Roof Trusses are 95% complete with sheathing 75% complete on the building.

Mechanical, Electrical, Plumbing rough in is underway on the 3rd and 4th floors and 50% complete.

Shingle and Flat Roof Installation is underway and 65% complete.

Building weather wrap is being installed and 90% complete.

Window Installation is underway and 75% complete.

Siding installation has started in the Courtyard.

Parking Garage Sprinkler systems is 75% complete.

Courtyard waterproofing prep is underway.

 

Building 2

Roof Sheathing is complete.

Mechanical, Electrical, Plumbing and Fire Sprinkler rough in is 40% complete at the 3rd floor and progressing up to the 4th floor.

Shingle and Flat Roof Installation is underway and 95% complete.

Building weather wrap is being installed and 95% complete.

Siding is underway on the South elevation and is 10% complete

Window Installation is underway and 85% complete.

 

Building 3

Wood framing has commenced.

 

Building 4

Foundation is 100% complete

Elevator shaft construction is complete

Underground Plumbing Rough is 65% complete

Underground Electrical Rough is 75% complete

 

Building 5

Foundation, underground utilities and slab is complete.

Progress pending framing start forecasted to start in November, 2018.

 

Building 6

Siding is complete.

Insulation is complete

Drywall installation is complete.

Site curbs are complete.

Painting is underway

Tile installation is underway.

Interior door and trim is underway.

 

Sitework

Curb formwork and installation is 90% complete on Mill Road

Starting to set building site to final subgrade

Pump station Wet Well foundation walls have been poured and wall formwork for balance of building is 95% complete

Damproofing and backfill has started.

mcad.edu Four permanent murals designed and produced by students in Elissa Cedarleaf Dahl's Fine Arts Studio Siteworks class will be unveiled at the historic Parkway Theater.

 

Photograph ©Erin Nicole Johnson for the Minneapolis College of Art and Design

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

Electrical underground for new relocatable classrooms

This March at New Village the following major construction items were underway:

 

Building #1 and #2 – Courtyard Planter construction on exterior and on interior doing paint touch ups, final inspections and cleaning in advance of April 1 Tenant Move In.

 

Building #5 – Painting, Tile, Flooring installation and completion of exterior brick façade

 

Building #3 – Drywall and spackle operations, painting and floor tile, brick façade installation and siding installation

 

Building #4 – Mechanical, Electrical and Plumbing Rough In, Exterior siding installation

 

Sitework – finishing curb and sidewalk installations and brick paver installation has started. Preparations being made for final level of asphalt paving.

 

taken by Panasonic G2 + Lumix G Vario 14-140mm

the fold

 

the building of a bark canoe in Bundanon with Kim Wallis, Steve Russell and Noel Lonesborough from Boolarng Nangamai Aboriginal Corporation:

bnstudio.com.au/page/

 

The project was supported by Bundanon Trust

and produced as part of SiteWorks:

www.bundanon.com.au/content/siteworks-canoe

My beautiful picture

This March at New Village the following major construction items were underway:

 

Building #1 and #2 – Courtyard Planter construction on exterior and on interior doing paint touch ups, final inspections and cleaning in advance of April 1 Tenant Move In.

 

Building #5 – Painting, Tile, Flooring installation and completion of exterior brick façade

 

Building #3 – Drywall and spackle operations, painting and floor tile, brick façade installation and siding installation

 

Building #4 – Mechanical, Electrical and Plumbing Rough In, Exterior siding installation

 

Sitework – finishing curb and sidewalk installations and brick paver installation has started. Preparations being made for final level of asphalt paving.

 

Clopton Siteworks

2601 Maury Street

Richmond, Virginia

37º30'36" N 77º27'11" W

 

These are some of the 26 former tobacco storage warehouses located on this site. Now listed in the National Register of Historic Places, renovation of the warehouses began in 2015. The umbrella term for all the buildings is Clopton Siteworks; small businesses and self-storage companies attach their names to individually leased spaces in the buildings. The coordinates for this specific photo are 37º30'37" N 77º27'27" W.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

SiteWorks are performances on campus that marked the culmination of a collaboration between Dance and Creative Placemaking Architecture students who have been developing site-specific works over the course of the spring semester. The SiteWork "Somebody Had to Do It" was performed and installed at the Iribe Building. Photos: Jelena Dakovic.

Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.

Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.

Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.

Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.

 

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

 

Rooftop ramp gated up due to demolition.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

This March at New Village the following major construction items were underway:

 

Building #1 and #2 – Courtyard Planter construction on exterior and on interior doing paint touch ups, final inspections and cleaning in advance of April 1 Tenant Move In.

 

Building #5 – Painting, Tile, Flooring installation and completion of exterior brick façade

 

Building #3 – Drywall and spackle operations, painting and floor tile, brick façade installation and siding installation

 

Building #4 – Mechanical, Electrical and Plumbing Rough In, Exterior siding installation

 

Sitework – finishing curb and sidewalk installations and brick paver installation has started. Preparations being made for final level of asphalt paving.

 

Michels Construction drives sheet pile with an ICE44 crane-suspended vibratory hammer ("vibro hammer"). Sitework for the construction of a 31-story highrise in Milwaukee, Wisconsin. The project is located along the Milwaukee River in the Third Ward neighborhood, at 333 North Water. Hines is the developer, the general contractor is W.E. O'Neil, and Michels is doing the foundation work.

 

September 15, 2022

Original key: IMG_1480

Construction continues on the site of the Mass General's new B3C building (Building for the Third Century).

Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.

Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.

Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.

Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.

 

$6 million, 10,500 sf ground-up construction of a new chapel and meeting area; scope of work included sitework, landscaping, limestone and granite veneers imported from Jerusalem, structural steel, fritted glass wall, slate roof, millwork, ceramic tile, wood flooring, and acoustical ceilings

uilding 1

Roof Trusses are 95% complete with sheathing 75% complete on the building.

Mechanical, Electrical, Plumbing rough in is underway on the 3rd and 4th floors and 50% complete.

Shingle and Flat Roof Installation is underway and 65% complete.

Building weather wrap is being installed and 90% complete.

Window Installation is underway and 75% complete.

Siding installation has started in the Courtyard.

Parking Garage Sprinkler systems is 75% complete.

Courtyard waterproofing prep is underway.

 

Building 2

Roof Sheathing is complete.

Mechanical, Electrical, Plumbing and Fire Sprinkler rough in is 40% complete at the 3rd floor and progressing up to the 4th floor.

Shingle and Flat Roof Installation is underway and 95% complete.

Building weather wrap is being installed and 95% complete.

Siding is underway on the South elevation and is 10% complete

Window Installation is underway and 85% complete.

 

Building 3

Wood framing has commenced.

 

Building 4

Foundation is 100% complete

Elevator shaft construction is complete

Underground Plumbing Rough is 65% complete

Underground Electrical Rough is 75% complete

 

Building 5

Foundation, underground utilities and slab is complete.

Progress pending framing start forecasted to start in November, 2018.

 

Building 6

Siding is complete.

Insulation is complete

Drywall installation is complete.

Site curbs are complete.

Painting is underway

Tile installation is underway.

Interior door and trim is underway.

 

Sitework

Curb formwork and installation is 90% complete on Mill Road

Starting to set building site to final subgrade

Pump station Wet Well foundation walls have been poured and wall formwork for balance of building is 95% complete

Damproofing and backfill has started.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

The Asterisk Project : Siteworks festival preview from Tacoma Museum of Glass

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

 

Bridge to parking lot closed until completion of Aldi.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

 

'Scar' for ramp light.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

 

Ramp lighting being removed in preparation for demolition.

Truck 424, a newer T800 belonging to Pioneer Sand Company. This one has a Caterpillar C11, 10 speed, and 3.90 rears. It also has an electric tarp, rock tub dump body, and high lift gate. Pioneer's tandems do mostly residential and commercial deliveries of landscape products and materials. Hence, they're geared more for on-road use than for sitework. Also note the lever in the middle of the dump body for the split gate, which allows two separate commodities (or two separate mixtures of commodities) to be carried together without being mixed together. Great for when a single order contains two products, or when two small orders can be shipped together. The split gate can be a pain in the ass, though. There've been a couple times where I'd be loaded with a full load of a single product, and the gate would latch down during the loading process. A lot of the time, I'd have to dump out the back portion, bring the bed down, put the truck in motion, slam on the brakes when I had built up enough speed, get out to pull the gate open, then go back to the pile and dump again. Also, with that gate closed and product in the front compartment, one has to be extremely careful not to allow the truck to tip over.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

 

Ramp lighting being removed in preparation for demolition.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

 

Ramp lighting during removal in preparation for demolition.

My beautiful picture

Trenholm State Community College is currently in the process of architecturally re-branding their Patterson Campus. Trenholm State Community College’s Automotive Collision Repair Program was moved from the Trenholm Campus to the Patterson Campus, and in doing so, will utilize an existing 18,727sf metal building/warehouse which was conducive for the collision repair area. Additional square footage was added to the building to encompass two classrooms, a resource room, offices, tool storage, and a paint shop. The paint shop consists of two new pre-fabricated paint booths, mixing station, and prep area A new façade was developed to enhance the overall appearance of the building. This building is the first of many to feature the new architectural style.

Trenholm State Community College’s Administration and Financial Aid Building project included a new metal retrofit roof and the renovation of an existing building that houses administration offices, financial aid and other student amenities as part of there “Student Success” center to allow for additional classrooms. The existing spaces were updated with new finishes and associated energy efficient mechanical, electrical, and plumbing work. A new entrance and sitework were designed to give a good first impression to students and administrators entering campus.

Trenholm State Community College purchased state of the art prefabricated welding booths for their welding program. However, the buildings electrical system could not accommodate the loads for the booths. Goodwyn, Mills and Cawood was hired to prepare the architecture and engineering drawings to allow the program to use their new welding stations.

Building B & Building D were renovations that include interior and exterior work, re-roofing, structural, mechanical, electrical, civil, site work, exterior lighting, new streets, repairs and alterations to existing streets and parking lots, landscaping, and sidewalks.

 

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

 

Rooftop ramp being prepared for demolition.

was hoping to catch smooth new paving. don't use.

This will involve removal of some trees and demolition of the rooftop carpark ramp which was built some time in the late 1990s.

1 2 3 4 6 ••• 75 76