHO appropriate and just the detail that sets this Fishbed apart from a simple roundel rebadge.
Some areas were furthermore lightly wet-sanded, for an intentional makeshift and worn look. Finally, the model was sealed with matt acrylic varnish (Italeri) and I did some dry-brushing with aluminum on the leading edges and around the cockpit.
A relatively simple whif project, but I like the exotic touch of the Chechen markings – this fictional Fishbed looks pretty believable. I also like the “colorful” livery, despite being a camouflage scheme. However, I am not 100% sold on the relatively new KP/RV Aircraft kit. It looked so good in the box, and it is full of many minute details. But building it revealed some weaknesses and even lethal flaws, like the mispositioned/crippled main landing gear wells in the wings. There’s something fundamentally wrong. WTF?
17/365 (4,367)
I'm getting there. Ceiling and coving done. Two coats of white to cover the red walls, and now ready for a new colour.
On this day, my dishwasher broke, so I had to go buy a new one. Plus also I also bought new basic microwave to replace the one the broke over Christmas. So what with a new washing machine before Christmas, that's the 3 things, so I should be good for awhile :))
Minolta XE-7, Ilford FP5
Image ©Philip Krayna, BoxxCarr, all rights reserved. This image is not in the public domain. Please contact me for permission to download, license, reproduce, or otherwise use this image, or to just say "hello". I value your input and comments. See more at www.boxxcarr.com.
A busy scene within the Kronstadt military seaport on Kotlin Island near Saint Petersburg sees Russian tanker Aral in the foreground, with RFS KARPATY Rescue-raising Vessel (Project 530) and RFS RASTOROPNYY Sovremennyy Class Destroyer Pennant No. 420 (Project 956) moored together behind it, along with the Non-self-propelled SFDR (Arcticheskaya) ARCTIC (Project 15402M) moored behind them all.
This is a Clone base I half built a year ago, and recently finished. I am going to Marine Recruit Training today, so this will be my last post till November
East Kent's route 94 connected Sandwich with Folkestone via Dover on an hourly basic daytime frequency. Dover based ECW bodied VR 7663 (XJJ 663V) was standing in Pencester Road, Dover on August 26th 1993 prior to operating a short working between Dover and Folkestone.
Luton based Volvo B7RLE Wright Eclispe 2 3962-LT63UNF seen on its first day back out on the road after its repaint into a special livery supporting Luton town FC & Keech hospice care named in memory of Rob Figgins, Luton Town fan who was cared for by Keech Hospice before his death in 2017.
Well done to all those at Arriva Luton depot & the paintshop who help to make Luton driver Rob Attfield's idea a reality.
Base Toys / BT Models were born out of Britbus and ceased trading in 2017, though the toolings still exist, only privately commissioned models are currently being produced.
A number of HGV / Light commercial vehicles were produced under the BT Models name and utilised a generic chassis that was used across the range.
The Ford D Series was produced and although over width and looking a bit odd with the generic chassis could pass muster on dioramas and model railway layouts if carefully placed.
September 2015 saw it released in articulated boxvan guise in Green Shield Stamps livery.
+++ DISCLAIMER +++
Nothing you see here is real, even though the conversion or the presented background story might be based on historical facts. BEWARE!
Some background:
Following good performance from the pioneering diesel-hydraulic locomotive the DB Class V 80, the Deutsche Bundesbahn planned in 1953 to build several types of new diesel locomotive, primarily to replace steam powered locomotives.These were: V 60, and V 65, both shunters, the V 65.2, also for shunting as well as light freight trains, the heavy DB Class V 200, for express passenger trains, and the universal V 160 for both freight and passenger work on the main network.
The new V 160 class was a central piece in this line-up, because it would replace important steam-powered engines such as the BR 03, BR 23, BR 38.10 (former Prussian P 8 class), BR 39 (ex P 10), BR 50, BR 57 (ex G 10) and BR 78 (ex T 18). Steam heating for passenger coaches was necessary, and a top speed of 120 km/h was specified. Initially, a 1,600 hp powerplant, consisting of two engines of the same type as in the light V 80 was planned, the first newly developed diesel locomotive built for main line service by the Deutsche Bundesbahn (but only built in 10 examples). This dual engine arrangement had already been successfully introduced in the heavy V 200, which was initially powered by two 1,000 hp diesel engines. However, it was soon realized, that, if a single, high-powered engine could be used, weight, complexity and therefore maintenance and other costs would be considerably reduced. The V 160’s design was modified accordingly and a single MTU V16 four-stroke diesel engine was chosen. Both two-axle bogies were powered via drive shafts from a two speed hydraulic drive from Voith, which offered a compromise between the requested high speed for light passenger trains and the alternative reduced second gear with lower top speed, but much higher torque, for freight train service. Gears could only be switched when the locomotive was standing still, though.
In the spring of 1956, V 160 development began at Krupp. Welded steel components along with other lightweight materials were used to keep the axle load well below 20t, so that the V 160 could be safely operated on secondary lines. However, in the main production series of locomotives, some of the lighter weight welded construction was abandoned in favor of less expensively produced components - leading to an increase in axle weight from ~18.5 to ~20t, which was still acceptable but lowered overall production costs. This was furthermore not regarded as a major problem since the DB perspectively started to abandon branch lines, switching to more economical diesel multiple units or giving them up altogether towards the Seventies.
The first V 160 unit was delivered on 6 August 1960, with eight more following by 1962 from both Krupp and Henschel. These prototype units, due to their rounded, “busty” front end, were later to become unusual amongst the entire V 160 family and earned them the nickname “Lollo” (in allusion to Gina Lollobrigida). A final prototype V 160 010, the tenth, was manufactured by Henschel in 1963 and the first to feature the serial locomotives’ angled front end, which was inspired by the design of the super-heavy V 320 Henschel prototype.
Despite the single main engine, the V 160 was still a complex locomotive. In addition to the main engine, the V 160 featured a small, independent auxiliary diesel engine, driving a generator providing the 110 V electrical supply for lighting as well as driving an electric air compressor for the brakes. The steam heating apparatus, sourced from Hagenuk and powered by fuel oil, took up one end of the locomotive, between the engine and drivers cabin. It had the capacity to satisfactorily heat 10 coaches when the outside temperature was -10°C. For passenger train service, most V 160 locomotives were also equipped for push-pull operation, as well as for multiple working, controlled via a 36 pin control cable and respective sockets on the locomotives front ends.
The prototypes performed well, and volume production began, numbers V 160 011 to V 160 224 being built between 1964 and 1968 by Krupp, Henschel, KHD, Krauss-Maffei and MaK. The first V 160/216 locomotives entered service on the Hamburg to Lübeck line, working push-pull double decked passenger trains, replacing the BR 38.10 and BR 78 steam engines. The engines were also used on freight workings as well. On push-pull passenger working, the locomotives were sometimes found in the middle of the train - which facilitated easier separation of carriages en route.
By the time the 156th example was under completion, the Deutsche Bundesbahn changed its numbering system. From then on, the V 160 class were re-designated as Class (Baureihe = BR) 216, with the individual unit numbering continuing as before. Over the next decade, because of changing requirements – mostly in terms of increased power, speed as well as the requirement for electrical passenger heating – a number of related classes sprang up, the BR 210, 215, 217, 218 and 219. Although some were a little longer and carried additional components (e.g. an auxiliary jet engine), all of them were essentially based on the original V 160 and more than 800 machines of all types were eventually built.
Since the 1990s, the Bundesbahn’s BR 216 locomotives scope of work started to shift more on freight than on passenger trains because of the lack of steam-heated passenger stock. From 2000 onwards, the Deutsche Bahn AG’s BR 216 fleet was phased out, with the last locomotive being decommissioned in 2004.
Several locomotives were sold to private operators like rail construction companies and remained in frequent use, and some retired BR 216s were re-built and offered for sale, too. The first in the series of rebuilt Class 216s was called type “DH 1504” and created in 1998 by the firm 'On Rail'. Despite only little external changes, the result was an almost completely new locomotive, only the transmission, bogies and frame were saved from the original locomotive. The original V16 diesel engine with 1,370 kW (1.900 hp), was replaced with a lighter but more powerful 1500 kW (2,085 hp) V12 four-stroke diesel engine, also from MTU. On customer demand, a new electric Webasto heating system could be installed instead of the original steam heating system, making the DH 1504 capable of operating modern passenger trains, and for this purpose the units were also fitted for multiple working as well as for remote control operation (e.g. for shunting). Another option was additional ballast, so that the axle load could be kept at 20 tons for better traction. Otherwise, 18 t axle load was standard for the revamped DH 1504.
Since 1998, 6 of these locomotives were re-built for private operators in Germany. By late 2019, three DH 1504 locomotives were in the use of the Osthannoversche Eisenbahnen (OHE), two work for the Niederrheinische Verkehrsbetriebe (NIAG) and one for the Mindener Kreisbahnen (MKB). However, the biggest sales success for OnRail’s modernized BR 216 was the export to Poland, where the PKP (Polskie Koleje Państwowe, Polish State Railways). After its privatization in 2001, the PKP was looking for a low-cost replacement for its last ST-43 Class diesel electric freight locomotives of Romanian origin, which dated back to the 1960ies. Twenty DH 1504 locomotives for mixed duties were built by OnRail between 2001 and 2005 and entered PKP service as Class SU-29 (spalinowa uniwersalna = mixed-traffic diesel locomotive with hydraulic transmission and multiple-unit control). Their initial primary field of duty was the cross-border freight traffic on the east-west relation on the PKP “Polskie line Kolejowe”, the so-called “Niederschlesische Gütermagistrale”. Since 2005, this route had been expanded, electrified and became double-railed, so that the SU-29s gradually took over more and more passenger train duties on non-electrified major lines. The SU-29 machines are expected to remain in PKP service beyond 2030.
General characteristics:
Gauge: 1,435 mm (4 ft 8½ in) standard gauge
UIC axle arrangement: B´B´
Overall length: 16,800 mm (52 ft 57⁄8 in)
Pivot distance: 8,600 mm
Bogie distance: 2,800 mm
Wheel diameter (when new): 1000 mm
Fuel supply: 3,800 l
Service weight: 80 t
Engine:
MTU 4000R20 V12diesel engine with 1500 kW (2,085 hp) at 1,800 RPM
Gearbox:
Voith L821rs 2-speed gearbox
Performance:
Maximum speed: 120 km/h (75 mph) or 80 km/h (50 mph)
Torque: 235,2 kN
The kit and its assembly:
Well, this is a rather unusual what-if “build”, since this not a model kit as such but rather the conversion of a readymade H0 gauge model railway locomotive for the “Back into service” group build at whatifmodelers.com in late 2019.
The inspiration was not original, though: some time ago I stumbled across a gift set from the former East-German manufacturer Piko, apparently for the Polish market. It contained a set of double deck passenger wagons, and a (highly simplified, toy-like) German BR 216 in PKP markings. It was called SU-29 and carried a very crude and garish green livery with yellow front ends – inspired by real world PKP diesel locomotives, but… wrong. I found this so bizarre that it stuck in my mind. When I dug a little further, my surprise even grew when I found out that there were other national adaptations of this simple Piko BR 216 (e .g. for Denmark) and that Piko’s competitor Roco offered a similar BR 215 in PKP colors, too! This time, the fictional locomotive was designated SU-47 (which cannot be since this would indicate a locomotive with electric power transmission – poor job!), and it also wore a bright green livery with yellow front markings. Bizarre… And the PKP does NOT operate any BR 216 at all?!
However, with the GB topic in mind, I decided to create my own interpretation of this interesting topic – apparently, there’s a market for whiffy model locomotives? The basis became a 2nd hand Märklin 3075 (a BR 216 in the original red DB livery), not a big investment since this is a very common item.
In order to easy painting, the locomotive was disassembled into its major sections and the body stripped of any paint in a one-week bath in oven cleaner foam, a very mild and effective method.
The heavy metal chassis was not modified, it just received a visual update (see below).
The upper body underwent some cosmetic surgery, though, but nothing dramatic or structural, since the DH 1504 described above only differs in minor external details from the original BR 216. I decided to modify the front ends, especially the lights: Locomotives in PKP service tend to have VERY large lamps, and I tried to incorporate this characteristic feature through masks that were added over the original light conductors, scratched from styrene tube material.
In the course of this facial surgery, the molded handles at the lower front corners were lost. They were later replaced with three-dimensional silver wire, mounted into small holes that were drilled into the hull at the appropriate positions. Fiddly stuff, but I think the effort was worth it.
The original vent grills between the lower lamps were sanded away and covers for the multiple working cable adapters on the front ends added – scratched with small styrene profile bits.
For a cleaner, modern look, I removed the original decorative aluminum profile frame around the upper row of cooling louvers. The roof was modified, too: beyond the bigger headlight fairing, the exhaust for the auxiliary diesel engine was removed, as well as the chimney for the old steam heating system. The diesel engine’s exhaust pipes were lengthened (inspired by similar devices carried by DB BR 218), so that the fumes would be deviated away from the locomotive’s hull and the following wagons. Horns and a blade antenna for each driver’s cabin were added, too.
Painting and markings:
Both Piko and Roco V 160s in PKP markings look garish – righteously, though, since PKP locomotives used to carry for many years very striking colors, primarily a dark green body with a light green/teal contrast area on the flanks and yellow quick recognition front markings. However, I did not find any of the two model designs convincing, since they rather looked like a simple toy (Piko) or just wrong (Roco, with a surreal grass green contrast tone instead of the pale teal).
I rather went for something inspired by real world locomotives, like the PKP’s SU- and SP-45s. The basic design is an upper body with a dark green base (Humbrol 76, Uniform Green) and a pale green-grey area around the upper row of louvres (an individual mix of Humbrol 96 and 78). The kink under the front windows was used for waterline reference, the front section under the windows (in the dark green base) was painted in bright yellow (Humbrol 69) as a high-viz contrast, a typical feature of PKP locomotives. The chassis received a grey-green frame (somewhat visually stretching the locomotive) with bright red (Humbrol 19) headstocks, a nice color contrast to the green body and the yellow bib.
Silver 1.5mm decal stripes (TL Modellbau) were used to create a thin cheatline along and around the whole lower section. At some time I considered another cheatline between the light and dark green, but eventually ignored this idea because it would have looked too retro. The locomotive’s roof became medium grey (Revell 47).
The running gear and the tanks between the bogies were painted in very dark grey (Humbrol 67, similar to the original DB livery in RAL 7021) and weathered with a light black ink wash, some thinned Burnt Umbra (simulating dust and rust) plus some light dry-brushing with dark grey that emphasized the surface details. This used look was also taken to the upper body of the locomotive with watercolours (Grey, Black and some Sienna and Burnt Umbra) for a more natural look of daily service – rather subtle, and I emphasized the louvres, esp. on the light background, where they tended to disappear.
Individual markings consist of single decal letters in silver and white in various sizes (also TL Modellbau) for the locomotive’s registration code as well as of H0 scale catenary warnings from Nothaft Hobbybedarf, plus some generic stencils from various model decal sheets (incl. Cyrillic stencils from an 1:72 MiG-21 decal sheet…).
For a uniform finish I gave the locomotive an overall coat of matt acrylic varnish from the rattle can – it still has a slightly sheen finish and matches well the look of Märklin’s standard rolling stock.
A different kind of what-if project, but this has not been my first H0 scale locomotive conversion. The fictional PKP SU-29 looks a bit weird, with the garish paint scheme and the oversized headlights, but this strangeness makes this model IMHO quite convincing. The model is fully functional, even the light works well in the enlarged headlight fairings. Maybe I’ll sell it, since I do not have the appropriate model railway set at hand to effectively use it (which is also the reason for the rather limited scope of pictures of the finished item). And I am curious what people might be willing to pay for such a unique, fictional item?
Known for their bathroom humor, Tucks is a fun/funny parade.
Krewe of Tucks parade
Mardi Gras 2017
New Orleans LA
The Power Miner's mini base opening up ready for play. It can be transported on a trailer attached to the Thunder Driller and dropped off when the Power miner's need a forward operating base in a hurry. Built in 2011 when we didn't have very many tiles!
Based on the penultimate Spiffcraft by Dan Jassim, whose Brickshelf gallery I idolized as a kid: www.flickr.com/photos/28825145@N04/8198520893/in/album-72...
Previous version on Brickshelf found here: www.brickshelf.com/cgi-bin/gallery.cgi?i=1850625
The Power Miner's mini base in opened out ready to play mode. It can be transported on a trailer attached to the Thunder Driller and dropped off when the Power miner's need a forward operating base in a hurry. Built in 2011 when we didn't have very many tiles!
JOINT BASE ELMENDORF-RICHARDSON, Alaska (July 10, 2020) - U.S. Army paratroopers from the 4th Infantry Brigade Combat Team (Airborne), 25th Infantry Division, U.S. Army Alaska, jump from an Air Force C-17 Globemaster III over Joint Base Elmendorf Richardson, Alaska, July 10, 2020, as part of JBER Salutes, a two-day event to show appreciation to service members and nearly 100 Anchorage-area “COVID Heroes†and their guests. The service members and COVID Heroes, nominated for their support to the community during the COVID-19 pandemic, toured various areas of the installation, viewed exhibits and static displays of aircraft, and watched demonstrations by Explosive Ordnance Disposal, military working dog teams, and Chemical, Biological, Radiological and Nuclear experts. (U.S. Air Force photo by Angela Earle) 00710-F-RN387-0014
** Interested in following U.S. Indo-Pacific Command? Engage and connect with us at www.facebook.com/indopacom | twitter.com/INDOPACOM |
www.instagram.com/indopacom | www.flickr.com/photos/us-pacific-command; | www.youtube.com/user/USPacificCommand | www.pacom.mil/ **