View allAll Photos Tagged class11

Anniston Army Depot graduated 13 individuals from its Depot Leadership and Management Program May 8, 2015.

Shots from Contingency and Tech

Contingency at the 2014 Baja 1000

Prepping 1107 for the 1000

We made it 24 miles. It's racing.

Prepping 1107 for the 1000

Class 11 12088 Shirley arrives at Lionheart on the Alnmouth Valley Railway on 27th May 2024. The diesel was substituted for J94 No 60 which had developed a fault.

We're 19 days out from the Baja 1000

This shunter,built in 1945 in Derby by English Electric.was in the engine shed at Haverthwiate Railway yesterday.

Scenes from the 2017 Mint 400

We made it 24 miles. It's racing.

We hold our first meeting of the 2014 race season at Wallentine Motorsports

Starting to button up 1107

Final big push before departing for the Baja 1000

BR class 11 "12049" (in reality 12082) stabled outside the boiler shop at Ropley on the Mid Hants Railways during the 2013 MHR diesel gala.

 

12082 replaced 12049 after the former was destroyed in a fire in July 2010.

Contingency at the 2014 Baja 1000

BR class 11 shunter "12049" in the yard at Ropley MPD on 28th June 2012. This shunter is actually 12082 - the real 12049 (see below) was destroyed in the fire of July 2010.

 

[http://www.flickr.com/photos/jalapenokitten/3859718214/]

Final big push before departing for the Baja 1000

Contingency at the 2014 Baja 1000

Shots from our prep for the 2014 Baja 1000

One week til we leave for the Baja 1000

Anniston Army Depot graduated 13 individuals from its Depot Leadership and Management Program May 8, 2015.

Final big push before departing for the Baja 1000

Shots from Contingency and Tech

We're 19 days out from the Baja 1000

1 2 ••• 18 19 21 23 24 ••• 79 80