View allAll Photos Tagged w@
N&W SD35 1526 leads an Eastbound D&H freight that has just arrived on the West side of Hornell, NY on February 3, 1979. The train is stopped and the power is about to head down to the shops area for fuel. We were offered a ride by the crew, and rode in the UP unit down to the fuel racks and back. Good times back then.
Cheap piece of jewellery looking better in B&W.
Don't use this image on websites, blogs or other media without explicit permission.
© All rights reserved
BB 26033 en tête du W 725300 Bourg-Saint-Maurice - Paris-Austerlitz (Saint-Pierre-d'Albigny, 21 février 2016)
P&W's Gardner to Worcester, Mass freight makes a beautiful reflection near Holden passing Maple Spring Pond. Catching a matched set of a freshly fallen flag was icing on the cake to an already productive day of railfanning.
Thank you, dear friends, for your visit, comments and faves, very much appreciated. I take into consideration your evaluation of my photographs when choosing them for the print and exhibitions.
This photo was winner of "Expressive Faces Photo Contest" 2019 - www.viewbug.com/blog/expressive-faces-photo-contest-winner
They gave me a camera Nikon D3300 SLR.
Felt like a long time since I made these simpler figures but I gotta say it is really nice how quick they are done compared to more complex figures. The paintjob youbsee here took a little less than 2 hours.
In case you didn't know I love young justice I think it is one of the best animated shows ever. So I felt weird not having good customs of the team (aset from arsenal)
UPDATES ON FUTURE CUSTOMS:
My captain Rex figure is still done. The reason I don't post him right away is because I have no idea how long it will take for me with the next complex figure after that so I'm holding on for now. I have yet to decide what character I wanna make from episode 3 however my rebels custom is about done.
Kitikmeot W nears completion of the last bunker C fuel delivery to the city of Iqaluit before the Arctic Ice Cap descends beyond the entrance to Frobisher Bay, sealing off the harbour until June the following year.
All the fuel necessary for aircraft flying in and out of Iqaluit, home heating, cars and snowmobiles, as well as power generation for the Community of 6000 must be provided by ship before freeze up.