View allAll Photos Tagged sitework

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

 

Rooftop ramp being prepared for demolition.

was hoping to catch smooth new paving. don't use.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

 

Ramp lighting being removed as part of demolition.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

 

Ramp light after removal.

$29 million, multi-phased project within an occupied museum; 23,000 sf new addition onto existing building included ticket booth, lobby, flexible exhibit spaces, covered outdoor seating, Adventure Center, hardscaping, sitework, and landscaping package; 150,000 sf renovation included updating multiple exhibit areas, new finishes, administrative offices, dining facility, installation of elevator, and new green sustainable roof; addition achieved LEED® Gold Certificatio

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

 

Ramp lighting after removal.

Granada Village Shopping Center Redevelopment (Building A1 & A3 Roof Construction - 2012-02-09) - Granada Hills, CA. Urban One www.urbanone.com.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

Site work continues on the west side of the Dominican Center.

Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.

Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.

Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.

Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.

 

uilding 1

Roof Trusses are 95% complete with sheathing 75% complete on the building.

Mechanical, Electrical, Plumbing rough in is underway on the 3rd and 4th floors and 50% complete.

Shingle and Flat Roof Installation is underway and 65% complete.

Building weather wrap is being installed and 90% complete.

Window Installation is underway and 75% complete.

Siding installation has started in the Courtyard.

Parking Garage Sprinkler systems is 75% complete.

Courtyard waterproofing prep is underway.

 

Building 2

Roof Sheathing is complete.

Mechanical, Electrical, Plumbing and Fire Sprinkler rough in is 40% complete at the 3rd floor and progressing up to the 4th floor.

Shingle and Flat Roof Installation is underway and 95% complete.

Building weather wrap is being installed and 95% complete.

Siding is underway on the South elevation and is 10% complete

Window Installation is underway and 85% complete.

 

Building 3

Wood framing has commenced.

 

Building 4

Foundation is 100% complete

Elevator shaft construction is complete

Underground Plumbing Rough is 65% complete

Underground Electrical Rough is 75% complete

 

Building 5

Foundation, underground utilities and slab is complete.

Progress pending framing start forecasted to start in November, 2018.

 

Building 6

Siding is complete.

Insulation is complete

Drywall installation is complete.

Site curbs are complete.

Painting is underway

Tile installation is underway.

Interior door and trim is underway.

 

Sitework

Curb formwork and installation is 90% complete on Mill Road

Starting to set building site to final subgrade

Pump station Wet Well foundation walls have been poured and wall formwork for balance of building is 95% complete

Damproofing and backfill has started.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

 

Rooftop ramp shortly before demolition.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

 

'Scar' of ramp lighting after removal.

Granada Village Shopping Center Redevelopment (Building A2 Facade Construction - 2012-02-09) - Granada Hills, CA. Urban One www.urbanone.com.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

Recently constructed retaining wall. Construction at Cahill Park, Whitefish Bay, Wisconsin. September 2013.

I made a handful of models today for placement in a scene that will go with a bunch of other skyscrapers and roads made by co-workers for a large 3d city space. This is my part, the suburbs.

Granada Village Shopping Center Redevelopment (Phase 2 Dining District Sitework Construction - 2012-03-06) - Granada Hills, CA. Urban One www.urbanone.com.

Pictures of heavy equipment working at Big Iron's yard in Jacksonville, FL. This is where we dismantle and containerize heavy equipment to ship overseas.

Visit us at www.bigiron4sale.com

Granada Village Shopping Center Redevelopment (Phase 2 Dining District Sitework Construction - 2012-01-25) - Granada Hills, CA. Urban One www.urbanone.com.

Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.

Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.

Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.

Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.

 

Granada Village Shopping Center Redevelopment (Building A3 & A4 Facade Construction - 2012-01-25) - Granada Hills, CA. Urban One www.urbanone.com.

My beautiful picture

Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.

Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.

Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.

Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.

 

My beautiful picture

Granada Village Shopping Center Redevelopment (Building A1-A4 Rain Damage - 2012-01-24) - Granada Hills, CA. Urban One www.urbanone.com.

Granada Village Shopping Center Redevelopment (Building A1-A4 Rain Damage - 2012-01-24) - Granada Hills, CA. Urban One www.urbanone.com.

Newly constructed sitework / drainage and stormwater infrastructure associated with the Hoods Creek Sanitary Sewage Attenuation Basin, an underground sanitary sewage storage facility. Caledonia, Wisconsin, near Racine. September 2013.

local mob

 

the building of a bark canoe in Bundanon with Kim Wallis, Steve Russell and Noel Lonesborough from Boolarng Nangamai Aboriginal Corporation:

bnstudio.com.au/page/

 

The project was supported by Bundanon Trust

and produced as part of SiteWorks:

www.bundanon.com.au/content/siteworks-canoe

Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.

Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.

Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.

Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.

 

Granada Village Shopping Center Redevelopment (Existing Pad I/J Demolition - 2012-01-27) - Granada Hills, CA. Urban One www.urbanone.com.

Project Description:

 

Complete siteworks include clear and grubbing, rock blasting large steel and HDPE pipe installation.

Plant includes 500,000 gallons concrete clearwell, 4 filter cells – 107,000 sq. ft., a separate Chlorination Building, as well as a Control Valve Building.

   

The Westpro Advantage:

 

All earthworks were coordinated on a very confined and executed with Westpro forces.

 

The 20,000 m3 of filter sand was screened and washed on site to alleviate costly time consuming trucking off and back to site.

 

This March at New Village the following major construction items were underway:

 

Building #1 and #2 – Courtyard Planter construction on exterior and on interior doing paint touch ups, final inspections and cleaning in advance of April 1 Tenant Move In.

 

Building #5 – Painting, Tile, Flooring installation and completion of exterior brick façade

 

Building #3 – Drywall and spackle operations, painting and floor tile, brick façade installation and siding installation

 

Building #4 – Mechanical, Electrical and Plumbing Rough In, Exterior siding installation

 

Sitework – finishing curb and sidewalk installations and brick paver installation has started. Preparations being made for final level of asphalt paving.

 

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

My beautiful picture

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

1 2 ••• 4 5 7 9 10 ••• 76 77