View allAll Photos Tagged constructionwork
Nederland, Noord-Holland, Gemeente Schoorl, 11-12-2013; Camperduin, Hondsbossche en Pettemer Zeewering. Details van de bekleding van de dijk: steen en asfalt (bitumen) aan de zeezijde, het buitentalud, gras en klei voor de landzijde.
Hondsbossche and Pettemer seawall seen to the north
The dike was built as a seawall after the primal dunes were washed away.
Details of the lining of the dike: concrete and asphalt (bitumen) on the seaward side, the outer slope, grass and clay on the land side.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
I learned that the garden is being transformed in a major way for a special event taking place next month. A dance floor is being built over the pool! (Or maybe the guard was pulling my leg, but it does look like they are building a floor over the pool.)
Nederland, Noord-Holland, Gemeente Wieringen, 28-04-2010; Afsluitdijk ter hoogte van het Monument, de plaats waar in 1932 De Vlieter, het laatste gat, werd gesloten.
Enclosure Dam at the height of the Monument, where in 1932 the Vlieter, the last opening, was closed.
luchtfoto (toeslag), aerial photo (additional fee required)
foto/photo Siebe Swart
The Indonesian Tsunami was tragic and devastating for the people of Indonesia. Hundreds of thousands of people were killed and millions were left homeless.
Minhaj Welfare Foundation (MWF) offered their services and facilities and helped with the construction of new buildings as well as providing water, food, clothes and shelter for those who lost everything.
Work starts on the construction of a new town pond and revamping the top of the High Street, Watford.
in Gulshan-e-Iqbal (large residential and commercial neighbourhood) construction of the biggest Hotel in this area with 34 floors.
"Citygate"--Errichtung von Wohnhäusern, Büros und Shoppingcenter an der Wagramer Straße neben der U1-Station Aderklaaer Straße, Wien.--12012015
"Citygate"-building site in northeast suburb in vienna, austria.--12012015
The area around my apartment has been effectively a building site for three or four years and I am really pleased by the fact the majority of projects will be completed by the end of this year.
The major project with the biggest impact on my living environment is the Luas Cross City project but the good news for me is that the working date for opening the new route to passengers is December 9th/10th. Of course I do not know if the service it self will have unexpected negative social impacts but I am hoping that if there are any they will be more than compensated for by the positives. It would appear that property prices are increasing but as I do not wish to move this is not really relevant to me [except for an increase in property tax]
There will be two tram stops on O’Connell Street.
The GPO Stop will be located within the median of O’Connell Street Lower, north of Middle Abbey Street and will be conveniently located to provide interchange with the Luas Red Line at the Abbey Street stop. This is an important description because it contains a bit of information that might surprise some people. The common belief is that the purpose of the Cross-City was to connect the Red Line and the Green Line services but this is not actually true from a service point of view because users will need to interchange between the lines near the GPO
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt und sind inzwischen abgeschlossen; jetzt ist die Gegenrichtung dran.
Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
Inzwischen gibt es Veröffentlichungen, die als Endtermin für die Bauarbeiten das Frühjahr 2015 bzw. September 2015 nennen. Mal sehen was dann stimmt!
This used to be a pretty nice shopping mall. I guess the owners weren't satisfied, so they are going to make it even nicer. It is supposed to be done before the Christmas season begins. I don't know if I'll be down here for that.
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt und sind inzwischen abgeschlossen; jetzt ist die Gegenrichtung dran.
Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
Inzwischen gibt es Veröffentlichungen, die als Endtermin für die Bauarbeiten das Frühjahr 2015 bzw. September 2015 nennen. Mal sehen was dann stimmt!
A couple of the bought up and condemned terrace houses in Werneth. Look at another person holding out against the CPO - wont be long now until they are compulsory purchased. Photo taken on Edward Street in Werneth, Oldham.
Nederland, Noord-Holland, Gemeente Schoorl, 11-12-2013; Camperduin, Hondsbossche en Pettemer Zeewering. Details van de bekleding van de dijk: steen en asfalt (bitumen) aan de zeezijde, het buitentalud, gras en klei voor de landzijde.
Hondsbossche and Pettemer seawall seen to the north
The dike was built as a seawall after the primal dunes were washed away.
Details of the lining of the dike: concrete and asphalt (bitumen) on the seaward side, the outer slope, grass and clay on the land side.
luchtfoto (toeslag op standard tarieven);
aerial photo (additional fee required);
copyright foto/photo Siebe Swart
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt und sind inzwischen abgeschlossen; jetzt ist die Gegenrichtung dran.
Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
I Geo-Tagged these photographs so that you can identified where I visited. My photographs show a very narrow road that one needs to walk from Laughanstown Tram Stop to get to the old church and graveyard at Tully. As you can see from my photographs some people are are using the area as a rubbish dump. There are signs of extensive construction work under way in the area but some elements have the appearance of a stalled project.
If you visit this road take care as there is a surprising amount of traffic.
Laughanstown: The spelling of this name has varied considerably over time, and in some periods was almost indistinguishable from Loughlinstown, the name of which also varied. The spelling Laughanstown was adopted and fixed at the
time of the original Ordnance Survey in the 1830s. However, the evidence suggests that the name used locally was Lehaunstown, and this was noted by the Boundary Survey in the 1820s. Local usage did not change as a result
of the Ordnance Survey’s attempt to impose a new spelling.
A view of Interstate 12 construction work from the banks of the Amite River. The Amite River bridge is being replaced by a newer, wider and taller structure as the I-12 travel lanes are widened to six lanes.
©Louisiana DOTD/Owen Murphy
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt. Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
"Citygate"--Errichtung von Wohnhäusern, Büros und Shoppingcenter an der Wagramer Straße neben der U1-Station Aderklaaer Straße, Wien.--12012015
"Citygate"-building site in northeast suburb in vienna, austria.--12012015
The area around my apartment has been effectively a building site for three or four years and I am really pleased by the fact the majority of projects will be completed by the end of this year.
The major project with the biggest impact on my living environment is the Luas Cross City project but the good news for me is that the working date for opening the new route to passengers is December 9th/10th. Of course I do not know if the service it self will have unexpected negative social impacts but I am hoping that if there are any they will be more than compensated for by the positives. It would appear that property prices are increasing but as I do not wish to move this is not really relevant to me [except for an increase in property tax]
There will be two tram stops on O’Connell Street.
The GPO Stop will be located within the median of O’Connell Street Lower, north of Middle Abbey Street and will be conveniently located to provide interchange with the Luas Red Line at the Abbey Street stop. This is an important description because it contains a bit of information that might surprise some people. The common belief is that the purpose of the Cross-City was to connect the Red Line and the Green Line services but this is not actually true from a service point of view because users will need to interchange between the lines near the GPO
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt und sind inzwischen abgeschlossen; jetzt ist die Gegenrichtung dran.
Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
Work at Range Avenue. A heavy crane lifts a pile driving assembly into position.
©Louisiana DOTD/Owen Murphy
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt. Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
Rona Crayton of James Construction Group surveys the work site. James is leading a design-build team that is widening I-12 to six lanes between O'Neal Lane and Pete's Highway.
©Louisiana DOTD/Owen Murphy
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt. Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt. Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
Concrete girders destined for the Amite River bridge construction site on Interstate 12.
©Louisiana DOTD/Owen Murphy
All photographs in my photostream are Copyrighted © Dave Kirwin. All Rights Reserved.
| Flickr Photos | Flickr Railway Photos | Flickr Graffiti | Instagram | Facebook | #eastleighsocialphotographer
-----------
Battersea power station
All photographs in my photostream are Copyrighted © Dave Kirwin. All Rights Reserved.
| Flickr Photos | Flickr Railway Photos | Instagram | #eastleighsocialphotographer
-----------
Underground Northern Line Extension (NLE). Nine Elms station.
Previous:
31/08/17
www.flickr.com/photos/davekirwin/37120568315/in/album-721...
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt und sind inzwischen abgeschlossen; jetzt ist die Gegenrichtung dran.
Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.
Inzwischen gibt es Veröffentlichungen, die als Endtermin für die Bauarbeiten das Frühjahr 2015 bzw. September 2015 nennen. Mal sehen was dann stimmt!
OLYMPUS DIGITAL CAMERA
Bauarbeiten am S-Bhf. Yorckstraße (Großgörschenstraße) - S1 - für den Austauschen der alten Brücken des Gleises Richtung Wannsee / Potsdam finden bereits seit vielen Monaten statt. Vor ein paar Monaten wurde endlich ein Baustellenschild aufgestellt und ein Ende der Bauarbeiten tatsächlich für den 20.12.2014 (!) angekündigt. Lassen wir uns überraschen mit wie viel Verspätung dieses Bauprojekt erledigt wird.