15-9-2017 verhalen HERMOD door de SMIT CHEETAH , SMIT EBRO , ROTTERDAM en ADVENTURE naar de DOCKWISE VANGUARD op de Maasvlakte 2 . Na het weekend vertrekt het transport naar Zhoushan in China
Daar wordt de bijna 40-jarige 'Hermod' ontmanteld en gerecycled
op de werf van Zhoushan Changhong International Ship Recycling
ALe completed the launch of the Estrecho de Paredes viaduct, which bypasses the Estrecho de Paresdes gorge and is part of a new highway in the province of Cuenca, Spain.
LONE geladen met Damen Sleepboten , 2 x ASD TUG 3212 , 4 x ASD TUG 280 , 3 x ASD TUG 2411 , 2 x STAN TUG 2608 en 1 x MULTICAT 1908 , transport kwam uit Vietnam.
Detroit, Michigan, USA
Heavy Lift
flag: Netherlands
owner: BigLift Shipping B.V.,
Amsterdam, Netherlands
length: 138m / 453ft
built: 1998
© M J Anahory. These images are protected by copyright. You cannot copy or republish this photo without written consent of the copyright holder. Any copyright infringements will be followed up with action legal or otherwise.
Generator moves into position,the rigger in the centre is guiding the crane operator,50 bolts hold the generator in place.Raining when this was happening.
A TIANDI SPT(base on TJV4 model) was put on operation in South Africa.
1 Kerb weight(Kg) 56000
2 Rated speed (Ground, full load)(Km/h) 5 (PPU drive)
3 Max. speed(empty load)(Km/h) 10 (PPU drive)
4 Max. Pulling force(N) 480000
5 Platform measrurement(L×W×H)(mm) 21680×2990×1070±300
6 Outer measurement(L×W×H)(mm) 26575×2990×1070±300
7 Wheelbase(mm) 1550
8 Tread(mm) 1820/735
9 Approaching Angle/Departure Angle 6°/6°
10 First wheel Max. steering angle 50°
11 Drive axle 6
12 Axle lines 20
13 Tyre spec 215/75R17.5 or 7.50R15
14 Rim spec. 17.5×6.00
15 tyre number 112
16 Syspension type Hydraulic
17 Engine power/speed 375Kw/2000rpm
18 Engine model D2876LUE604
For more details feel free to contact me!
Sales Contact:
Jeff Lee
+86 186 0768 9697
Twitter: jeffgbc
Email: tiandihi@gmail.com
Video Demo: www.metacafe.com/channels/Heavylt/ (Metacafe)
www.youtube.com/user/fulangjie (Youtube)
ALE supplied and operated an external ballasting system for the load-out of the 21,800te LUN-A topside, as well as performing the load-out engineering and barge management.
The vessel is seen here sailing down the river Scheldt carrying two second hand container gantry cranes it loaded at the port of Antwerp. The cranes are destined for the Spanish port of Alicante where the vessel arrived on december 14th 2022
unedited video
Frame rate : 25 fps
shutter speed : 50
Frame size : 3840 x 2160 (4K)
The vessel is seen here sailing down the river Scheldt carrying two second hand container gantry cranes it loaded at the port of Antwerp. The cranes are destined for the Spanish port of Alicante where the vessel arrived on december 14th 2022
unedited video
Frame rate : 25 fps
shutter speed : 50
Frame size : 3840 x 2160 (4K)
ALE Heavylift performed a movement of an electrical transformer weighing in at around 230 tonnes from Stella (Blaydon) to Wallsend overnight from 15th August to 16th August. On arrival at Swan Hunters in Wallsend it's to be shipped by barge to Ellesmere Port where it will be put back on the road to be taken to its destination of Oldbury. Seen at the North End of the Tyne Tunnel at East Howdon, the convoy is seen waiting to continue along Hadrian Road to Wallsend. The move was powered by a pair of ALE Trojan 8870 trucks with BX64KSE at the front with BX65OAW powering from the rear.
Finnish heavy lift ship carrying 5 windmill platforms, Kiel Canal Schwartenbek 2011/04/11
Gaiamare/Meriaura Oy, Turku, Finland
*2008 Gdansk Shiprepair Yard Remontowa S.A.
GT: 3,238 NT: 972 TDW: 5,272mt
L: 101.80m B: 18.80m D: 4.92m
Steel structure/project cargoes : up to 3600mt
Container capacity : 240teu @ 13,5mt
2 x Wärtsilä Diesel 6R32 with PTO, box cooled
max. Output 100% MCR 2 x 2220 kW @ nominal rpm 750 11-12kts
Nieuwe Waterweg 27-8-2017 , onderweg naar Rotterdam om deel te nemen aan de Rotterdamse havendagen a:s weekend.
ALE Trojan 8870 truck registration BX65OAW seen at Stella South Substation after a cancelled transformer move from Stella to Wallsend on Friday 11th August. Move was resceduled to take place overnight from 15th to 16th August.