View allAll Photos Tagged phaser
brickwork is done. j wasn't happy with it. may have said that he could have done just as well and he's not a professional. BUT IT'S DONE!!!
when i left for work, the guy there was tearing down old tyvek. i don't know what i will come home to. siding? flashing on the roof? soffits? it'll be a bit surprise.
j is supervising today because i did not want to be responsible for work that was not done to J's expectations.
my FIL is also there to make sure that J doesn't pummel someone.
good times.
The walls are up, but now crews are going to work on tacking the task of making Lava Heights Academy a home. In just a matter of months, these will be buildings of academics, performance, and healing.
The Paseo de las Iglesias Phase 1 project has 3 main goals per the Bond: River Park, Ecosystem Restoration and Erosion Protection. Below is a summary of each of the final amenities in each category to be constructed onsite.
The project will provide river park pathway and amenities including 2.7 miles of paved pathway (16’ wide), 2.2 miles of DG pathway (8’ wide) and 10,305 new trees, shrubs and cacti irrigated using permanent irrigation, temporary irrigation and Dri-water irrigation methods. The water sources will be reclaimed water. With the construction of Paseo de las Iglesias the Loop will have an 8 mile continuous section on the Santa Cruz River. Amenities will also include 3 parking areas; the west side paved parking area with restroom, ramada and seating, east side paved parking and ramada, and west side equestrian staging area with dirt parking and mounting block.
The project will provide ecosystem restoration element including a plant pallet comprised of native species local to this part of the Santa Cruz but also sustainable for current conditions, water harvesting basins, preserve in place areas for vegetation and habitat, and special habitat structures like lizard habitat and raptor perches. Additionally, Lizard and amphibian salvage to be performed by RFCD though subcontract to Dr. Rosen at U of A. RFCD contracted with Dr. Rosen to collect and monitor lizards in a fenced off area off Cottonwood Lane south of the Community Garden. The fence has been constructed by Dr. Rosen and lizard catching is in progress. Other amphibians will also be salvaged for later release. This will be treated as a do not disturb area during construction. The focus of the restoration work will be improvement to Mesquite Circle Pond which is home to 9 unique and special interest native species and one of the jewels of urban Tucson herpetological community.
The project will provide erosion protection including 1.4 miles of new soil cement bank protection, 0.4 miles of gabion bank protection, and additional methods such as rip rap, rock plating and terracing.
In addition to the decorative elements designed by the landscape architect there will be Public Art elements. With the assistance of the Tucson Pima Arts Council, we selected public artist Andy Dufford. He has been working on an entry monument and ramada for the project site. We have also been working with Las Artes, a local Arts and Education center, on a tile mural at the restroom.
During the design process our individual Section 404 permit was obtained from the Army Corps of Engineers, cultural resources mitigation was performed and letter of clearance issued from SHPO, Intergovernmental Agreement obtained with from the City of Tucson regarding property within the project area and permits with ADOT applied for. A cultural resources/archeological Phase I, Class III study was completed. The study was conducted to the current standard and determined the extent of archeological resources on site. Based on the results from the study a mitigation plan was created to determine and plan for the extent of the impacts of the project and the necessary remediation. Additionally, a goal of the project is to create signage for a segment the proposed pathway to represent the Juan Bautista de Anza National Historic Trail along the west bank of the Santa Cruz River that commemorates the 1775-1776 expedition and the historic Paseo de las Iglesias Trail.
We can supply single phase motors to directly replace your existing units, whether it is to replace damaged a motor or to convert your existing three phase motor to a single phase motor.
With access to a large range of stock we are able to despatch most motors for same day delivery to you the next day to ensure minimal downtime.
Shop Single Phase Motors
Contact Us:01274 288777 sales@mmengservices.co.uk
I can't remember if this is coat 1, 2 or 3. Yes, three coats of paint! Used an Earth Elements Brilliant Metals paint, which is expensive and a bit tricky to work with.
For Desmonds old school skater costume I decided to make an oak copy of our red plastic banana board. Got a plank at the lumberyard for 11 bucks and went to work. I traced the old board to get the shape and cut it out with my jigsaw. Sand it down, drill it and remount the old hardware. I have a sweet dogtown style paint job for it, gonna represent R/F though.
Taken for the Scavenger Hunt, through a window
This is one of my favourite shops, I love their clothes, though I can't afford to buy many. Today there was a gorgeous blue party dress in the window and a red evening gown hanging inside the shop..
Since 1999 Stephen Cartwright has been recording the time of sunrise and sunset at his location. The 365 chimes in each set are cut to length based on the length of day at his location over a one year period. Changing latitudes, longitudes, elevations, time zones and seasons alter the local time of sunrise and sunset. Any deviation from a simple sine-like curve in the chimes indicates that there was a change in position on the surface of the Earth. The erratic nature of the 2003 chime set results from a year of almost continuous travel by bicycle and other means.
24 x 10 x 3 ft
The lastest version on the older style network map updated for the St. Werburgh's Road extension that opened on 07/07/11.