View allAll Photos Tagged phaser

June 17/22

22-625243

Toronto,

Mixed-use Development,

CIBC Square Phase II,

141 Bay St,

Ivanhoé Cambridge,

Hines,

50s,

Wilkinson Eyre Architects,

Adamson Associates Architect,

This is the other Maestro phaser. My Maestro boards are the original Maestro phaser that Bob Moog designed. This design is the one that replaced it that was designed by Tom Oberheim. This is an OTA phaser, which is Optical Transconductance Amplifier. They have an interesting sound. I played through this one today quite a bit, even though I'm not supposed to be playing. I wanted to make sure this pedal was right before it goes to someone famous. I mostly played my Junior through it. I'm all like, "Yeah, it's OK." I mean, it's nicer than most phasers, but doesn't live up to the Moog design, IMO.

 

Anyway, I pulled out my Gibson SG bass to make sure it wasn't going to break up with a bass signal going through it. I could recalibrate it if that had been the case, but it was fine. Anyway, this thing turned into a whole different animal with a bass plugged into it. No wonder funk players liked this phaser in the 70's. It seems like it may have actually been designed to be a bass phaser. So yeah, now I know something about these. May end up building one to use with my own bass stuff.

phase 1 has come to an end....

fully boned, 1/2" nylon boning

  

Artist - Cody James Photography – Calgary, Alberta.

 

Copyright © Cody James Photography. All rights reserved.

 

Website: www.codyjames.ca

 

May 11, 2021:

21-605342

Toronto

Residential/Commercial

Riverside Square Phase II

677 Queen Street East

Streetcar Developments

14s

Dream Unlimited

RAW Design

Giannone Petricone Associates

Phase 2 of operation "confuse people/look awesome" is complete!

phase-1_03.jpg: The future site of Brookhaven Lab’s newest computing data center alongside Bldg. 515 in September 2008

An abstract photograph of a tulip.

Phases of clinical Trials

Ciel

 

Lac Papineau

Montebello

Quebec

Valery Shpak - weddings and events photographer from New York Film & Digital productions @valeryshpakphotography

June 20, 2021:

21-608057

Toronto,

Mixed-use Development,

"CIBC Square Phase II (141 Bay St, Ivanhoé Cambridge, Hines, 50s, Wilkinson Eyre Architects, Adamson Associates Architects)"

Brilliant exhibit at Light Night 2013

My Shin after an hour today

 

(12th Hour)

 

Done by Carl Zambra, Body Art Studios, Dudley, UK.

When multiple unconnected objects are present, the phase unwrapping algorithm sometimes gets confused.

Marine Drive Residence behind the Rock Jetty. Distance is probably under 600 metres from the Site. The five-floor Building 2 of Phase one is in front of the protruding tower is less than 200 metres from the water at the highest of tides.

1 2 ••• 44 45 47 49 50 ••• 79 80