View allAll Photos Tagged completed
After this pan, it occurred to me that it would be easier to transport the cupcakes sans cookie, so I added the rest of the cookies after delivering the cupcakes. Oops!
Here's a shot of the Dog House with the main log walls completed. The Dog Cabin is beginning to take on its character. Startin' to look rather cute, even!
You can see the all-thread at work. When you consider the narrow runs near the door and window, you can see why I chose all-thread as a means of keeping everything aligned and secured. This little structure is exceptionally sturdy!
Next steps: The roof planks, in classic Lincoln Logs style, and of course teh log gable ends. The roof planking and the log gable ends go hand-in-hand: the geometry and laps will have to be carefully figured out in CADD before beginning.
Completed LEM 10266 with modifications: foldable landing gear (as per the real LEM), guard rails on the upper platform of the egress ladder, use of gold duct tape to emulate the foil on the descent module, beefier life support packs to better emulate what was carried by the astronauts on their lunar excursion.
Ben teruggegaan naar de plek waar dit plantje groeide en heb een exemplaar uitgestoken en meegenomen om in mijn tuin te zetten.
Bij nader inzien denk ik niet dat dit een wild plantje is maar een gecultiveerd plantje.
De plantjes groeien weliswaar in de berm, dwz op een houtwal, maar aan de andere kant van de houtwal lag een grote tuin horende bij een villa. De houtwal was opgebouwd uit tuinafval dus ik denk dat wat zaadjes of stekjes daarin terecht gekomen zijn.
Misschien weet je nu Brigitte wat de naam is van dit plantje , nu het in zijn geheel op de foto staat.
I got everything sealed up and now it's fully functional. I'd like to do a better job of securing the board inside, as well as the battery needs a little less wiggle room so it's not moving around so much, but I got the job done! Another thing I noticed after the fact was that I had mounted the switch in the opposite direction from what logic would dictate. Live and learn!
3DVIA Top Ten 006
www.3dvia.com/aaronklapheck/models/41D1E477495B6D7F
Click on the link to go to the 3D model where you can spin, zoom and explore it!
Dynamic spreader spar components.
Completed bushing assembly with heat shrink and tie wraps installed.
7/21/13: A design improvement for additional strength is to apply three or four wraps of fiberglass cloth around the bushings and soak with fiberglass resin or epoxy glue prior to adding heat shrink tubing. Note that the tie wraps are not necessary if the fiberglass cloth is used.
Here I've cut out the trailing edge notch and the tail light hole in the fairing, then test fit it to the bottom of the rudder. The fit is very good.
This pulls from a 50A stove service and produces:
2x120V 20A receptacles
2X 240V 20A receptacles
1x 120/240V 30A receptacle
1x 120/240V 30A locking receptacle
1x 250V 50A receptacle
minifig_swiper_brick9_repeat_offender_buster_SJCommander_July4
-------
LINK
us.universe.lego.com/en-us/creationlab/DisplayCreation.as...