On 10 October 2016, at 20:00 GMT (22:00 CEST), ESA's 35m deep-space tracking station at Cebreros, Spain, transmitted a message toward the North Star, as part of an project dubbed "A Simple Response to an Elemental Message." More details via blogs.esa.int/rocketscience/2016/07/28/a-simple-response/ Image credit: ESA/JL Lopez

Progress continues on the East Side Access project as of February 12, 2013.

 

This photo shows work on the caverns underneath Grand Central Terminal that will house a future concourse for arriving and departing Long Island Rail Road trains.

 

Photo: Metropolitan Transportation Authority / Patrick Cashin.

siempre consigue mi atención

Press briefing at ESA/ESOC, Darmstadt, Germany, on ExoMars, 20 Oct 2016. Credit: ESA/P. Shlyaev

Photos taken at our ESOC mission control centre around the time of AOS(acquisition of signal) from ExoMars/TGO following the separation of the Schiaparelli lander Credit: ESA/P. Shlyaev

La que llora de tanto reir, la que grita para que le hagan caso.Esa que con sus amigas no para de reir,de cantar, de bailar, de hacer la tonta a todas horas.Esa que pone una sonrisa ante los problemas, esa que en los días de lluvia le gusta estar en casa con la familia viendo cientos de peliculas.La que cree en la amistad entre un hombre y una mujer, esa que no se da por vencido, la que intenta luchar por lo que quiere.La que defiende a los suyos ante todo, para la que sus amigos son su vida, sus ganas de vivir.Esa que se inspira y a veces escribe cosas, cosas que a la gente les suele gustar.Esa que intenta mostrar sus sentimientos, la que todo el mundo ve como si fuese rara.Esa que, en ocasiones, se preocupa demasiado por los demás y después ellos no se preocupan tanto por ella.La que intenta ser lo más amable posible, esa que se cansa a veces un poco de las cosas pero que intenta seguir adelante con ellas.La que esta harta de la falsedad, de la hipocresía, de la envidia, del rencor...Esa que intenta mejorar día a día, ser mejor persona.La que pasa de los comentarios malos de la gente.La que va por la calle y ve a alguien conocido y le grita hasta que le escuche.Esa que se acuesta en la azotea y mira la forma de las nubes, esa que se pone a mirar fotos para recordar viejos tiempos.La que se aburre en clase y pinta la goma, la mesa, la agenda, el libro,todo.Esa a la que le gusta tumbarse en la playa y escuchar el ruido del mar.A la que le gusta abrazar a sus amigos después de mucho tiempo sin verse, la que en los días solitarios en casa pone música y baila sin parar.La que hace reir a sus abuelos sea como sea porque su risa le da vida, alegría, ganas de seguir luchando.Esa que se pone unos pantalones cortos en pleno invierno.La que es un poco vaga, gansa,pasota... esa a la que le gusta dormir acompañada.La que se pinta la cara simplemente para hacerse fotos, a la que le gusta animar en los partidos de fútbol, esa que todo el mundo le dice que esta loca.La que en días calurosos camina por casa en bikini, esa que se pone muchas pulseras, y zapatillas rotas, y ropa de tio, y esa que es feliz asi como vive, como es y con lo que tiene, gente maravillosa a su al rededor.Si, esa.Esa soy yo.

Photo collage of ESA's Kiruna station, Sweden. Credit: ESA - CC BY-SA IGO 3.0

Photos taken at our ESOC mission control centre around the time of AOS (acquisition of signal) from ExoMars/TGO following the separation of the Schiaparelli lander Credit: ESA/P. Shlyaev

VMC Image acquired on 16-11-2018 at 08:30:56 at an altitude of 9191.93 km above Mars, on Mars Express orbit number 18819. Image #8 out of 10 from this observation.

Credit: ESA - European Space Agency, creativecommons.org/licenses/by-sa/3.0/igo/ CC BY-SA 3.0 IGO

Invest NI delegation visits the ESA Pavilion, during the Paris Air and Space Show, on 19 June 2017.

 

Credit: ESA-Philippe Sebirot

ESA's technical heart, ESTEC, in Noordwijk, the Netherlands, opened its gates to visitors on 2 October 2016 for the annual Open Day.

 

Credit: ESA-SJM Photography

Poster I did for UBC's Economic Student Association

Team, workign at perth station to track Soyuz/Fregat dueing the Sentinel-1 launch, 3 April 2014

Bufon-esec-sien-mexs-zike

On 7 October 2018 we opened the doors of ESTEC, our technical heart in the Netherlands, and welcomed more than 7600 people on a day full of activities including meet-and-greet with astronauts, tours around our test rooms, learning about the science in science fiction, and about the activities ESA does in all its establishments around Europe and beyond.

 

Credits: ESA–G. Porter

The progress of the East Side Access construction in Long Island City, Queens, as of December 20, 2012.

 

This photo shows work underway on one of the most challenging parts of the entire project: Excavating a tunnel under Northern Boulevard, while simultaneously supporting the overhead roadway, the overhead underground subway (E/M/R), and the elevated subway (N/Q).

 

To ensure stability, the tunnel was excavated in seven separate horizontal segments, or “drifts." And because the ground is soft at this site and difficult to control during excavation, it was frozen to allow for increased control and rigidity.

 

Workers had to drive a new set of foundation pilings into the ground to temporarily support the elevated structure during construction. They then jacked up the line a fraction of an inch to shift the weight to the temporary supports, which you can see in some views running vertically through the newly built tunnel. Those supports will be removed after the weight of the elevated subway is shifted back to the walls of the tunnel, which has been engineered to carry the load.

 

Photo: Metropolitan Transportation Authority / Patrick Cashin.

The last-ever switch off of the Rosetta Engineering Qualification Model - an Earth-bound twin of the real Rosetta - located at ESOC, Darmstadt, Germany. Credit: ESA

The progress of the East Side Access construction in Long Island City, Queens, as of December 20, 2012.

 

This photo shows work underway on one of the most challenging parts of the entire project: Excavating a tunnel under Northern Boulevard, while simultaneously supporting the overhead roadway, the overhead underground subway (E/M/R), and the elevated subway (N/Q).

 

To ensure stability, the tunnel was excavated in seven separate horizontal segments, or “drifts." And because the ground is soft at this site and difficult to control during excavation, it was frozen to allow for increased control and rigidity.

 

Workers had to drive a new set of foundation pilings into the ground to temporarily support the elevated structure during construction. They then jacked up the line a fraction of an inch to shift the weight to the temporary supports, which you can see in some views running vertically through the newly built tunnel. Those supports will be removed after the weight of the elevated subway is shifted back to the walls of the tunnel, which has been engineered to carry the load.

 

Photo: Metropolitan Transportation Authority / Patrick Cashin.

The progress of the East Side Access construction in Long Island City, Queens, as of December 20, 2012.

 

This photo shows work underway on one of the most challenging parts of the entire project: Excavating a tunnel under Northern Boulevard, while simultaneously supporting the overhead roadway, the overhead underground subway (E/M/R), and the elevated subway (N/Q).

 

To ensure stability, the tunnel was excavated in seven separate horizontal segments, or “drifts." And because the ground is soft at this site and difficult to control during excavation, it was frozen to allow for increased control and rigidity.

 

Workers had to drive a new set of foundation pilings into the ground to temporarily support the elevated structure during construction. They then jacked up the line a fraction of an inch to shift the weight to the temporary supports, which you can see in some views running vertically through the newly built tunnel. Those supports will be removed after the weight of the elevated subway is shifted back to the walls of the tunnel, which has been engineered to carry the load.

 

Photo: Metropolitan Transportation Authority / Patrick Cashin.

Rosetta flight control team at ESOC on 11 November 2014 Credit: ESA/ J. Mai

Seen around 11/12 November 2014, as the station provided critical support for the Rosetta #cometlanding Credit: D. Pazos

NASA is gearing up to test a structural representation of the ESA (European Space Agency)-built Service Module for Orion at the agency’s Glenn Research Center Plum Brook Station in Ohio. The test article will be subjected to mechanical and acoustic vibration, pyro-shock, fairing separation and solar array deployment tests at Plum Brook Station’s Space Power Facility, where the liftoff environment the service module will endure can be tested. The adapter that will connect the crew and service module, shown here inside the Neil Armstrong Operations and Checkout Building high bay, is being prepared for shipment to Plum Brook Station from NASA’s Kennedy Space Center in Florida, and will be mated with the ESA Service Module prior to testing. The adapter is expected to be delivered to Ohio in June, followed by ESA’s delivery in October. Photo credit: NASA/Kim Shiflett

Press briefing at ESA/ESOC, Darmstadt, germany, on ExoMars, 20 Oct 2016. Credit: ESA/P. Shlyaev

ESA astronaut Alexander Gerst after sampling for microbiological analysis.

 

Credits: ESA / A. Romeo

Images from ESA's ESOC mission control centre, Darmstadt, Germany, during the arrival of the ExoMars/TGO orbiter and the Schiaparelli test lander. Credit: ESA/J. Mai

Press briefing at ESA/ESOC, Darmstadt, Germany, on ExoMars, 20 Oct 2016. Credit: ESA/P. Shlyaev

Photos taken at our ESOC mission control centre around the time of AOS(acquisition of signal) from ExoMars/TGO following the separation of the Schiaparelli lander Credit: ESA/P. Shlyaev

The East Side Access megaproject is connecting the LIRR to a new passenger concourse underneath Grand Central Terminal. This photo shows an update on the status of construction as of June 2013.

 

This photo shows the board where sandhogs and other workers sign in and sign out of the project worksite using brass plates.

 

Photo: Metropolitan Transportation Authority / Patrick Cashin

The East Side Access megaproject is connecting the LIRR to a new passenger concourse underneath Grand Central Terminal. This photo shows an update on the status of construction on the Manhattan side of the project, as of June 2013.

 

Photo: Metropolitan Transportation Authority / Patrick Cashin

ESA Director of Operations Rolf Densing and Mark McCaughrean, ESA Senior Scientific Advisor, at ExoMars launch event at ESOC 14 March 2016, including images from the Main Control Room around launch and receipt of first signals. Credit: ESA/J. Mai

  

The East Side Access megaproject is connecting the LIRR to a new passenger concourse underneath Grand Central Terminal. This photo shows an update on the status of construction on the Manhattan side of the project, as of June 2013.

 

Photo: Metropolitan Transportation Authority / Patrick Cashin

Photos taken at our ESOC mission control centre around the time of AOS (acquisition of signal) from ExoMars/TGO following the separation of the Schiaparelli lander Credit: ESA/P. Shlyaev

On 7 October 2018 we opened the doors of ESTEC, our technical heart in the Netherlands, and welcomed more than 7600 people on a day full of activities including meet-and-greet with astronauts, tours around our test rooms, learning about the science in science fiction, and about the activities ESA does in all its establishments around Europe and beyond.

 

Credits: ESA–G. Porter

1 2 ••• 6 7 9 11 12 ••• 79 80