View allAll Photos Tagged CPVC
Culligan HD-950 filter housing installed on the wall, anchored to a wall stud, and ready for piping.
Now it is time to see what is behind the west shower wall. This bathroom WILL NOT be rebuilt until it's integrity is verified. The insulation will not be replaced because the back porch was enclosed, making this now an inside wall
Around the valve we go. I don't know why, but he didn't use the "non slide" thin set. He used spacers on every tile and the lines ended up virtually perfect!
Exposing the inside of the south wall of the shower revealed much termite damage, but virtually no dry rot. And the plot thickens... only the beginning.
The "one hole straps" used to hold the copper should have been made of copper, or insulated with something. Intimate contact with dissimilar metals is undesirable.
It is customary to finish the walls first. However, since the floor was re-poured, we felt it better to ensure it's integrity prior to going further.
This is what happens when I get bored with a sharp knife and a nerf gun.
Minimized, hole filled with the dart holders and scrap plastic, ammo holders in the grip, second O ring, CPVC barrel
Virtually the entire floor stud was replaced without having to work on the other side of the wall. Even the baseboard remained in place.
All wetted PVC or CPVC construction for highly corrosive and high purity fluids. Ideal for water treatment, electrogalvanizing & pickling lines, & deionized water.
The curb is completely encased here... and grouted. Note how the grout lines align with the back (west) wall.
Time to complete the sheet rock. I measured the lighting electrical fixture relative to the perimeter of the missing sheet rock.
The first tile is THEE reference. The long level is used to verify it. After it sets awhile, the rest can be set.
in our 12 year old home, we need to replace all of our pipes because these CPVC FlowGuard Gold pipes have become brittle.
Okay, now it's time to open the remainder of the north wall. Need to check behind the wall for all types of damage and disrepair.
What a mess was found behind the north wall. Leaky faucets, mold, and a myriad of other yet undiscovered issues.
Once again, straps hammered and screwed in with deck screws. Also notice the tight fit. I like it like that.
When these mineral layers build up, you lose water pressure until the pipe is clogged. At any time, large pieces of the scale can break up and clog your pipes. Plastic pipes thus ensure smooth, constant drainage. ajaypipes.home.blog/2019/04/26/know-about-features-of-cop...
Sometimes you have to rely on the pro's. Pouring this pan required the ability to set the drain pitch properly.
This galvanized strap was hammered into the 2X6 to secure it from motion. It worked well, but I was afraid it could work it's way out. It is not likely, but possible. So I anchored it with deck screws (illustrated later.)
UPVC Ball Valve Manufacturers, Aqua UPVC Ball Valve Manufacturer in Gujarat, CPVC Ball Valve Manufacturer in Gujarat, CPVC Pipe Manufacturers in Gujarat, CPVC Pipes and Fittings.
For more Details Please Visit Us at : www.angelcpvc.com/
Water sealer was used as deemed appropriate. However, I'm sure the shower will never leak (it is completed as of this writing.)
This is a piece of the 2X6 which was removed for dry rot. Notice the roots, attracted by the moisture.
RPVC Ball Valve Manufacturers, Manufacturer of UPVC Ball Valve,UPVC Ball Valve Manufacturer in India,UPVC Ball Valve Suppliers,UPVC Ball Valve Manufacturers.
For more Details Please Visit Us at : www.angelcpvc.com/
Angel CPVC Solvent Cement, Angel RPVC Ball Valve, Angel Aqua RPVC Ball Valve, Angel CPVC Fittings, RPVC Ball Valve Manufacturers, CPVC Solvent Cement.
For more Details Please Visit Us at : www.angelcpvc.com/