View allAll Photos Tagged deck

Renovated backyard from the deck view; don't know whose sunglasses those are, if you're missin' them let us know.

today I finished the skirting.

covered roof over gossen decking and black railing

Roof top deck will be in front of the house

 

Chapter 19 of the Eurobricks Star Wars Forums Mysteries RPG Story: Raiders of the Lost Art. Check out the full story in the Eurobricks forum:

 

www.eurobricks.com/forum/index.php?/forums/topic/200756-l...

  

You enjoy Star Wars, stories and building Lego? Join Mysteries, a global brickin' RPG in the Star Wars universe! Choose a side, create your Star Wars character and start building. Together with your teammates you score points, unveil the mysteries and rule the galaxy. Builders and storytellers of any size and level welcome. Mysteries main page:

www.eurobricks.com/forum/index.php?/forums/forum/201-myst...

Deck 5, Schönhauser Allee 80, 10439 Berlin Prenzlauer Berg, Schönhauser Allee Arcaden

 

View On Black

Designed by Victoria Marine Architect, Bradley Dale

Additional Design and construction consultation from Qualicum Marine Architect, Bruce Cope

Centre for Shellfish Research Project Manager – Brian Kingzett (250-740-6399)

VIU Welding Program lead on project - Owen Popplestone (250-753-3245 ext 6139)

 

Construction: Aluminum Construction was performed by Trades and Applied Technology Program Aluminum Boat Building Program Class of 2008. Vessel was then completed and fitted out by the CSR and Welding Program staff and contractors

 

Purpose: The Chetlo will go into service at the Deep Bay Field Station north of Nanaimo and will be used with the marine research and training shellfish farm operated by the station. The vessel will be used for farming and research support, training students and giving tours.

 

Design and Sustainability - The vessel is an aluminum catamaran which will provide a safe and stable working platform for aquaculture, research and training operations. Design and operations are sensitive to shellfish farming’s strict requirements for marine environmental quality. The vessel uses 4-stroke Yamaha outboards that meet highest emission standards, and the diesel hydraulic system operates on bio-diesel and uses environmentally friendly hydraulic oil. The vessel has an onboard toilet with waste holding to insure that waste is not discharged into the environment.

 

Name: R.V. CHETLO “Chetlo” is the Chinook Jargon name for oyster and was suggested by VIU employee John Morgan in an naming contest. Chinook Jargon originated as a pidgin trade language of the Pacific Northwest, and spread quickly up the West Coast from modern Oregon to the regions now Washington, British Columbia, and Alaska It is related to, but not the same as, the aboriginal language of the Chinook people, upon which much of its vocabulary is based (From Wikipedia)

  

Vessel Specifications

Dimensions:

Length: 11.96 M

Breadth: 3.65 M

Depth: 1.38 M

Gross Tonnage: 8.68

Net Tonnage: 8.25

 

Power:

2 x Yamaha T50 (high Thrust) outboards

1 x 30 Hp. Vanguard Diesel auxiliary

2 x 3Hp 12volt Lewmar bow thrusters

 

Equipment

Amco Veba Articulating Crane

GPS/Plotter/Sounder/VHF

Water Pump

On-board toilet with waste holding tank

  

The contrast of classical columns against the rustic deck.

Pressure washing the old finish and dirt off the deck. I ended up getting a 3500 PSI pressure washer... that was fun :)

skate deck for art show "WOOD MORNING"

On deck accommodation for the three new deckers. On arrival, all the upper saloon seats were liberally coated in salt residue.

Gutter and Colourbond added to skillion roof.

Deck M houses the twin torpedo launchers, flanking the turboshaft and vertical intermix chamber. We see the loading bay in its 2285 configuration, which allows cadets to be trained in manual loading. Later, however, Scotty is able to fire torpedoes remotely thanks to his automation system. Docking ports flank Launch Bays A and B, and life support equipment fills the remainder of the deck.

Deck 5, Schönhauser Allee 80, 10439 Berlin Prenzlauer Berg, Schönhauser Allee Arcaden

 

View On Black

Deck Chairs - July 4th on the Magothy

 

Unfinished words

flying like birds

high in the sky

above my deck chair.

Photo by Anjie Cook

 

It's time! Wyatt Deck, Arboretum icon since the mid 1960s, is scheduled for rebuilding this year! The new deck will pay homage to the existing design and materials while updating the pathways throughout the area, strengthening the underlying structure and addressing accessibility needs.

 

DEMOLITION BEGINS: SPRING 2021

NEW DECK OPENS: WINTER 2021

 

Learn more and give:

arboretum.ucdavis.edu/wyatt-deck

One Chill-out Summer: Spectacular view from the deck, this is Boracay. Didn't have the chance to have cocktails come sunset but nevertheless, the view is just perfect. Next chance I get, I gotta spend a sunset in this spot. Shangri-la Boracay...

Lakewood, Dr Zimbali, Eva-Last, Eva-tech, Xavia, Bamboo Composite Decking

Pool Decks, Sundecks, Patios, Porches, Balconies -

 

we at, Bibi Construction are also quite adept at constructing porches, balconies and providing services for sidewalks repair for the people of Los Angeles too. So, give us a call and get an immediate quote if you want any type of landscape, patio or deck constructed or installed in your home.

 

Info - bibiconstruction.com/general-contractor-services/landscap...

 

Contact us - bibiconstruction.com/contact/

 

#garden #backyard #wellmanicuredlawn #PoolDecks #Sundecks #Porches #Balconies #addvalue #beautifulgarden #constructedhome #patiosBuilt #newdecks #installed #Construction #buildingAndInstalling #ResidentialConstruction #LosAngeles #California #GardenersAndLandscapers #NewConstruction #LandscapeDesign #Turf #SavingWater #availableSpace

Angelim Pedra is a beautiful beige-brown hardwood with undertones of red with a gorgeous grain and an overall rich and inviting feel. Like Ipe, Angelim Pedra, if left untreated, will shift in color to a eye-catching silver-gray.

 

Angelim Pedra has a medium density, and is easily stained and oiled. Resistant to fungi and termites, Angelim Pedra makes an affordable and attractive deck that is sure to bring decades of enjoyment

Our Wallingford house back deck

at work this morning.

the tree and decorations are up.

now were getting into the swing of the season.

only 23 days till Christmas !

 

Fiberon Horizon composite decking in Brick

it's so damn hot.

upper deck

cleaned, power washed, dried, starting to stain the railings

Salguero Marine owner Diane Salguero (right) and employee Joel Mackey at work on the starboard side of the pilothouse.

 

salgueromarine.com/

www.facebook.com/marinefinishes

www.linkedin.com/pub/diane-salguero/48/144/b63

 

RIPTIDE was built in 1927 by the Schertzer Brothers Boat and Machine Company, then located on the north end of Lake Union at the foot of Stone Way in Seattle. She is 47 feet 1-inch long with a beam of 11 feet 10-inches and a draft of four feet. She is planked in port orford cedar riveted to white oak frames over a douglas fir backbone with western red cedar houses. At the time she was lifted out of the water in early April 2015 for her restoration, she weighed 24,000 pounds.

 

She was originally named NEREIAD, then, shortly thereafter, NOKARE. Her trunk cabin (the raised cabin aft of the pilothouse) was reportedly added (most likely extended) in 1933. By 1936, when owned by Russell G. Gibson, a Director of the Seattle Yacht club, she had been named RIPTIDE. Mr Gibson owned her through at least 1960.

 

RIPTIDE is a Coast Guard documented vessel and carries documentation number 226242 carved into the interior face of both port and starboard bilge stringers. She is documented at 17 net tons and 21 gross tons.

 

Her original engine may have been a Hall-Scott gasoline engine, but is as yet unknown. By 1959 she had an eight cylinder Chrysler Crown gas engine, a common engine of the time, most likely added in the late 1940's. That engine was removed in 1967 when RIPTIDE was re-powered by a 1967 Volvo MD-70A diesel engine. The Volvo engine was removed in early June 2015 and is being replaced by a Cummins 5.9 liter diesel of 210hp.

 

The first stage of her restoration began April 8th, 2015 when she was lifted out of the water at Port Townsend WA for hull and engine work by the Port Townsend Shipwright's Co-Op, and should be complete by the end of the first week in September.

 

1 2 ••• 11 12 14 16 17 ••• 79 80