View allAll Photos Tagged constructionwork
Lakhs and lakhs of women work at construction sites to support their family and help us build our dream home
Nederland, Noord-Holland, Gemeente Wieringen, 16-04-2012; Zeilboot op het IJsselmeer ter hoogte van het Monument van de Afsluitdijk. De Friese kust zichtbaar in de achtergrond.
Sailing boat at IJsselmeer lake at the the height of the Enclosure Dam, Frisian coast at the horizon
luchtfoto (toeslag), aerial photo (additional fee required).
foto/photo Siebe Swart
Marines with 1st Ballation 8th Marines, Bravo Company, 1st Platoon construct new barracks at Combat Outpost 7171, Helmand Province on October 27, 2010.
A breaker, often referred to as a "hoe ram" or "ho rammer", is used at the Kansas City Southern site for demolition work.
A breaker is a powerful percussion hammer fitted to an excavator for demolishing concrete structures or rocks. It is powered by an auxiliary hydraulic system from the excavator, which is fitted with a foot-operated valve for this purpose. Additionally, demolition crews employ the hoe ram for jobs too large for jack hammering or areas where blasting is not possible due to safety or environmental issues.
©Louisiana DOTD/Owen Murphy
Feel free to use this image but please give credit with a link to www.mechanicalcaveman.com (NOT Flickr)
Réalisation d'un centre thermal et aquatique comprenant des espaces de stationnement et une résidence hôtelière dans le cadre du projet Grand Nancy Thermal.
• Réhabilitation et extension de la piscine intérieure.
• Réhabilitation et extension du bâtiment de la piscine ronde.
• Création de nouveaux bassins extérieurs.
• Création d'espaces verts et de stationnements (découverts et souterrains).
Pays : France 🇫🇷
Région : Grand Est (Lorraine)
Département : Meurthe-et-Moselle (54)
Ville : Nancy (54000)
Quartier : Nancy Sud
Adresse : rue du Maréchal Juin
Fonction : Piscine
Construction : 2020 → 2023
• Architecte : Architectures Anne Démians / Chabanne & Partenaires
• Gros œuvre : Bouygues Construction
PC n° 54 395 19 R0043 délivré le 20 septembre 2019
Niveaux : R+3
Hauteur maximale : 26.66 m
Surface de plancher totale : 16 547 m²
Superficie du terrain : 37 248 m²
Nederland, Noord-Brabant, gemeente Grave, 15-11-2010. Maaskant,
stuw en sluis bij Grave. Het sluis- en stuwcomplex is gebouwd in het kader van de Maasnormalisatie. De Maas is een regenrivier, met met name in de winter grote wateraanvoer (ook door smeltwater). De vakwerkbrug is voor lokaal verkeer.
Weir and lock at Grave. The lock and weir (or dam) complex is built during the Meuse Standardization. The river Meuse is a rain river, with high water levels, especially during the winter (also by melt water). The truss bridge for local traffic.
luchtfoto (toeslag), aerial photo (additional fee required)
foto/photo Siebe Swart
Workers doing construction work that involves the moving of a heavy concrete pillar.
Despite the fact that they were leading a tougher life than us, they do look happier.
::Olympus OM-2n with Zuiko 50mm f/1.4 + Kodak EPP ::
Sa Pa, Việt Nam
Panorama of the new large area inside the Kremlin, cleaned of something unnecessary. Some buildings I think were here. Moscow, Russia, 2017.03.18
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt. Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
"Seestadt Aspern", Großbauprojekt in Wien.--19022015
"Seestadt Aspern", large building project in vienna´s outskirts. (Austria).--19022015
Concrete pouring machine used at the construction zone near the I-10/I-12 split.
©Louisiana DOTD/Owen Murphy
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt und sind inzwischen abgeschlossen; jetzt ist die Gegenrichtung dran.
Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
Inzwischen gibt es Veröffentlichungen, die als Endtermin für die Bauarbeiten das Frühjahr 2015 bzw. September 2015 nennen. Mal sehen was dann stimmt!
This is what parts of Parnell street looks like today [13 October 2017]
I live in Henrietta Place and the whole area has been a large building site for many years and at times the impact has been extreme mainly because of the Luas Cross-City Tram Project but there have been a number of other projects and programmes including the new museum in Henrietta Street [the building site was directly outside my bedroom] and the Grangegorman College Campus project. I have just discovered that a new hotel is planned for Bolton street and there may be a new apartment block at Henrietta Place.
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt und sind inzwischen abgeschlossen; jetzt ist die Gegenrichtung dran.
Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt und sind inzwischen abgeschlossen; jetzt ist die Gegenrichtung dran.
Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
Here is a closer view, zooming in to get the shot. I got this in the morning, after emerging from the 7th and Metro Station. I have more time in the morning between traveling and starting work. It is the end of the day that I am rushing to catch the first Red Line in order to catch as early a bus as possible back home.
During the summer holidays of 2007 the old terminus station of Wuppertal's suspension monorail has been taken down and was completely replaced by a modern steel-and-glass structure. In this photograph all the red and maroon parts are temporary supports and devices. Only the green parts will stay in place permanently.
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit ca. 6-7 Monaten statt. Vor ein vielen Wochen wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
Baustelle mit Rohbau eines Stationsgebäudes der Verlängerung der U-Bahnlinie U1 vor der Per-Albin-Hansson-Siedlung in der Wiener Favoritenstraße.--150032015
Construction site of subway extension U1 in front of the social settlement ´Per-Albin-Hansson-Siedlung´ in Vienna´s south suburb. (Vienna, Austria).--15032015
Feel free to use this image but please give credit with a link to www.mechanicalcaveman.com (NOT Flickr)
The part high above the blue "zooom" crane is the new switch which will connect the new suspension monorail terminus to the train shed and workshop.
Set---20042016--Vienna,Austria..
.
Pressebegehung der Baustelle der U-Bahn-Erweiterungsstrecke der U1 von der künftigen Station "Troststraße" zur künftigen Station "Altes Landgut" im Beisein von Infrastrukturminister Klug, "Wiener Linien"-Geschäftsführer Steinmeier und der Stadträtin für öffentlichen Verkehr, Sima..
Im Bereich der Begehung wurde nach Fertigstellung des Rohbaus der Innenausbau mit Verschalungsarbeiten und Kompettierung der technischen Infrastruktur forciert.