View allAll Photos Tagged progress
August 7th and the stone wall has been completed apart from some maintenance pointing. The wood pile has been relocated along with all the pieces of sand stone left over. The garden area has now all been sown with grass seed with good growth on that which was sown 2 weeks ago. The old iron railings that Dave has carefully extended are fitted & have been painted. The very heavy 550kg concrete ring & cap have been installed over the rain water tank.
Progress as of 3/2/08. I wasn't paying attention to previous squares, and duplicated color patterns already. Grrr. Will redo top one.
Not much going on this morning, but clearly, the chicks are growing. I'm sure Dad came back with a fish 3 minutes after I left to go to work. Nothing more than this pic occurred within the >1 hour I sat there lookin'. In fact, the goslings that swam by (see other pic) were much more interesting today..
View BIG for a better look at the chick.