View allAll Photos Tagged progress.
hit the 'depot today and picked up a 10ft rough pine board and screwed it in and i think this is it, folks.
I'd forgotten how nice bottom up shawls are once you get a ways in and the rows get shorter. Still loving the Wollmeise more than a little.
The current City Hall building is a near-50-year-old structure that has served the city well but, in its current state, is functionally obsolete. Built in 1969, the current City Hall requires major renovations that are complicated by the presence of friable asbestos and the way the electrical and mechanical systems were installed.
On October 3, 2017, Virginia Beach city council unanimously approved a resolution to proceed with the design of a new city hall building. The new three-story structure adjacent to the current city hall, between Buildings 1 and 2, is under construction and progressing well.
For more information - www.vbgov.com/government/departments/public-works/Buildin...
Photography - Craig McClure
© 2020
ALL Rights reserved by City of Virginia Beach.
Contact photo[at]vbgov.com for permission to use. Commercial use not allowed.
I thought I would kick off the new year by starting in on one of the chunks of black walnut that came my way during the summer. This is as far as I will take it for now. The next step is to re-coat it with the same wax coating it had six months ago, then wait another six months before finishing the turning.
This part of the grid used larger insulators then the typical poles in the utility. I think the large pylere post insulators were used to protect salt deposits carried by the wind from the nearby ocean.
Located in Wilmington NC (Progress Energy NC) 22.8kv
making some progress. Not sure how big I want to go? www.lelandavestudios.com/2014/03/05/birds-of-a-feather/
today I shaped hind legs a bit more, and trimmed off the jacket - first cut.
I feel more and more confident :) Fresh brushing is off - Poodles had a little play-fight.
just a quick edit of a work in progress... and my SLink boots which I haven't taken off since I got them.
progress on the darkroom, thank you Ruthie for the all the guidance and thank you Bryan for all the hard work. I do not know anything about home remodeling and have learned a lot so far, fish for a person and they eat for a day, teach a person to fish and they will eat fish for three days and then hire someone to fish.
Rida is eventually becoming a Noir clone, I started on her lips. I'm so happy with them, they are so perfect in every way!
I'm working on the piercing today
XT Progress (Xingtong Progress) oil products/chemical tanker passing Ellesmere Port for Stanlow assisted by M.S.C. Volant and M.S.C. Victory
x12 Cargo Pumps @ 300m3/hr
Name: XT Progress
Flag: Panama
IMO: 9500144
MMSI: 355971000
Call sign: HP8055
AIS transponder class: Class A
Detailed vessel type: Oil Products/Chemical Tanker
Gross Tonnage: 11440t
Deadweight: 17427t
Design Draught: 8.92m
Length Overall x Breadth Extreme: 144.2m x 23m
Year Built: 2020
Registered owner: XINGTONG PROGRESS SHIPPING CO
Ship manager/Commercial manager: XINGTONG SHIPPING CO LTD
ISM & Crew Manager: THOME SHIP MANAGEMENT PTE LTD
Shipyard: Zhoushan Qifan Shipbuilding and Repairing Co. LTD, Zhejiang Province, China
Hull number: XS16500-02
Date of build: 07th Apr 2020
Engine: x1 STX Engine Co. MAN B&W 7S35MC 2 stroke 7 cyls @ 170rpm
Engine Power kW: 5180kW
x1 Fixed Pitch Propeller @ 173rpm
x1 Tunnel Bow Thruster @ 368kW
Speed: 14knots