View allAll Photos Tagged phasor
phase-1¬_22: Snow on the ground did not stop these workers preparing the structure for the data center.
D worked his ass off here. I helped, but he is the landscaping ninja. Pretty new baby aspen (six total), staked and with retaining walls. Pruned extant trees. Will likely put in nice rocks for ground cover and some sort of flowering bushy things here and there so it's not so stark. Will be fixing the fence and putting in 2x4s or some such at the bottom to keep the neighbor's runoff from screwing with stuff (stupid rocks and excess dirt, bah).
Bonus: In not too long, the babies will be as big as the other aspen, and we will have successfully blocked the view of the ginormous yellow house behind us. Yay!
Opposing phases of the Moon during the same Lunar day. Left image is July 13, 2012 and right image is August 4, 2011.
These two mosaics consist of approximately 30 panels and over 10,000 stacked frames, captured 1024 X 768 @ 15fps. (480X magnification)
taken 10/08/2014, 04:08; 1st vantage point: behind work at Security Benefit in West Topeka; at the end of the penumbral phase, 10 mins before partial eclipse begins; approx an hour and 45 mins before total eclipse maximum.
December 03, 2013:
2013440297a
Mississauga,
Residential Development,
"Mirage Condos Phased II (335 Rathburn Rd W, Conservatory Group, 22s, Richmond Architects)"
@ an after-school math program, incorporating art to highlight understanding of math concepts. The event presented by Mr. Eddie Walker at Powderly Library