View allAll Photos Tagged phaser

Single Phase Bench Polishing Machine Manufacturer Rajkot Gujarat Bharat INDIA (HMP, Ramato, Roent)

Bought a D6B engine (130hp) from a guy in Auckland.

With the engine stuck in the North Island, there was nothing to do in the meantime but cosmetics:

Converted car to Phase 2 lights.

right before our pride kickoff bbq. we rock hard.

led screen graphics free download led screen graphics free download by Videek Led Screen Rental Services in india 9891478601 www.videek.in

 

Balloon decor idea for birthday party 9891478005 www.videek.in

 

dj Videek Stage Craft Pvt. Ltd. www.videek.in

 

Follow the VIDEEK Stage Craft By D.G. EVENT .in channel on WhatsApp: whatsapp.com/channel/0029VaBMjpmGzzKPVq0hOK0z

Radisson Hotel Gurugram Udyog Vihar

Address: Plot No. 406, Udyog Vihar Phase 3 Rd, Udyog Vihar III, Sector 20, Gurugram, Haryana 122016

Phone: 09891478067

 

Event industry blog for indian wedding and birthday event event-videek.blogspot.com/

 

Best budget dj light sound system in gurgaon event-videek.blogspot.com/2014/11/best-dj-in-gurgaon-dj-i...

Rahul dj light sound rahuldj.in/

Wedding wire www.weddingwire.in/wedding-dj/videek-stage-craft-pvt-ltd-...

 

Best dj for corporate event in.linkedin.com/in/dj-videek-rao-7017a04b?trk=public_post...

 

DG EVENT www.instagram.com/dgevent/

 

dg event www.dgevent.in

 

Dj Videek DJ Light Sound System Gurgaon Delhi www.youtube.com/DgeventIn

 

Dj-Videek Vikram Yadav (DJ Videek Rao) www.facebook.com/dgevent/

 

Best dj sounds light led wall n stage system with sharpie light effects for wedding www.youtube.com/watch?v=tYzlol1kTN0&list=PLVcYO3MM8K-...

 

event industry whatsapp channel whatsapp.com/channel/0029VaBMjpmGzzKPVq0hOK0z

 

dj Event www.djevent.in

 

Best event Photography www.flickr.com/photos/193845755@N03/albums/

May 17, 2018:.

18-534186.

Toronto

The Kip District

Residential

The Kip District: Phase 1

20 Thomas Riley Rd

Concert Properties

28s

Page + Steele / IBI Group Architects

April 30/ 25

25-679543

Toronto

CIBC Square Phase II

Public Park/Mixed-use Area

Office/Commercial

141 Bay St

Ivanhoé Cambridge

Hines

50s

Wilkinson Eyre Architects

Adamson Associates Architects

October 05/24

24-670323

Toronto

CIBC Square Phase II

Public Park/Mixed-use Area

Office/Commercial

141 Bay St

Ivanhoé Cambridge

Hines

50s

Wilkinson Eyre Architects

Adamson Associates Architects

The tryptich as I originally envisioned it. Finally got it aligned correctly in Painter X.

View On Black

April 30/ 25

25-679540

Toronto

CIBC Square Phase II

Public Park/Mixed-use Area

Office/Commercial

141 Bay St

Ivanhoé Cambridge

Hines

50s

Wilkinson Eyre Architects

Adamson Associates Architects

Unser Buch zu "PHASE 0 - How to make some action" ist aus der Druckerei angekommen...

Phase I: RED

Phase II: BLUE

Phase III: YELLOW

Phases & Faces show by David Stehman, April 2012

April 19/ 25

25-678957

Toronto

CIBC Square Phase II

Public Park/Mixed-use Area

Office/Commercial

141 Bay St

Ivanhoé Cambridge

Hines

50s

Wilkinson Eyre Architects

Adamson Associates Architects

Mabel finds a cozy corner

Alec Longstreth

PHASE 7

208 pages,17,7cm x 21,5cm

intérieur noir & blanc couverture souple quadri

novembre 2008

17,50 Euros

isbn : 978-2-930360-24-9

October 05/24

24-670381

Toronto

Bridges

CIBC Square Phase II

Public Park/Mixed-use Area

Office/Commercial

141 Bay St

Ivanhoé Cambridge

Hines

50s

Wilkinson Eyre Architects

Adamson Associates Architects

Walkway Bridge Over Yonge St

Phase descendante d'un CB le soir du 1er Mai 2017 à Sart-Dames-Avelines en BW.

Further to the west on the spit are the buildings of the second phase. The most distinctive structures built during this phase were the two Vibration Test Buildings, now commonly referred to as ‘The Pagodas’ (National Trust buildings E2 and E3). The specification for the Vibration Test Buildings included the ability to withstand the accidental detonation of 400lbs (181.4kg) of high explosives; they were designed by G W Dixon ARIBA for the UK Atomic Energy Authority and are identical. Both Vibration Test Buildings, their control room and centrifuge were constructed in 1960.

 

They comprise a large reinforced concrete central cell 16.47m (54ft) by 7.30m (24ft) covered by a massive reinforced concrete roof supported on sixteen reinforced concrete columns. To the south and east of the main chambers are self-contained plant rooms. The main access to the building is from the south through an entrance passage which was originally sealed by a pair of outward opening metal covered wooden doors. On its western side, adjacent to the main entrance passage is a blocked doorway that led to a small staff room and toilet. Inside the buildings on the eastern side of the passageway one set of stairs gives access down to the main test cell and another to a walkway around the top of the chamber. At the end of the passageway is a lift pit, which allowed test pieces to be lowered on to the floor of the main test cell. To assist in manoeuvring heavy objects there are a number of substantial steel eyelets screwed into the underside of the roof. A travelling crane also ran on rails mounted on a ledge beneath the windows, a loose plate on the floor recorded ‘Becker twin Lift Maximum Working Load 40 tons serial A-2647-2’.

 

The floor of the main cell is formed of parallel and narrowly spaced steel ‘I’ section beams for test rigs to be firmly secured to the structure. To either side are cable ducts. At the same time as being vibrated objects might also be placed in jackets to simulate extremes of heat and cold, or in a portable altitude chamber to mimic the effects of altitudinal changes. Set into the north wall are seven steel plates with vertical cruciform slots that were also used for securing tests rigs or monitoring equipment. Below these are eight pipes opening from the service passageway to the north. In the south wall are three steel plates with horizontal slots, above the plate is stencilled 1-27ft and below it 1-7.5m. The walkway around three sides of the cell was originally protected by a handrail and there is another handrail fixed to the main wall. Running around the wall is a cable conduit and attached to the wall are various pipes for carrying electrical wires, switches, junction boxes and pressure gauges. Signs on the wall above the lift pit record ‘Telephone Instrument Room’, ‘Vac Pump Running, Vac Pump Stopped’ with associated light fittings. At the north east corner of the cell is a doorway to the rear service passage running east to west along the north side of the building. To the east a flight of stairs gives access to the eastern plant room. To the west another set of stairs provides access to the northern side of the lift pit, the upper walkway and to an emergency escape passage through the north side of the traverse. To the south of the main cell are free-standing Burwell brick-built plant rooms. The main plant room is entered through two sets of double doors on its south side, internally are four machinery mounting plinths. Attached to its west wall is a metal cabinet that probably housed equipment to operate the hydraulic compressor for the internal lift. At the eastern end of the building is a store room with a blocked doorway to the south.

 

Sefton Park firework display

1 2 ••• 74 75 76 77 78 80