View allAll Photos Tagged constructions
As the result of the archaeological excavations that started in Bergama in 1878 under the direction of Carl Humman and Alexander Conze, a depot museum has been constructed near the German Excavation House of today during the excavations made in the acropolis between the years 1900 - 1913. This depot is one of the two archaeological opus depots that existed in Turkey at that time. The excavations in Bergama, which were interrupted because of the 1st World War, were re - started under the direction of Theodor Wiegand. In the same year, with the start of the excavations in Asklepieion in addition to the acropolis excavations, the number of opuses has increased and a new museum building was needed.
Marshall Fevzi Çakmak, who came to Bergama in 1932 has closely interested with the issue and ordered the foundation of a new museum after his visit. For the new building that was planned to be constructed with Turkish - German cooperation, the location of today which is an old cemetrey has been found appropriate. The project that was prepared by the architects Bruno Meyer and Harold Hanson was completed at the end of 1932 and the works for base excavation were started in 1933 with the formal request of the governor of İzmir, Kazım Dirik. Mustafa Kemal Atatürk, who visited Asklepieion, which was a health centre, during his visit to Bergama on April 13th 1934, has seen that the construction of the museum building was continuing.
Bergama museum, whose construction has been completed, was opened for visit on October 30th 1936 by the governor of İzmir, Fazlı Güleç. The museum building consisted of a large rectangular courtyard surrounded with galleries, and a rectangular exhibition hall behind this courtyard. Since the galleries of the courtyard were suitable for open - air museum, the opuses were exhibited there. When Ethnography and Archaeology Museum was taken into operation in Bergama Public House building in 1924, the archaeological opuses were taken to the new museum building. The ethnographic opuses were taken into the museum building of today in 1979 after the construction of the additional building. The additional building has a rectangular plan placed beside the part, in which the courtyard and exhibition hall exist, its entrance is provided via a door opening from the courtyard to the hall. Units such as depot, laboratory, photograph room, archive have been added to the other side of the museum which was left empty and to its rear part.
Most of the archaeological opuses in the museum, which belong to various periods from early bronze era to the Byzantine Period, have been found in the excavations made in Bergama and its surrounding. Among the finds found in the archaic residences around, samples belonging to Pergfamon sculpture school, Archaic Period finds coming from Pitane and Gryneion, Myrina terracotta draw attention. In the ethnography section, carpets, kilims of the region (Yuntdağ, Yağcıbedir, Kozak, Bergama weavings), cloth weaving samples, hand works and other hand made opuses belonging to other regions of Anatolia are exhibited
www.kultur.gov.tr/EN,113958/izmir---bergama-museum.html
www.flickr.com/photos/feridun_f_alkaya/albums/72157671080...
Ultimate Construction
El Paso, TX, zip codes 79901-79999, 88510-88595
915-493-2791
"construction contractors el paso texas tx"
Photos from a tour of the soon-to-be Mediacom Stadium in Des Moines. The project is a joint venture between Des Moines Public Schools and Drake University providing a new high school football and soccer stadium as well as an on-campus venue for the Drake Bulldogs soccer programs.
Columbia University Lerner Hall - New York, United States
HDA : Glass & Wall System Design - Structure & Facade Design
Client : Columbia University
Architect: Bernard Tschumi Architects & Gruzen Samton
Date : 1995 - 1999
See more at : www.hda-paris.com/
Construction for Arlington County's Crystal City Potomac Yard Transitway - Pouring of concrete columns for Station C on South Glebe Road
If a building looks better under construction than it does when finished, then it's a failure.
Doug Coupland
Back at the construction site in Jordbro. This was a quarry last year and a forest two years ago. One of a few construction sites around Haninge that I visit with a camera every now and then.
Construction work on Beijing's CBD Core Area - which will contain some 18 new office towers - pauses for the Chinese New Year holiday.
I was walking down Bleecker Street in New York and came across these construction workers washing up and getting ready to call it a day. They seemed to be having fun with the hose, so I quickly started snapping a bunch of shots as the guy with the bandanna saw me and starting smiling and waving at the camera. I like this one best though cos it caught the guy as he noticed me.
First week of October, 1995. It took me all summer to get this far. The interior is still bare concrete floors and wooden studs at this point.
Germogly - Italy
HDA : Architecture and engineering
Client : Terna
Architect : HDA have won first prize in the "Pylons of the Future" international competition for Italian energy supplier
Date : 2009
See more at : www.hda-paris.com/
More building construction in central Manchester, I think this was behind Salford Central Station, but can't recall the exact spot.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Please do not use this photo or any part of this photo without first asking for permission, thank you.
____________________________________________