View allAll Photos Tagged constructionwork

Nederland, Noord-Holland, Amsterdam, 09-04-2014; knooppunt Holendrecht, A2 richting Utrecht. Fletcher Hotel en Food strip.

Junction motorway A2 with Fletcher Hotel and Food strip.

luchtfoto (toeslag op standard tarieven);

aerial photo (additional fee required);

copyright foto/photo Siebe Swart

Work at the 4-H Club Road construction site.

 

©Louisiana DOTD/Owen Murphy

Drivers enter Interstate 10 using the Highland Avenue on-ramp. Traffic control devices keep commuters and construction workers safe as work continues to add an additional lane to the on-ramp.

 

©Louisiana DOTD/Owen Murphy

 

Liftschacht (ca. 15 Stockwerke abwärts).--16022015

 

Lift shaft (15 storeys down).--16022015

Restoration work carried out in St Mary the Virgin Church High Street Oxford

As Depeche Mode might have said, it's "construction time again!"

"Citygate"--Errichtung von Wohnhäusern, Büros und Shoppingcenter an der Wagramer Straße neben der U1-Station Aderklaaer Straße, Wien.--12012015

 

"Citygate"-building site in northeast suburb in vienna, austria.--12012015

Crews with Boh Bros. stack timber on a large truck to transport it to the construction work zone.

 

©Louisiana DOTD/Owen Murphy

 

Shot from the convention center, where the CHI2012 conference took place.

Construction work at Abu Dhabi airport

Bronica SQ-Ai / Zenzanon-PS 80/f2.8 / Fuji Neopan Presto 100

日本、東京、神田

2007/12/28

 

See where this picture was taken. [?]

Preparatory operations in full swing: A temporary support for the new terminus station has been erected (left hand side of the photo) and a housing for the elevater has been delivered by a truck (right hand side). The station building itself has yet to be built. (Summer of 2007)

OLYMPUS DIGITAL CAMERA

 

Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt. Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.

Traffic control devices in place as construction crews work to widen the Highland Avenue on-ramp to Interstate 10.

 

©Louisiana DOTD/Owen Murphy

 

Scheveningen Harbour, The Hague, The Netherlands

(Yes, I´ve started back in the Film Days...)

  

Philosophikal Tools:

 

Series about Dualism.

Visualization of the kantian "Things-it-self" - some Tools of Artists, Thinkers, Poets and Philosophers...

Simple eidetik Way to illustrate what has Rodins Thinker in his Head.

 

If you like Photos & Thoughts kombined,

may you´ll like to join PhotoPhilosophy

   

©1999-2008 all Rights reserved, Krystian

Pile driving work at the Amite River bridge construction site.

 

©Louisiana DOTD/Owen Murphy

Work continues on the new pond at The Parade, Watford. Steps? Are we going to be allowed down to the water's edge to paddle?

I learned that the garden is being transformed in a major way for a special event taking place next month. A dance floor is being built over the pool! (Or maybe the guard was pulling my leg, but it does look like they are building a floor over the pool.)

Berlin. 2013.

 

"East Side Gallery Retten - Wall Parade"

 

Dr. Maria Nooke.

 

Thorsten Strasas. - Demotix. - Seconds2Real.

OLYMPUS DIGITAL CAMERA

 

Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt. Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.

This is what parts of Parnell street looks like today [13 October 2017]

 

I live in Henrietta Place and the whole area has been a large building site for many years and at times the impact has been extreme mainly because of the Luas Cross-City Tram Project but there have been a number of other projects and programmes including the new museum in Henrietta Street [the building site was directly outside my bedroom] and the Grangegorman College Campus project. I have just discovered that a new hotel is planned for Bolton street and there may be a new apartment block at Henrietta Place.

Construction of the second canal in progress.

"Citygate"--Errichtung von Wohnhäusern, Büros und Shoppingcenter an der Wagramer Straße neben der U1-Station Aderklaaer Straße, Wien.--12012015

 

"Citygate"-building site in northeast suburb in vienna, austria.--12012015

I Geo-Tagged these photographs so that you can identified where I visited. My photographs show a very narrow road that one needs to walk from Laughanstown Tram Stop to get to the old church and graveyard at Tully. As you can see from my photographs some people are are using the area as a rubbish dump. There are signs of extensive construction work under way in the area but some elements have the appearance of a stalled project.

 

If you visit this road take care as there is a surprising amount of traffic.

 

Laughanstown: The spelling of this name has varied considerably over time, and in some periods was almost indistinguishable from Loughlinstown, the name of which also varied. The spelling Laughanstown was adopted and fixed at the

time of the original Ordnance Survey in the 1830s. However, the evidence suggests that the name used locally was Lehaunstown, and this was noted by the Boundary Survey in the 1820s. Local usage did not change as a result

of the Ordnance Survey’s attempt to impose a new spelling.

Construction work at Abu Dhabi airport

The proposed HS2/Elizabeth Line interchange slowly taking shape. I sincerely hope they build the HS2 extension to Euston - as this location is very poorly sited for onward travel by anything other than rail.

The lines in the foreground give access to the Elizabeth Line depot. The GWR running lines are behind the site.

Seen by looking over the wall beside the Grand Union Canal.

Construction of the Livingstone Academy

OLYMPUS DIGITAL CAMERA

 

Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt und sind inzwischen abgeschlossen; jetzt ist die Gegenrichtung dran.

 

Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.

Not all that glitters is gold...

A new bridge in Zürich ;-)

 

Agfa Silette LK sensor, Fomapan 100

Development details on FilmDev

Some construction work ongoing in Singapore. This is construction work happening just next to the Suntec City with a cordoned off plot and with a crane overseeing the area. The crane apparently belongs to Hyundai, or maybe the project is being overseen by Hyundai. In the background are some buildings with trees on either side and in the front, is the section of a foot over-bridge for crossing the road.

Set---20042016--Vienna,Austria..

.

Pressebegehung der Baustelle der U-Bahn-Erweiterungsstrecke der U1 von der künftigen Station "Troststraße" zur künftigen Station "Altes Landgut" im Beisein von Infrastrukturminister Klug, "Wiener Linien"-Geschäftsführer Steinmeier und der Stadträtin für öffentlichen Verkehr, Sima..

Im Bereich der Begehung wurde nach Fertigstellung des Rohbaus der Innenausbau mit Verschalungsarbeiten und Kompettierung der technischen Infrastruktur forciert.

"Citygate"--Errichtung von Wohnhäusern, Büros und Shoppingcenter an der Wagramer Straße neben der U1-Station Aderklaaer Straße, Wien.--12012015

 

"Citygate"-building site in northeast suburb in vienna, austria.--12012015

1 2 ••• 40 41 43 45 46 ••• 79 80