View allAll Photos Tagged Terminal

Grand Central Terminal, NYC, NY.

 

All rights reserved. Written permission required for usage.

Please do not use this photo on any websites or for personal use.

Thank you.

 

©2014 Fantommst

 

CC BY-NC-ND - Associação de Turismo do Porto e Norte, AR

Welcome Center - JFK Terminal 5

The Terminal Tower, built as part of the Cleveland Union Terminal complex, was the 2nd tallest building in the world when completed in 1930 in Cleveland, Ohio. The tallest building at that time was the Woolworth Building in New York City, soon to be topped by the Bank of America Trust Building, the Chrysler Building, and the Empire State Building. The Terminal Tower remained the tallest building outside of New York City until 1964 when it was surpassed by the Prudential Tower in Boston, Massachusetts.

 

Image © 2012 Clarence Holmes / Clarence Holmes Photography, All Rights Reserved. The image is protected by U.S. and International copyright laws, and is not to be downloaded or reproduced in any way without written permission.

 

If you would like to use this image for any purpose, please see the available licensing and/or print options for this image on my website or contact me with any questions that you may have.

Baggage Carousel JFK Terminal 5

Giving you a sense of the crowds in the Chhatrapati station in Mumbai.

Hunterston Terminal, in North Ayrshire, Scotland, is a coal-handling port located at Fairlie on the Firth of Clyde, and operated by Clydeport. It lies adjacent to Hunterston estate, site of Hunterston Castle.

 

The port, completed in 1979, was originally called Hunterston Ore Terminal and was intended to handle iron ore for British Steel's Ravenscraig steelworks. Existing facilities at General Terminus Quay on the upper River Clyde were unsuitable for increasingly large vessels, but Hunterston, with its one-mile long jetty, is able to handle modern ships of any size.

 

History

The new port at Hunterston replaced facilities at General Terminus Quay (now Springfield Quay), on the River Clyde, near the centre of Glasgow. These facilities had been designed in the early 1950s to allow the simultaneous unloading of two large ships carrying bulk iron ore. The ships were designed to carry 12,000 tons (12,200 metric tonnes) of iron ore. Iron ore was to be transported, in railway waggons, via the General Terminus and Glasgow Harbour Railway, from the General Terminus Quay to the new Ravenscraig steelworks which opened in the late 1950s.

 

Facilities at Hunterston Terminal

At Hunterston Terminal, an overhead conveyor linked to two gantry cranes carries coal to a railhead on the Ayrshire Coast Line railway. Clydeport claim an unloading rate of 2800 tonnes of coal per hour. The conveyor is also linked to a ship loader which loads coal into smaller ships on the inner berth, this coal is transported to Manchester and Belfast amongst other places.

 

Among other users, coal from Hunterston Terminal supplies Longannet power station in Fife and the Drax power station in Yorkshire. The resulting coal traffic has been a major reason for the reopening of the Stirling-Alloa-Kincardine rail link.

 

All rights reserved ©

Former Erie Lackawanna Railroad Terminal

The Moneris Vx810 terminal allows businesses of all types to accept credit and debit card payments. From restaurants and retailers to doctors and B2B merchants. The Vx810 terminal is also chip-enabled.

 

Visit moneris.com for more information

Todos os dias é um vai e vem a vida se repete na estação. Tem gente que chega pra ficar. Tem gente que vai pra nunca mais. ( Foto Celular)

The Chestnut Pavilion entrance/exit toe the underground bus terminal.

Cincinnati Union Terminal renovation at Cincinnati, Ohio on August 14, 2017

Dover Cargo Terminal is unrivalled in terms of its strategic location, efficiency and competitive pricing. It's a potent combination that makes the Port of Dover extremely popular with many of the leading European freight carriers, with our fantastic cross-channel ferry links to the continent.

Cleveland, Terminal Tower. Stairs connecting the street level and train level. Love that 70's RTA logo! www.clevelandmemory.org/cut-coll/

S15, Ready to take off

During the regime of Alfredo Stroessner the airport of Asunción was called after the dictator of Paraguay. After his resignation, the airport was renamed Aeropuerto Internacional Silvio Pettirossi.

CC BY-NC-ND - Associação de Turismo do Porto e Norte, AR

North Terminal and old control tower at Detroit Metro. Changed planes here between Philadelphia and Seattle. All I could do was wave to all my relatives in Detroit.

Saint Louis Lambert International Airport. Saint Louis, Missouri.

CC BY-NC-ND - Associação de Turismo do Porto e Norte, AR

Los Angeles Historic-Cultural Monument No. 177, the 1925 building by architects Schultze and Weaver was the terminal for L.A.'s first subway, all one mile of it.

Big Orange Landmarks

El terminal Mueble, se llama así porque está ubicado en la parte superior de un mueble de mi pieza. Aquí guardo todos los buses rígidos y articulados de servicios troncales de Transantiago. El día de la foto tenía 40 buses, sin embargo, constantemente voy creando más, así que ese número crece.__

 

The Mueble terminal, is called thus because it's located in a furniture in my room. Here I keep all the rigid and articulated buses of Transantiago main services. The day of the photo it have 40 buses, but, I always create more, and the number up.

O'Hare Airport, Chicago.

movie clips from Og Must be Crazy (Dolphy) 1990

Port of Kiel new Stena Terminal (Schwedenkai) just after departure of Stena Germanica

Valero Energy, Avonmouth terminal

  

Photographer: Jon Kent

Copyright: jon kent

Terminal F - Paris Charles De Gaulle Airport. For a long time it was dedicated to international flight to asia and north america for members of Sky Team. Now it's mainly used for european flight.

 

Terminal F - Aéroport Paris Charles De Gaulle. Pendant longtemps ce terminal a servi pour les vols internationaux vers l'asie et l'amérique pour les compagnies membres de Sky Team. Désormais il est utilisé principalement pour des vols européens.

Bus Terminal, Avenida Córdoba (esq. / cnr. Avenida Misiones)

La Terminal Cotorro recibio nuevos Ikarus 260-Giron XIII en 1985, para reemplazar los Hino RC-300 que habian recibido en 1981.

 

Con esto salieron de circulacion de La Habana los ultimos Hino y a partir de este momento solo habia en La Habana Ikarus 260 y Giron XIV.

 

Fueron en total 105 carros, numerados del 2167 al 2271.

A la Ruta 204 le correspondieron 14 carros, del 2219 al 2232, para una frecuencia de 10 minutos..

 

Como reservas los numeros 2248 al 2271, 24 carros,

Habia 3 carros mas como reservas , que los que debian haber sido, para el 20%.

 

Estos deben haber sido los que hubieran correspondido a las Rutas 47, 2 carros y 99, 1 carro, que entraron en funcionamiento mas tarde.

The North Side terminal for the transit company, 901 N. Halsted St. on Goose Island.

 

NOTE: A demolition permit was issued for 901 N. Halsted St. on Goose Island in May 2023. The Halsted Pointe development, their approved megadevelopment on Goose Island. Approved in August 2021, the development will replace the current Greyhound Bus facility. Designed by Hartshorne Plunkard Architecture for Omni Group, the development’s first phase features construction of a 46-story, 504-foot mixed-use tower that will include 460 residential units and 20,000 square feet of retail space. Phase 2 will include 30-story and 45-story towers with 1,150 apartments and commercial space. Phase 3 will include a 65-story mixed-use tower. Rising 691 feet, the tower will have 1,015 units with 18,00 square feet of retail. This phase will provide more than 100,000 square feet of outdoor green space with a new riverwalk and market plaza. The final phase will be a 28-story 313-foot hotel tower. The building will have 2,150 square feet of retail space and 300 hotel keys. With a total of four phases, the overall development is expected to contain up to 2,650 residential units, retail space, a hotel, and 1,470 parking spaces. Onni Group is targeting the fourth quarter of 2023 to break ground on Phase 1, with a 24-month construction timeline to follow.

   

© All rights reserved

Todos los derechos reservados

Rogelio Hernandez

Galería de fotos, Terminal Terrestre, mejoras del sistema de circuito cerrado de TV

 

www.chone.gob.ec/index.php?gc=1&gal=261&foto=1

CC BY-NC-ND - Associação de Turismo do Porto e Norte, AR

The free 16th Street Mall shuttle was extended from its previous terminal at Market Street and to Chestnut Place and links with the underground bus terminal, light rail and Union Station.

Chicago Terminal's twice-a-week switch job leaves Kingsbury St. and heads south to Goose Island on December 27, 2007.

1 2 ••• 33 34 36 38 39 ••• 79 80