View allAll Photos Tagged phasor

Tutu's, King's College London 2003

Model: Heather Goodman

Camera: Canon AE-1 Program

Film: Ilford 400 ISO b/w

Process: Ilford 11x14 Matt paper

We're in the process of expanding our front garden by more than 500 square feet.

 

We started last fall by removing three huge holly bushes from in front of the porch and building a vegetable bed in their place. That was Phase One.

 

Phase Two includes removing the sod from the lawn to make another vegetable bed and landscaping the areas around it.

 

May 7, 2015

Journey into the REM Phase.

 

What we see when we dream.

Bien le bonjour du sous-commandant Pierrot

September 03, 2013:

 

Mississauga,

Residential Development,

"Mirage Condos Phased II (335 Rathburn Rd W, Conservatory Group, 22s, Richmond Architects)"

 

An actual print from the phase one shoot, 120 film?

 

The corners are white cause of the lens not being right in the enlarger.

 

Really rough prints

Because I'll give up my Type II when they peel it from my cold dead hands.

With the addition of the engine and transmission, phase one of the project is now complete. The next step is to get the chassis outside and bring the body in for metal and body work, then paint, before mating the body and chassis back together

Phase one verifying of compliance by video as compared to student examples just shown.

At the end of the autumn term, parents and carers of phase two children were invited to see work produced for the Winter exhibition. Year three presented their responses to the climate crisis; year four produced a museum exhibition showcasing their investigations into ancient Egypt; year five showed off vehicles produced as part of their 'How high, how far, how fast?’ project; year six took up residency in The Clipper on Union Street to respond to the question: ‘What does community mean to us?’ This fantastic event was really well attended and the children really enjoyed showing off the results of their learning through the term. A big thank you to all involved!

The four new remote-controlled, ship-to-shore (STS) cranes are among the largest in the world, with an 82-metre outreach. These dual STS cranes can handle cargo vessels of 26 containers in width (or up to 24 000 TEU container capacity). “This will significantly increase the capacity and turnaround efficiency of terminal operations, enabling better service to customers and improving overall customer experience through more efficient operations,” explains Keld Pedersen, Head of APM Terminals West Med Terminals.

 

When things come full circle, I’ve learned they have lasting inspirations. In the 80s, my host sister studied abroad in Ohio, where she learned Phase 10. She brought back a deck to her small rural Costa Rican hometown and Phase 10 quickly became an enjoyable pastime. My host dad and I played Phase 10 several nights a week. For over 30 years my host family used the same Phase 10 deck. One of the most memorable games was when my parents came to visit, brought my host family a new deck, and my two dads played together.

 

Photographer: Lauren Birks

Location: Copal, Costa Rica

 

Phase Fest 2007 on Aug 17th.

 

Tara Gordon working that damn guitar. I love this shot it makes me happy on the inside!

 

www.myspace.com/pariahpiranha

phase-4_01: The building extension reached Substantial Completion in late July of 2009.

work in progress...

1 2 ••• 54 55 57 59 60 ••• 79 80