View allAll Photos Tagged constructions

The construction zones made me feel bad for ever complaining about Texas Department of Transportation

WA St Convention Center Addition

 

my lichen photos by genus - www.flickr.com/photos/29750062@N06/collections/7215762439...

 

my photos arranged by subject, e.g. mountains - www.flickr.com/photos/29750062@N06/collections

New hotel under construction in the main road of Tsilivi, Zakynthos.

Construction underway on what became the data centre for the building society.

What we find in this album are series of photographs, plans and possibly sketches and documents connected to the various projects undertaken by the company.

 

Johns Slater & Haward (JSH) have over hundred and twenty years experience as an Ipswich building consultancy firm. Their experience of commercial and specifically school work in Suffolk was extensive. A particular specialism developed under the leadership of Birkin Haward was the geodesic dome, still to be seen in many local schools. The architectural arm of the practice sadly declined when the school work reverted to Local Authority in-house design teams. The practice, however, is still in business as a successful mechanical and electrical design consultancy.

 

The excavated site for the marketplace's first restroom complex at Traders Village in San Antonio.

Lots of quiet construction cranes as construction works stay on strike over the summer

Item Number: TN-PKRR020

Physical Description: 1 photograph: nitrate negative; 12.25 x 17.25 cm

Date of Creation: [192-?]

Scope and Content: Photograph shows four crew men ready to load more rock.

Photographer: Russell

Part of Fonds: CPR Kootenay Valley Railway

Part of Series: Photographs

Part of Subseries: Nitrate Negatives

Physical Condition: Mirroring throughout and amber hued

Numbering Note: Photographer's no. 20; Penticton Museum no. 2366

  

Construction workers at Bandra Kurla Complex Mumbai, joining morning shift

Does anyone recognize the place, or what they are building??

File name: 08_06_034883

Title: Construction?

Creator/Contributor: Jones, Leslie, 1886-1967 (photographer)

Date created: 1934 - 1956 (approximate)

Physical description: 1 negative : film, black & white; 4 x 5 in.

Genre: Film negatives

Subject: Construction; Boston (Mass.)

Notes: Title from information provided by Leslie Jones or the Boston Public Library on the negative or negative sleeve.; Date supplied by cataloger.

Collection: Leslie Jones Collection

Location: Boston Public Library, Print Department

Rights: Copyright Leslie Jones.

Preferred credit: Courtesy of the Boston Public Library, Leslie Jones Collection.

Looks like demolition and construction will be happening any day now on these adjacent properties on Biscayne Boulevard.

Construction of the Squish Studio in Tilting, on the North East Coast of Fogo Island, Newfoundland.

 

Designed by Todd Saunders (www.saunders.no) for the Fogo Island Arts Corporation (www.artscorpfogoisland.ca) and built by the Shorefast Foundation (www.shorefast.org).

Construction workers at Bandra Kurla Complex Mumbai, joining morning shift

Halo drip to the right

Construction of Phase II of the Craig F. Goess Student Center is nearing completion. PCC administrators anticipate the project, which began in May, to be finished sometime next month. Designed by Greenville’s JKF Architecture and built by Greenville-based Hudson Brothers Construction, the additional 15,000 square feet will house the college's bookstore and a variety of services, including a career center, computer lab, student lounge and conference rooms.

The bridge that separates one side of our town from the other has been under construction for almost a year now. While the construction crews have been doing their best I am sure, the construction has made life very hard on the local businesses, especially the ones we like best - the independantly owned Mom & Pop type businesses. Our favorite ice cream place is in the building on left edge of the frame - hidden from view by 2 ginormous rusty steel I-beams that are being used to stabilize the bridge. The ice cream shop has been closed now for 2 months. Normally they take a month off in January since the tourist traffic is so light and the cold weather for some reason locals eat less ice cream. This year they have been closed for 2 months so far, with no indication they will be opening anytime soon. Ah well, it is still an interesting engineering undertaking, so I shot an HDR image of it to try and capture more of the dynamic range of shadows and highlights.

Another docushot of what passes for excitement in my world. This corner has smelled like an open latrine for years.

The Gardens on Rose, a 15-storey condo tower under construction in downtown Regina.

Title: Houses under construction

 

Creator: Adolph B. Rice Studio

 

Date: 1959 Aug. 14

 

Identifier: Rice Collection 2474A

 

Format: 1 negative, safety film, 4 x 5 in.

 

Rights Info: No known restrictions on publication.

 

Repository: Library of Virginia, Visual Studies, 800 E. Broad St., Richmond, VA, 23219, USA, digitool1.lva.lib.va.us:8881/R

The long cloud edge of a weather front looms over ...

Horseshoe Casino, under construction.

 

Baltimore (Sharp-Leadenhall), Maryland, USA.

(looking south along Warner Street)

28 September 2013.

 

*************

â–¶ Horseshoe Casino is expected to open in 2014 as an urban two-story casino, and will be the second largest casino in Maryland with a 122,000 sq. ft. gaming floor. The multi-million development will feature VLTs, table games, and a World Series of Poker room. A 20,000 sq. ft. "Baltimore Marketplace" featuring authentic Charm City food outlets, three premier restaurants, and several bars and lounges will round out the food and beverage offerings.

 

The $400 million development will be located along Russell Street on Baltimore's south side. As an urban casino, it will be designed to maximize connectivity with existing hospitality operators, neighboring professional sports venues M&T Stadium (NFL-Ravens) and Camden Yards (MLB-Orioles), and the city's famed Inner Harbor.

 

***************

â–¶ Photo by Yours For Good Fermentables.com.

â–¶ For a larger image, type 'L' (without the quotation marks).

— Follow on Facebook: YoursForGoodFermentables.

— Follow on Instagram: @tcizauskas.

â–¶ Camera: Olympus Pen E-PL1.

— Lens: Olympus M.14-42mm F3.5-5.6 II L

— Focal length: 14 mm

— Aperture: ƒ/10

— Shutter speed: 1/640

— ISO: 200

â–¶ Commercial use requires explicit permission, as per Creative Commons.

Third image in the series, construction of the Minnesota Vikings (American) football stadium. Taken from the adjacent light rail station in December, 2014 on my return from Death Valley.

Destruction? Work in progress....

1 2 ••• 30 31 33 35 36 ••• 79 80