View allAll Photos Tagged phasor

Demolition continues at Station Square Mall at Burnaby's Metrotown. The home of Save-On Foods will be gone, two month shy of their opening day's 25th anniversary...

Close up of the crane dolly for drilling pipe loading.

The Phases of Mercury, captured over 3 eastern apparitions and combined together into a composite image - all taken from my backyard in the UK. The last, and finest crescent, was captured on April 19, 2023. Kuiper Crater is seen as a prominent spot on the left-most images.

 

- Observer: Tom Williams

- Location: Wiltshire, UK. 51N, 2W.

- Date(s): 12-Jan-22, 15-Apr-22, 07-Apr-23, 19-Apr-23.

- Gear: SW400P (16" Goto Dobson), 3x Barlow lens, Atmospheric Dispersion Corrector (ADC), ZWO ASI462MM/C at 8750mm f/21.5. Captured at an image scale of 0.068"/pixel, resized 200%.

FringeNYC 2012 production, photo credit Lotte Marie Allen

 

Maxwell Cramer as Our Man of the World

Elliot Stahl caught this black phase coachwhip near our work site. This was my first time to see a non-traditional color phase. For more information: srelherp.uga.edu/snakes/masfla.htm

Lowestoft Sea Defence.

Demolition continues at Station Square Mall at Burnaby's Metrotown. The home of Save-On Foods will be gone, two month shy of their opening day's 25th anniversary...

Hitman Phase Two Micro Bubbler

 

See more weed porn @

weedporndaily.com

 

Follow the tumblr @

blog.weedporndaily.com

Demolition continues at Station Square Mall at Burnaby's Metrotown. The home of Save-On Foods will be gone, two month shy of their opening day's 25th anniversary...

People playing volleyball in small group at Greenbriar Commons Park. Leica M7, Ilford Delta 100, Ilfosol 3.

A hand phaser on the left and a phaser rifle on the right, both from the 1996 movie Star Trek: First Contact.

 

During the summer of 2019, the traveling exhibit "Star Trek: Exploring New Worlds" exhibit was featured at the Henry Ford Museum in Dearborn, Michigan. This is a photo of one of the Borg items, from the 1996 movie Star Trek: First Contact displays. Taken in August, 2019, near the end of the display's run.

Design, © Japanese Embroidery Centre

 

Tricut beads in black and pewter on black satin

The "south" side of the layout has begun! This section will be next worked on when I've finished building Phase 1, It'll extend the bay platform to 164 studs and the through platforms to 276 studs (ish). It also adds a pop of colour with the flowerbeds and the bus stop sign. I'm considering adding the signals to this section of the layout instead of Phase 4 (station approach) just to add the extra detail but that's a fair bit of wiring I'm still not sure how to do.

1 2 ••• 25 26 28 30 31 ••• 79 80