View allAll Photos Tagged completed
Complete Frame-off Restoration!
Absolutely Flawless!
Please call 1 (321) 250 2520 or email to sales@vintagecruisers.net with "Blue 1980 BJ40" on subject line.
Price: $37,500 USD
A shot from the final rehearsal of Highbury Players production of The Complete History of America (abridged) at Highbury Theatre Centre, Sutton Coldfield, Birmingham, England. January 2014
I completed my primary set yesterday. They aren't perfect, but I love that about them.
They are all the older set without mold numbers and marked TM REG then PYREX then US Pat Off.
Costume fully assembled. Headlight wand installed in dome, sitting on head, sitting on top (with weapons installed), sitting on body. All sections are hot-glued to each other.
White light in the utiliy room (darkroom) is controlled by the door switch, and the safelight(s) will be conrolled by a pull-cord over the sink and/or by the enlarger timer. Having the pull cord for the safelight 8 feet from the doorway switch for the white light should eliminate instances of "Oops, not that light...damn it!"
The final completed pictures of the Carl Sagan Corvair Spyder convertible. Restoration by Dennis Dorogi 5/29/2014 restoration started in 2009, see other Sagan Spyder albums for step by step restoration
Lee Sun Kyu ah~
You've made my life completed with your beautiful eyes, your killed smile, your aegyo, your dorky, your everthing xD
------------------------------------------
Hôm nay đi học Sinh
Càng ngày càng có thể khẳng định rằng : CHẮC CHẮN MÌNH SẼ KHÔNG VÔ NỔI ĐỘI TUYỂN TRƯỜNG !!!!!!
Aissshhhhh
I'm such a loser
I never can defeat them
Ahhhhhhhhhhhhh
*FAIRWEATHER* CX complete bike
BLUE LUG custom
SPEC
Frame: *FAIRWEATHER* CX frame BLUE LUG CUSTOM PAINT by COOK PAINT WORKS
Stem: *SIM WORKS* caroline stem (black)
Headset: *CHRIS KING* nothreadset (rasta)
Wheels: *H PLUS SON* archtype rim × *SHIMANO* 105
Tire: *CONTINENTAL* gator skin tire
Brake & Shift lever:*SHIMANO* 105
RD: *SHIMANO* 105
Crankset: *SHIMANO* 105 crankset (black)
Chainkeeper: *PAUL* chain keeper (black)
Seatpost: *THOMSON* elite seatpost (black)
Saddle: *BROOKS* swift
Brake: *TRP* eurox
Handle: *DEDA* RHM 01 drop handle (black)
Bartape:*FIZIK* microtex bartape
Completed in 1979, that time the 39-stories building was the tallest building in the entire Middle East.
The back of the pack crew of the Lake Auburn half marathon. It didn’t take long for me to lose sight of these athletes. But I did complete my training and I did finish so there is that.
Here's the whole outfit. I came up with the idea over the weekend, it suddenly all came together! For sale on Etsy.
Halloween Pumpkin Lantern tablemat
Blogged at celticthistlestitches.blogspot.com/2012/10/halloween-pump...
In preparation for the BRME I've been putting the final glazing and roof structures to the Bath platforms 3 & 4. On the right hand side is the base for the path that ran behind the wall at the end of the station.
Over the next few days (till Sunday night) I hope to complete the glazing on the Gloucester platforms and the roofing on the central platform.
I'm in Hall 3, so if you're coming to the exhibition this year, pop by and say hello!