View allAll Photos Tagged progress.

Work in progress shot of the twin horns. Luckily there were 2 brackets with the correct mounting holes, which made the whole process that much easier.

Mon-Fayette Expressway at Cheat Lake Interchange Construction

Interstate 68 and PA/WV 43

Kokosing Construction (http://www.kokosing.biz/default.aspx)

 

Almost home from work I could see in the distance the work lights of the construction crew, putting up the bridge. I happened to have my tripod and TS-E 24mm f/3.5L II.

 

Original Image is over 8MB (Not hosted on Flickr - available upon request)

Model Release available

 

So I start by lightly tracing the face shapes, then carefully painted the faces one by one, usually some will not pass (will not become dolls). I figure if I am going to mess up painting the faces, I might as well mess up first rather than mess up a completed doll ^^;

 

Blush is usually added right at the end :)

Progress shots of Greg Reid and Dane Storrusten as we were building this unique piece of multi-media art for Ruinart, the renowned French champagne house in the Champagne region of Reims. This piece will be exhibited at Art Basel in Miami Beach. After its run there, it travels to New York Museum of Arts and Design where it will go to auction. Proceeds go entirely to emerging artist programs.

Making progress on the driveway, about halfway to the road at the end of day 1 of the storm. The drifts are up to 5 feet. Cheektowaga, NY 11-18-14

Some more industrial stuff - glass, metal, cheap, fast.

Beautiful? - Dunno.

By this time it was strange because a lot of Pollen had fallen (a natural rhyme) which made the roof really slippery.

Punkaholic People Custom for Luna de Queso :D

progress in this case is slow-

 

front piece - all sewn on!

back piece - still laying out on design board

I'm still working on this one.

Depiction of artists and their progression. Or at least, that's how I started out. Blalfhaffadkjaf this sounded/looked good in my head, except when I started doodling blah flowers it started to look kiddy. BLap.

I'm trying to fold ryu zin 3.5 again. God help me:)

Having only just left Rigby Road Depot Blackpool Transports Progress Twin-Car 864+674 stands on Lytham Road, waiting at the traffic lights before crossing the over the main road onto the Promenade.

 

27th October 1984

This locomotive was built by Robert Stephenson & Hawthorn in 1946. It is the last remaining example of a 16 inch inside cylinder locomotive designed by Hawthorn Leslie at Newcastle.

National Coal Mining Museum, 30.6.24.

230kv substation by 500kv rightaway.

Hand lettered print, drawn in ink with a fine liner, work in progress.

Round 2, Day 3 of Wimbledon 2014.

on flower shop. This one will be green in terms of selling locally grown flowers and avoiding non recyclable plastic.

36 done, many many more to go!

To show the lemon creeping onto her backplate and left ear. Otherwise the blackplate is free from yellowing.

I have followed this project at Nigg Bay Aberdeen Scotland for over 2 years now, visiting regularly to capture its progress, I post some of my photos to Flickr for other members interested in construction and shipping to peruse and enjoy.

  

Aberdeen South Harbour 2019.

  

Aberdeen Harbour Expansion Project Approval Announced

Commencement of a £350 million project to expand facilities at Aberdeen Harbour, which was recently granted planning consent in the form of Marine Licenses and a Harbour Revision Order by the Scottish Government, was yesterday sanctioned by Aberdeen Harbour Board. The construction contract with its preferred bidder, Dragados UK is due to be formalised at a signing ceremony today (20th December).

 

“We are delighted that, after six years of detailed planning and extensive consultation with our many stakeholders and the regulatory authorities, we are now in a position to approve commencement of construction”, stated Colin Parker, Chief Executive of Aberdeen Harbour Board.

 

Following a detailed engagement process, Aberdeen Harbour Board, in partnership with Dragados UK, a main contractor, will develop facilities over the next three years that will represent a step change in the marine support capabilities in Scotland. These will transform the port’s ability to accommodate the trend for larger vessels we are witnessing across a whole range of industries.

 

The expansion will afford existing customers the opportunity to diversify and expand their interests, whilst attracting new customers and markets to the port, including up-scaled decommissioning activity, a more significant share of the available cruise vessel fleet and larger more cost-effective commercial vessels”.

 

Alistair Mackenzie, Chairman of Aberdeen Harbour Board added, “Aberdeen Harbour has been in existence for almost 900 years. Its longevity can be attributed to its ability to adapt to changing trading requirements and being forward-thinking in delivering new and improved facilities to support its customers, while at the same time attracting new business.

 

This major new chapter in the port’s history continues this approach and underpins the Trust Port ethos of viewing future generations as key stakeholders. We believe that the infrastructure developed in Nigg Bay will encourage and support the continued prosperity of the city and region that the harbour serves and make a significant national economic contribution”.

 

The development, which is a Scottish Government National Planning Framework (3) Project and is scheduled to be completed by 2020, was welcomed by the Minister for Transport and the Islands, Humza Yousaf, who said: “This is excellent news for Aberdeen and the Scottish maritime industry, as the signing of the construction contract means this nationally significant project can now get underway in earnest.

 

The significant investment will bring jobs and business to Aberdeen, supporting the local and national economy. The historic harbour will be transformed to accommodate larger vessels, opening up potential new revenue streams and offering customers world-class marine support facilities.

 

These are exciting times for Aberdeen Harbour. I wish everyone involved in the project every success and I very much look forward to following the expansion as it progresses.”

 

Dragados UK were named as the Board’s preferred bidder in September this year, and the company announced that they plan to commence construction on site in early 2017.

 

The new facilities will include 1,400 metres of new quay, with a water depth of up to 10.5 metres and will create an additional 125,000 square metres of lay-down area. An independent study, commissioned by Scottish Enterprise, estimates that the development will generate an additional £1 billion per annum to the economy by 2035, and will create an additional 7,000 equivalent jobs.

 

Funding arrangements for the project incorporated commercial borrowing from the European Investment Bank, and funding from the Aberdeen City & Region Deal. Support for the project’s feasibility study was also received from Scottish Enterprise and from the 2013 Annual Programme Call of the European Commission’s Trans-European Transport Network (TEN-T) Programme.

 

Jonathan Taylor, Vice President of the European Investment Bank also commented: “Continued investment at Europe’s leading ports is essential to improve infrastructure and to cater for ever-changing shipping needs. The European Investment Bank is pleased to support the transformational Nigg Bay development that will significantly increase quayside space, allow deep-water access for larger vessels and ensure Aberdeen’s continued strong contribution to the Scottish economy.”

 

A crane gets ready to build a new complex of overpriced condos by Austin's City Hall.

Today's progress - now drying for next additions.

Working out ideas:

www.youtube.com/watch?v=Z6b6fmAXNac

The video is jumpy!!

The Nameplate on Progress at The Tanfield Railway

1 2 ••• 20 21 23 25 26 ••• 79 80