View allAll Photos Tagged Testbed

Pt Mugu Missile Park

Navy Tomcat 158623

Systems testbed aircraft

 

dsc00101, 2009:05:16 14:40:53, 3D, L, Oxnard, NAWS, Point Mugu, Naval Air Station, Missle Park, Navy Tomcat 158623

Pima Air and Space Museum

 

The Boeing 747 began as a concept for a U.S. Air Force contract competition to design a heavy lift cargo aircraft. That contest was eventually won by the Lockheed C-5 Galaxy, but Boeing’s failure to win that contract led it to develop one of the most iconic aircraft ever. The first 747 made its maiden flight in February 1969 and the type made its first commercial flight less than a year later. Since then the humpbacked shape of the 747 has become familiar to millions of travelers around the world. The “Jumbo Jet” is the first twin isle airliner and in some configurations could carry more than 500 passengers. This immense size allowed a much lower operating cost per seat and helped bring long distance air travel into the price range of vastly more people. Boeing has built more than 1,560 since 1969. As of 2018, only about 20 remain to be delivered. The era of the 747 as a passenger plane is coming to an end as it is replaced by more fuel-efficient twin-engine aircraft, but it will continue to be in use as a cargo plane for many years to come.

 

It was built by Boeing Aircraft Company at Everett, Washington and delivered to Pan American World Airways on March 21, 1970. It is the twenty-fifth 747 built. Following Pan Am’s practice of naming its aircraft, this airplane flew with the name “Clipper Star of the Union” until 1982 when it was renamed “Clipper Ocean Spray.” It remained with Pan Am until the bankruptcy of the airline in 1991. In March 1992 it was purchased by General Electric for use as an engine test bed. Since then the plane has flown more than 3,000 hours carrying various test engines for GE as they develop the engines that power many of the planes that are replacing the 747 in airline service. General Electric donated the aircraft to the Pima Air & Space Museum in November 2018.

 

Wingspan: 195 ft 8 in.

Length: 231 ft 4 in.

Height: 63 ft 5 in.

Weight: 735,000 lbs (loaded)

Maximum Speed: 595 MPH

Service Ceiling: 45,000 ft

Range: 6,000 miles

Engines: Four Pratt and Whitney JD9D-3 turbofans with 43,000 pounds of thrust each

Crew: 3 flight crew, 15 flight attendants, 374 to 490 passengers

Manufacturer: Boeing

Markings: General Electric Aviation, 2018

Designation: 747-121

Registration: N747GE

Serial Number: 19651

Boeing 747-400 "General Electric Testbed" N747GE

Fitted with the GE9X turbofan engine under the port wing.

 

History:

Manufacturer Serial Number (MSN): 26355

Line Number: 1024

Aircraft Type: Boeing 747-400

Age: 25.0 Years

Production Site: Everett (PAE)

Airframe Status: Active

 

1994: March, - To Japan Airlines as JA8910

2010: December, - To AerSale Inc. as N356AS

2010: December, - To General Electric, testbed. N356AS

2011: December, - To General Electric, testbed. N747GE

28-02-10 This is where I have spent most of today. Sat on the floor running iPerf bandwidth tests over a test network. Yes ladies and gentlemen you guessed it. Its dissertation time! Yay! Woo! So far its all going to plan. Its just boring and time consuming. And not something I really want to get into. Today's photo is another hipstamatic iPhone jobby. I had no time to take a photo today so this will have to do.

Manual Page Read: Are you kidding! Oh hang on... Page 44 - Correct posture. Satisfied?

Images Viewed: Just what I have managed to browse on my flickr feeds whilst waiting for iPerf to complete.

Other Inspiration: A Sunday and a lot of work to do. I'm going for it!

On Twitter.

 

My 365 blog - greg365.mcmull.in

Boeing 757-225 c/n 22194/5

Vought F-8 Crusader Super Critical Wing testbed

Boeing Short Inlet BSI flight test on Rolls-Royce 747 Flying Testbed at Tucson

Kawasaki UP-3C Flying Testbed (9151), 51st SQ, JMSDF Atsugi AB

Week 3 of Prototype - Probabilistic Hazards Information (Prototype - PHI) experiment of the Experimental Warning Program in the NOAA Hazardous Weather Testbed (HWT) at the National Weather Center in Norman, OK.

Week 3 of Prototype - Probabilistic Hazards Information (Prototype - PHI) experiment of the Experimental Warning Program in the NOAA Hazardous Weather Testbed (HWT) at the National Weather Center in Norman, OK.

Pima Air and Space Museum

 

The Boeing 747 began as a concept for a U.S. Air Force contract competition to design a heavy lift cargo aircraft. That contest was eventually won by the Lockheed C-5 Galaxy, but Boeing’s failure to win that contract led it to develop one of the most iconic aircraft ever. The first 747 made its maiden flight in February 1969 and the type made its first commercial flight less than a year later. Since then the humpbacked shape of the 747 has become familiar to millions of travelers around the world. The “Jumbo Jet” is the first twin isle airliner and in some configurations could carry more than 500 passengers. This immense size allowed a much lower operating cost per seat and helped bring long distance air travel into the price range of vastly more people. Boeing has built more than 1,560 since 1969. As of 2018, only about 20 remain to be delivered. The era of the 747 as a passenger plane is coming to an end as it is replaced by more fuel-efficient twin-engine aircraft, but it will continue to be in use as a cargo plane for many years to come.

 

It was built by Boeing Aircraft Company at Everett, Washington and delivered to Pan American World Airways on March 21, 1970. It is the twenty-fifth 747 built. Following Pan Am’s practice of naming its aircraft, this airplane flew with the name “Clipper Star of the Union” until 1982 when it was renamed “Clipper Ocean Spray.” It remained with Pan Am until the bankruptcy of the airline in 1991. In March 1992 it was purchased by General Electric for use as an engine test bed. Since then the plane has flown more than 3,000 hours carrying various test engines for GE as they develop the engines that power many of the planes that are replacing the 747 in airline service. General Electric donated the aircraft to the Pima Air & Space Museum in November 2018.

 

Wingspan: 195 ft 8 in.

Length: 231 ft 4 in.

Height: 63 ft 5 in.

Weight: 735,000 lbs (loaded)

Maximum Speed: 595 MPH

Service Ceiling: 45,000 ft

Range: 6,000 miles

Engines: Four Pratt and Whitney JD9D-3 turbofans with 43,000 pounds of thrust each

Crew: 3 flight crew, 15 flight attendants, 374 to 490 passengers

Manufacturer: Boeing

Markings: General Electric Aviation, 2018

Designation: 747-121

Registration: N747GE

Serial Number: 19651

Chalgrove, Martin Baker

F-35 Ejection Seat Testbed

Boeing 747-400 "General Electric Testbed" N747GE

Fitted with the GE9X turbofan engine under the port wing.

Engine is not running in this pic.

 

History:

Manufacturer Serial Number (MSN): 26355

Line Number: 1024

Aircraft Type: Boeing 747-400

Age: 25.0 Years

Production Site: Everett (PAE)

Airframe Status: Active

 

1994: March, - To Japan Airlines as JA8910

2010: December, - To AerSale Inc. as N356AS

2010: December, - To General Electric, testbed. N356AS

2011: December, - To General Electric, testbed. N747GE

Pima Air and Space Museum

 

The Boeing 747 began as a concept for a U.S. Air Force contract competition to design a heavy lift cargo aircraft. That contest was eventually won by the Lockheed C-5 Galaxy, but Boeing’s failure to win that contract led it to develop one of the most iconic aircraft ever. The first 747 made its maiden flight in February 1969 and the type made its first commercial flight less than a year later. Since then the humpbacked shape of the 747 has become familiar to millions of travelers around the world. The “Jumbo Jet” is the first twin isle airliner and in some configurations could carry more than 500 passengers. This immense size allowed a much lower operating cost per seat and helped bring long distance air travel into the price range of vastly more people. Boeing has built more than 1,560 since 1969. As of 2018, only about 20 remain to be delivered. The era of the 747 as a passenger plane is coming to an end as it is replaced by more fuel-efficient twin-engine aircraft, but it will continue to be in use as a cargo plane for many years to come.

 

It was built by Boeing Aircraft Company at Everett, Washington and delivered to Pan American World Airways on March 21, 1970. It is the twenty-fifth 747 built. Following Pan Am’s practice of naming its aircraft, this airplane flew with the name “Clipper Star of the Union” until 1982 when it was renamed “Clipper Ocean Spray.” It remained with Pan Am until the bankruptcy of the airline in 1991. In March 1992 it was purchased by General Electric for use as an engine test bed. Since then the plane has flown more than 3,000 hours carrying various test engines for GE as they develop the engines that power many of the planes that are replacing the 747 in airline service. General Electric donated the aircraft to the Pima Air & Space Museum in November 2018.

 

Wingspan: 195 ft 8 in.

Length: 231 ft 4 in.

Height: 63 ft 5 in.

Weight: 735,000 lbs (loaded)

Maximum Speed: 595 MPH

Service Ceiling: 45,000 ft

Range: 6,000 miles

Engines: Four Pratt and Whitney JD9D-3 turbofans with 43,000 pounds of thrust each

Crew: 3 flight crew, 15 flight attendants, 374 to 490 passengers

Manufacturer: Boeing

Markings: General Electric Aviation, 2018

Designation: 747-121

Registration: N747GE

Serial Number: 19651

Week 3 of Prototype - Probabilistic Hazards Information (Prototype - PHI) experiment of the Experimental Warning Program in the NOAA Hazardous Weather Testbed (HWT) at the National Weather Center in Norman, OK.

Airbus A340-642

MSN 0360 [Prototype/Testbed]

F-WWCA '001'

 

Airbus S.A.S

 

Copyright © 2011 A380spotter. All rights reserved.

Catalog #: 00054933

Manufacturer: Convair

Designation: Model 340

Official Nickname:

Notes:

Repository: San Diego Air and Space Museum Archive

Trying out Picnik - old BW prints are perhaps not the ideal testbed, but I managed some changes - perhaps not ideal...

Honeywell Aviation Services - Convair CV-580 (CV-340 Turboprop Conversion) - N580HW (c/n 2)

 

This aircraft was the second Convair 340 (CV-340) ever built. It was delivered to United Air Lines (UAL) as N73102, one of many wearing the name "Mainliner Convair" on September 2, 1952. Frontier Airlines would then be the next operator of the aircraft (same registration) in August 1966. After Frontier, the airplane would be purchased by Gem State Airlines and re-registered as N116GS in May 1979. Gem State as then renamed Golden Gate Airlines in 1980. In February 1984, Aspen Airways would buy the aircraft and re-register it as N113AP. Then in March 1991, Aspen Airways sold the aircraft to Renown Aviation, Renown then soon selling it to Allied Signal in January 1992. Allied Signal registered the aircraft as N580AS and equipped it as a flying testbed. Allied Signal and Honeywell merged in 1999, the aircraft now wears Honeywell titles and is registered as N580HW.

The XK120 was launched in roadster (OTS) form at the 1948 London Motor Show as a testbed and show car for the new Jaguar XK engine. It caused a sensation, which persuaded William Lyons to put it into production.

 

The "120" in its name referred to its 120 mph top speed making the XK120 the world's fastest standard production car at the time of its launch. The OTS was short for Open Two-Seater.

 

XK120s were active in racing and rallying with Leslie Johnson driving the car to it's first-ever race victory at Silverstone in 1949.

 

The pairing of John & Dinah Pilkington took the car to overall 36th position and secured 1st in the B3 classification at the 2010 Three Castles Rally in North Wales.

North American XB-45 (S/N 45-59479) as a testbed for rocket assisted take-off. Taken Sept. 24, 1958. (U.S. Air Force photo)

Catalog #: 00054953

Manufacturer: Convair

Designation: Model 340

Official Nickname:

Notes:

Repository: San Diego Air and Space Museum Archive

Note the lack of smoke from the test engine

Photo by Jiuguang Wang (www.robo.guru), Carnegie Mellon University.

 

This image is freely available under the Creative Commons Attribution-ShareAlike license.

KENNEDY SPACE CENTER, FLA. Louis MacDowell (right), Testbed manager, explains to Center Director Jim Kennedy the use of astmospheric calibration specimens. Placed at various locations, they can rank the corrosivity of the given environment. The KSC Beach Corrosion Test Site was established in the 1960s and has provided more than 30 years of historical information on the long-term performance of many materials in use at KSC and other locations around the world. Located 100 feet from the Atlantic Ocean approximately 1 mile south of the Space Shuttle launch sites, the test facility includes an atmospheric exposure site, a flowing seawater exposure site, and an on-site electrochemistry laboratory and monitoring station. The beach laboratory is used to conduct real-time corrosion experiments and provides for the remote monitoring of surrounding weather conditions. The newly added flowing seawater immersion facility provides for the immersion testing of materials and devices under controlled conditions. Image from NASA, originally appeared on this site: science.ksc.nasa.gov/gallery/photos/ Reposted by San Diego Air and Space Museum

Seen here at Boeing field as the 747 Participant in the Parade of 787's - part of the pre-787 rollout festivities on July 6, 2007

Week 3 of Prototype - Probabilistic Hazards Information (Prototype - PHI) experiment of the Experimental Warning Program in the NOAA Hazardous Weather Testbed (HWT) at the National Weather Center in Norman, OK.

During a socially-distanced tour, Soldiers got a first-hand look at the new ARL Robotics Research Collaboration Campus at Graces Quarters, Md., and an autonomous vehicle testbed independently operate in a various military scenarios Feb. 23

 

Raytheon's Voodoo 1 - N289MT at LAX (aka RMT)

Newark Emergency Services Show 2015

Aki's toys :) All of them are probably running Talos tests, loading webpages.

1 2 ••• 69 70 72 74 75 ••• 79 80