View allAll Photos Tagged completed

Completed in 1916 and on the National Register of Historic Places.

Complete details on The Brothers Brick.

 

(Official photos shared with written permission from the LEGO Group.)

Volcano Choir at The Commodore Ballroom, Vancouver (January 2014)

Holy wow, I did it! I can't even believe it really. It was incredibly challenging at times but ultimately one of the most fulfilling things I've ever done. I have a few shots I loathe when the inspiration was lacking but pretty happy with the majority of them. Yay for perseverance!

 

Thanks to everyone that stopped by my stream and encouraged and inspired me.

 

Happy New Year everyone!!!

For my first Gunpla, and my first plastic model (outside of LEGO) that I have built in years, it does not look too bad. My next kit will be more in depth and be a completely painted kit to help hide any mistakes (nub marks, seam lines, etc.) that are made during the build. Overall I am very satisfied with this kit.

Done with the PCB! Now it's time to drill the chassis and attach other components (power transformers, external sockets etc.). Like Kim said, looks like a toy, but I probably wouldn't recommend your average 6 year old play with electricity and toxic materials such as lead.

www.justgiving.com/fundraising/koji-moriya100

 

Interestingly, I did not feel exhausted and both my legs are not-surprisingly very achy!

*SURLY*cross check complete bike

Blue Lug Custom

Spec

 

Frame: *SURLY*cross check

Headset:*CHRIS KING* nothreadset

Wheels: *H PLUS SON* the box road wheel

Tire: *PANARACER* pasela blacks plus

Crankset:*SUGINO* XD2

Brake lever:*SHIMANO*bl-r400

Brake:*TEKTRO*

Handle: *FAIRWEATHER* mod-174

Bartape:BROOKS* microfiber bartape

Stem: *NITTO*ui-75

Saddle:*BROOKS* b17

Seat post:*NITTO* 65 seatpost

Seat clump:*PHILWOOD* seat post collar

FD&RD:*SHIMANO*claris & altus

Pedal:*MKS* bm-7

Sunday morning. Check. Time to get going. If I can just put this book down.

This is immediately after our completion of R2R2R - It was an ass kicker

These are used to mount the boiler and smokebox assembly.

Le Lapin d'Alice a abusé des substances.... 2013 Madrid

Special Exhibit: Xiongnu, Henan Provincial Museum, Zhengzhou. Complete indexed photo collection at WorldHistoryPics.com.

Blogged

February 1, 2011 - added gold embossing powder

I don't trim the ends of my components as this would just waste clay. The drawback is that I can't tell exactly what the pattern looks like.

*SURLY*cross check complete bike

BLUE LUG custom

 

SPEC

Frame:*SURLY*cross check BLUE LUG CUSTOM PAINT by COOK PAINT WORKS

Headset:*FAIRWEATHER*

Wheels:*H+SON*BOXrim ×*SHIMANO*

Tire:*PANARACER*pasela

Brake lever:*TRP*rrl

shift lever:*SHIMANO*

Crankset:*FAIRWEATHER*road crank

Pedal:*MKS*sylvan touring

FD&RD:*SHIMANO*

Brake:*TEKTRO*

Handle:*FAIRWEATHER*mod-174

Saddle:*BROOKS*Cambium C17 curved

Rack:*NITTO*campee cross

At the risk of coming off as bragging, I have to say that I think the best work I did on this build was the Campagnolo Chorus Ergopower levers. I really went to town cleaning them up, learned to disassemble/reassemble them and added a little bit of drillium to boot.

 

I think they look superb in their final form and they work flawlessly, which is the most important thing of all.

again, from KaylinBrit! a bunch of complete non-kawaii-branded letter sets.

This is the transceiver I'm using on all the Welsh Border summits as I count down from G/WB-024 to G/WB-002 (there is no longer a G/WB-001)

healthy complete breakfast - Bowl of cereal and aglass of juice a healthy snack for kids. To Download this image without watermarks for Free, visit: www.sourcepics.com/free-stock-photography/24709815-health...

just to show she is stable and solid: held in 2 fingers with no saggy bits

Am Std Strat, completed fretwork, headstock side of neck.

ASTEROIDS cookies! Read more about this project here.

In under 3 months the building is complete, just on time for paying guests!

Photo: Mark Bolton

1 2 ••• 32 33 35 37 38 ••• 79 80