View allAll Photos Tagged phaser
November 18, 2016:.
.
Toronto
The Kip District
Residential
The Kip District: Phase 1
20 Thomas Riley Rd
Concert Properties
28s
Page + Steele / IBI Group Architects
April 03, 2011:
IMG_36351
Toronto,
Residential Development,
"Village Gate West Phase 3a + 3b (5145 Dundas Street West, Concert Properties, 20s + 24s, Page + Steele / IBI Group Architects)"
Mountain painted with Chormium Oxide Green and Quinacridone Violet. Those pigments for both the ground cover and the bushes. Keeping in mind that is should be paler (atmospheric perspective) and the details should be kept to a minimum and not as clearly delineated.
Started building color mainly in the pink/orange field with thicker color. Al;so some in the immediate foreground, modifying my mix more toward yellow-orange (Naples and Cad. Org.).
The Phthalo Blue tone on the board can still be seen in the buildings, especially at the right.
If you're interested, stay tuned, more to come!
A phase 1 desk study's primary purpose is to detect possible dangers and a lack of safety measures on the construction site. The Phase 1 desk study yields a comprehensive report which details every aspect of the research process. Each phase 1 desk research report includes a walkover survey of the site. Site examination built with existing data on the site's ecology, geology, hydrogeology, and mining frameworks. To learn more, visit: www.earthenvironmental.co.uk/phase-1-desk-study/.