View allAll Photos Tagged heavylifting
28-3-2018 laadoperatie van het Damen droogdok C op de XIN GUANG HUA , bestemming Damenshipyard in Curacao.
ALE was engaged to move and load-out modules as part of the Process Platform Project. ALE was able to provide full engineering support on transport, mooring design checks and barge ballasting and analysis.
ALE Transported three vessels from Kleve in Germany to the Rhine near Emmerich, covering a distance of 10km. Before the vessels were loaded, they were first jacked up to the required height using 12 climbing jacks.
Detroit, Michigan, USA
Heavy Lift
flag: Netherlands
owner: BigLift Shipping B.V.,
Amsterdam, Netherlands
length: 138m / 453ft
built: 1998
ALE successfully transported a 395te generator from port to the new-build Electrabel power plant in Wilhelmshaven, Germany.
ALE won the contract for the transport, shifting and load-out of more than 90 modules, pipe racks and vessels of various sizes and weights, including the jacking and weighing of the heaviest piece.
The USAF's newest heavylift cargo plane the C-17 Globemaster III makes a nice backdrop to the V-22 Osprey.
---------------------------------------
Please visit my Aircraft Set
---------------------------------------
ALE has completed the offloading, site transportation and installation of modules and equipment for the EGP3 project as Escravos in the Niger Delta.
ALE Completed the transportation and lifting of 25 heavy lifts a part of the Thai Growth Project in Map Ta Phut, Thailand. With weights ranging from 73te to 813te, all items were transported, lifted and installed in just 22 days.
A 180 ton automotive metal press being loaded on board of the Rickmers Singapore.
This unit is part of a number of presses that originate from the Ford plant at Genk (Belgium) which was closed at the end of 2014. The presses will be discharged at the Chinese port of Ningbo.
ALE was contracted to carry out the land and marine transportation of two Liebherr Container Cranes from Port Khalid, Sharjah to Khorfakkan port.
ALE carried out the weighing, transportation and load-out of a process module from the Qtech fabrication yard at Sattahip port in Thailand. www.ale-heavylift.com
Calandkanaal 10-2-2016 . BALDER bezig met installeren van de
toren die op het ponton CC ATLANTIQUE aangevoerd was.
Detroit, Michigan, USA
Heavy Lift
flag: Netherlands
owner: BigLift Shipping B.V.,
Amsterdam, Netherlands
length: 138m / 453ft
built: 1998
Detroit, Michigan, USA
heavy lift
flag: Antigua-Barbuda
owner: Krey Schiffahrts,
Leer, Germany
Chartered by: BBC Chartering & Logistic GmbH, Leer, Germany
length: 144.9m / 475ft
built: 2011
ex names:
Stinnes Passat 2018 - 2019
Clipper Newhaven 2011 - 2018
GPO GRACE met aan dek de GMS ENDURANCE 6101 & GMS EVOLUTION 6104 vertrok uit Europoort naar Abu Dhabi 13-1-2020
GCS Johnson Ltd of Richmond, North Yorks were also involved with the move using their Mercedes Benz Arcos, although it had the smaller load, it was still without doubt an important part of the wind turbine. It is seen here on Fisher Street in Low Walker following the two ALE Heavylift loads into Neptune Energy Park.
ALE was contracted to complete the transportation of two demethaniser vessels as part of the Integrated Gas Development project in Abu Dhabi.
ALE were contracted to develop a concept to install four offshore integrated platforms due to shallow water preventing installation by either a heavy lift vessel or a conventional floatover installation on a raised transportation frame.
ALE has successfully performed a number of transportation, lifting and pulling operations at the Dragados Offshore yard in Tampico, Mexico in three separate projects.
Detroit, Michigan, USA
heavy lift
flag: Liberia [LR]
owner: COE Shipping GmbH & Co.,
Buxtehude, Germany
Chartered by:
Spliethoff's Bevrachtingskantoor BV,
Amsterdam, Netherlands
length: 138.51m / 454ft
built: 2010
ex names:
Marselisborg 2014 - 2016
Clipper Anne 2012 - 2014
Marselisborg 2010 - 2012
ALE Heavylift performed a movement of an electrical transformer weighing in at around 230 tonnes from Stella (Blaydon) to Wallsend overnight from 15th August to 16th August. On arrival at Swan Hunters in Wallsend it's to be shipped by barge to Ellesmere Port where it will be put back on the road to be taken to its destination of Oldbury. Seen at the North End of the Tyne Tunnel at East Howdon, the convoy is seen waiting to continue along Hadrian Road to Wallsend. The move was powered by a pair of ALE Trojan 8870 trucks with BX64KSE at the front with BX65OAW powering from the rear.
ALE has successfully performed a number of transportation, lifting and pulling operations at the Dragados Offshore yard in Tampico, Mexico in three separate projects.
ALE managed several operations for the FCC refinery of Punta Cardon including the transportation of a new reactor; the site movement of a new domo; and the removal of the existing stripper, absorber, reactor, regenerator, fractionator and domo.
Detroit, Michigan, USA
heavy lift
flag: Liberia [LR]
owner: COE Shipping GmbH & Co.,
Buxtehude, Germany
Chartered by:
Spliethoff's Bevrachtingskantoor BV,
Amsterdam, Netherlands
length: 138.51m / 454ft
built: 2010
ex names:
Marselisborg 2014 - 2016
Clipper Anne 2012 - 2014
Marselisborg 2010 - 2012
2023: Vessel sold, renamed BBC Alaska.