View allAll Photos Tagged electrifying

Paul Gaskell kindly gave this photo for publication.

 

On Monday 14 December 2015 the All Stations Liverpool Lime Street to Warrington Bank Quay via Huyton and Earlestown went electric, nearly putting a tin hat on Phase 2 of the NW Electrification Scheme, with finishing Allerton Depot Phase 3, Roby-Huyton 4th track and two footbridge guards the only things left to do.

 

On the first day of the Bank Quay electric service a Northern Electrics Class 319 approaches Earlestown from the west.

 

Taken from the southern end of Platform 3.

 

Copyright Paul D Gaskell 2015

Was passiert, wenn ein Designer und seine Frau auf ein junges Winzer-Pärchen treffen? Genau großartiges! Uns so präsentieren wir voller Stolz unsere neue Weinline: „Electrified“

www.electrified-wine.com

 

Außen überzeigen die Weine mit einem monstermäßig coolen Design. Was haben die drei Kandidaten „White Lightning“, „Mailas Legacy“ und „Blood Count“ gemeinsam? Es handelt sich nicht um ein Produkt, dass nur mit seinem Äußeren punkten kann. Es handelt sich um hervorragende, deutsche Qualitätsweine, die mit viel Liebe, Leidenschaft und einer ordentlichen Portion Geschick für das Winzer*innen Handwerk hergestellt wurden und einfach elektrisierend wirkt.

 

Jeder Wein hat seine eigene kleine Geschichte zu erzählen, die ihr gern in der Weinbeschreibung auf unserer Website nachlesen könnt.

Wrinkley kindly sent this photograph for publication.

 

Murphy have subcontracted this firm to do the piles at Lostock.

 

Copyright Wrinkley 2018.

Was passiert, wenn ein Designer und seine Frau auf ein junges Winzer-Pärchen treffen? Genau großartiges! Uns so präsentieren wir voller Stolz unsere neue Weinline: „Electrified“

www.electrified-wine.com

 

Außen überzeigen die Weine mit einem monstermäßig coolen Design. Was haben die drei Kandidaten „White Lightning“, „Mailas Legacy“ und „Blood Count“ gemeinsam? Es handelt sich nicht um ein Produkt, dass nur mit seinem Äußeren punkten kann. Es handelt sich um hervorragende, deutsche Qualitätsweine, die mit viel Liebe, Leidenschaft und einer ordentlichen Portion Geschick für das Winzer*innen Handwerk hergestellt wurden und einfach elektrisierend wirkt.

 

Jeder Wein hat seine eigene kleine Geschichte zu erzählen, die ihr gern in der Weinbeschreibung auf unserer Website nachlesen könnt.

The electrification equivalent of a green shoot.

 

One of several marker posts to show where a mast will go.

 

I believe:

MG/39/14 is the number of the mast, in the format MG = route (Manchester to the WCML), 39 is Section 39 in that route, 14 is mast 14 in that section.

39.4020 is the distance in km from a known "datum point" at Man Vic

RECO: 7.5m=depth the base is to be driven or dug into the ground

Down line=northbound (in this instance) on the Bolton to Euxton Junction Line

 

This is rather posher than their equivalents on the Liverpool-Manchester scheme, which I never saw adorned with a label.

 

This stake is behind the northbound (Down) platform.

Overhead wiring along the single track headshunt now appears to be attached to new masts along its whole length.

 

The new mast is paler than the 1960s gantry, to which the new wires are not connected.

 

The track furthest from camera is the headshunt. The track between it and my train is the bi-directional 3rd rail electrified Merseyrail line to Hunts Cross. It also has 25kV overhead.

 

Taken from a Lime Street to Manchester Oxford Road stopper, looking north.

Wrinkley kindly sent this photograph for publication.

 

Wrinkley added: "There are now four TTCs and three masts covering platforms 1 and 2."

 

Copyright Wrinkley 2018.

Paul Gaskell kindly sent this photo for publication.

 

Whilst the last phase of Huyton Junction re-quadrupling was taking place services from Wigan to Lime Street were terminating at St Helens Central, with rail replacement buses on to Lime St and stations between. The trains reversed at St Helens, forming northbound services. This entailed using the station's trailing crossover, which had not long been electrified for this eventuality. That crossover is otherwise little used and never normally used by passenger services.

 

This sequence of shots runs through the track and signalling work needed to perform these manoeuvres.

 

The bustitution involved a significant adjustment to road traffic, with the north car park given over to buses.

 

Copyright Paul D Gaskell 2017.

The Ince Moss Chord (ELR = IMG) is a sharply curved, bi-directional single track which joins the Huyton to Wigan line to the West Coast Main Line.

 

The chord meets the Huyton to Wigan 'Lancashire Union Line' (ELR = SBH3) at Ince Moss Junction and the WCML here at Bamfurlong Sidings Junction.

 

The three lines, the two junctions mentioned above and Springs Branch Junction form a triangle

 

As part of the current electrification works the chord has been relaid and resignalled. It was double track, as is implied by the sign to the right of shot and on Google Earth. As always, the complicated layout is clearly displayed in 'Railway Track Diagrams, Midlands and North West' where it appears in Section 27A.

 

This shot is taken a couple of hundred yards from Photo 3162s, further north along the chord, looking past the signal protecting the junction. The lines coming in from the left are the Up and Down Goods Lines. The Up and Down Fast are beyond the junction, as will be seen in following photos.

 

The second mast from camera marks the current limit of electrification on the chord, the last 100 yards or so to the junction are unwired. Note the heritage (c1974) masts to the left of the single track. As has happened elsewhere - notably Earlestown east and Wavertree - these have not been incorporated into the new setup. In this case the general tendency to ignore the old metalwork is exacerbated by the fact that the old masts are in the wrong positions for the singled track.

 

Taken through the pallisade fence which separates the tracks from the public footpath which follows the chord for some distance, looking southeast.

Tricky1 kindly sent this photograph for publication.

 

The current state of play at Lostock, looking north.

 

Copyright Tricky1 2018.

Wrinkey kindly sent this photo for publication.

 

More bases have been installed over the past two weeks. Only two are missing near the bridge.

 

Here's one recent one.

 

Copyright Wrinkley 2017

Paul Gaskell kindly gave this photo for publication.

 

On Monday 14 December 2015 the All Stations Liverpool Lime Street to Warrington Bank Quay via Huyton and Earlestown went electric, nearly putting a tin hat on Phase 2 of the NW Electrification Scheme, with finishing Allerton Depot Phase 3, Roby-Huyton 4th track and two footbridge guards the only things left to do.

 

On the first day of the Bank Quay electric service a Northern Electrics Class 319 calls at Earlestown from the west.

 

Taken from the southern end of Platform 3.

 

Copyright Paul D Gaskell 2015

"May 25th. Henry Van electrifying -- Mrs. Van, Diana, Harry, Isabella, Mum, and HGS. Dynes Hall."

LNW-GW Joint kindly sent this photo for publication.

 

Piles of piles piled at Fylde Junction, near Preston.

 

Copyright LNW-GW Joint 2017

Return wires seen in the previous shots of Singleton Bank extend under the M55 then under this bridge.

A reminder of one of the many reasons the Bolton Line electrification has taken extra time and money - the massive concrete structure immediately beyond the bridge had to be devised and built in short order following a burst water main.

Made from 14 light frames by Starry Landscape Stacker 1.8.0.

 

Not very happy, but I´m not a professional!!😀, so, here it is, take a look into the isolators from the electrical post, very nice light! I was trying to get some meteors from last night, but, because the high humidity, and high clouds, not possible.

pimperzeugnis aus frühen jahren (2007)

Wrinkley kindly sent this photo for publication.

 

Work on Platform 5 continues

 

Copyright Wrinkley 2017

Electrified border fence on the Indian side of India-Pakistan border near the Wagah border crossing, Punjab, India.

Phil Wieland kindly supplied this photo for publication.

 

This 'then' shot shows the station before any electrification work started.

 

Copyright Phil Wieland 2014

Joe Callaghan kindly sent this photo for publication.

 

Joe added:

 

'Last night just before midnight this large crane was brought in for work in the early hours of Sunday morning. It was gone when I looked out about 6 am.

 

I don't know what he was lifting into or out of the cutting.'

 

Joe took this from private property with the owner's permission.

 

Copyright Joe Callaghan 2015

Was passiert, wenn ein Designer und seine Frau auf ein junges Winzer-Pärchen treffen? Genau großartiges! Uns so präsentieren wir voller Stolz unsere neue Weinline: „Electrified“

www.electrified-wine.com

 

Außen überzeigen die Weine mit einem monstermäßig coolen Design. Was haben die drei Kandidaten „White Lightning“, „Mailas Legacy“ und „Blood Count“ gemeinsam? Es handelt sich nicht um ein Produkt, dass nur mit seinem Äußeren punkten kann. Es handelt sich um hervorragende, deutsche Qualitätsweine, die mit viel Liebe, Leidenschaft und einer ordentlichen Portion Geschick für das Winzer*innen Handwerk hergestellt wurden und einfach elektrisierend wirkt.

 

Jeder Wein hat seine eigene kleine Geschichte zu erzählen, die ihr gern in der Weinbeschreibung auf unserer Website nachlesen könnt.

Graham Howarth kindly gave this photo for publication.

 

A train for Preston passes Salwick signalbox heading towards the camera.

 

No sign of any electrification works yet. Graham took this shot from Bridge 12 which was rebuilt as preliminary work.

 

Copyright Graham A Howarth 2016.

  

Northern 156 420 heads north for Bolton, Preston and Blackpool North.

 

The stone train to the left in this view will form a train such as the one shown in Series 4392 Salford Freight.

 

Are the distant Orangemen working on electrification business?

 

Taken from Park House Bridge Road bridge, looking towards Manchester.

The Ince Moss Chord (ELR = IMG) is a sharply curved, bi-directional single track which joins the Huyton to Wigan line to the West Coast Main Line.

 

The chord meets the Huyton to Wigan 'Lancashire Union Line' (ELR = SBH3) at Ince Moss Junction and the WCML here at Bamfurlong Sidings Junction.

 

The three lines, the two junctions mentioned above and Springs Branch Junction form a triangle

 

As part of the current electrification works the chord has been relaid and resignalled. It was double track, as is implied by Google Earth. As always, the complicated layout is clearly displayed in 'Railway Track Diagrams, Midlands and North West' where it appears in Section 27A.

 

The lines coming in from the left are the Up and Down Goods Lines. The Up and Down Fast are beyond the junction, as implied by the pair of Virgin Voyagers hurrying south (left to right).

 

The wiring on the chord now appears complete, unlike in photos in the 3162 series where the last 100 yards to the junction remained unwired.

 

Taken through the pallisade fence which separates the tracks from the public footpath which follows the chord for some distance, looking southeast.

This earth wire stretches from the southern end of Platform 4 almost to the road bridge.

Graham Howarth kindly gave this photo for publication.

 

We believe the location from which we took this shot is legal and safe, though it definitely warrants stout footwear, preferably wellies. At no time did we pass any signs, or breach the railway's admirably complete pallisade fencing.

 

This is on teh Bolton side of Euxton Junction.

 

A new mast base in close up

 

Taken from within the Vee of Euxton Junction, but clearly outside NR's perimeter.

 

Copyright Graham A Howarth 2016.

Wrinkley kindly sent this photo for publication.

 

He added this note to this batch of eighteen pictures:

 

"The Bolton-bound (southbound) track has been relaid south from the junction to about 100 metres beyond Beaumont Road, one photo shows the temporary joint between old and new track.

 

Looking at my photos today and some poor quality Google Earth satellite imagery from 2000, 2005 and 2013, the distance between the track centre has increased from about 4.5 metres to 6.7 metres. Maybe this explains the big pile of spoil which appeared then disappeared from the side of the bridge. The dirt road by the north side of the track must have been moved further north.

 

The ballast train was stopped at the junction when I arrived, but it made two runs to drop the ballast while I was there. The possession end at 5.15 am tomorrow (Monday)."

 

Copyright Wrinkey 2016.

Joe Callaghan kindly sent this photo for publication.

 

Joe added:

 

'Last night just before midnight this large crane was brought in for work in the early hours of Sunday morning. It was gone when I looked out about 6 am.

 

I don't know what he was lifting into or out of the cutting.'

 

Joe took this from private property with the owner's permission.

 

Copyright Joe Callaghan 2015

All Photos ©Anna Aaron

Press "L" to view.

 

Twitter: Photoschmoto

Instagram: Photoschmoto

Facebook: Anna Aaron Photography-Photoschmoto

Hard graft in Roby Platform 4 liftshaft.

 

Taken from the lift doorway, looking down.

ALX400 kindly sent this photo for publication.

 

66601 stands with a rake of empties near a big gap in the railway to enable lowering the Chapel Street public subway to take place. The separate station subway will be handled separately by being given a "direct-fastened deck".

 

Copyright ALX400 2016

A rather splendid (I think!) map of the electrified routes of the Southern Railway and British Rail Southern Region routes from 1985. Picked up for £2 at a table sale.....

Codville kindly sent this photo for publication.

 

Some site clearance has taken place in advance of electrification and related work.

 

Copyright Codville 2016

A Phooltas UTV with masts laden wagon, waiting for its next round of mast erection on Rajpura-Patiala-Bathinda section.

Paul D Gaskell has kindly sent this photo for publication.

 

Yesterday we published photos of two wires being installed here. The work continued overnight so that there are now four wires up and hanging.

 

Paul took this from Standish Street bridge looking south, with St Helens Central's iconic sloping roof visible upper centre right.

 

Copyright Paul D Gaskell 2015

Back to Dorridge Station in the rain.

 

I had hoped for it to be drier in Dorridge, but was a bit too wet. Did find a park before I headed back to the station.

  

The London Midland service to Dorridge terminates at platform 3. While Chiltern Railways uses platforms 1 and 2 (not all trains stop there). On a Sunday's, the London Midland service to / from Dorridge is one per hour.

  

The station was built by the Great Western Railway in 1852, on their line from Birmingham to Oxford. In the past, the station was known as Knowle and Dorridge, as it also serves the nearby village of Knowle. Prior to electrification of the former LMS line from London Euston to Birmingham New Street the former GWR London Paddington - Birkenhead Woodside trains passed through the station but did not stop.

 

The station was renamed from Knowle to Dorridge on 6 May 1974.

  

distant footbridge and level crossing at Mill Lane.

 

For some reason the view from the station, the tracks seem to curve around.

1 2 ••• 23 24 26 28 29 ••• 79 80