View allAll Photos Tagged segment
I am for participation design but in this case the first step has to be top-down to create community
Waitukubuli National Trail, Segment 4, Wotten Waven to Pond Casse but we started at Trafalgar.
www.waitukubulitrail.dm/?page_id=32
© Tropical Ties Dominica photos
Please do not use without express permission.
This is a bud vase I made from a solid piece of Madrone and some Purpleheart segments separated by Maple veneer.
Segment de la machine hydraulique du 19ème siècle en sous-sol avec l'arrivée d'eau.
La vanne est fermée +++.
The High-Level Segment of the 28th Meeting of Parties to the Montreal Protocol was officially opened on October 13, 2016 in Kigali, Rwanda. Over 1000 delegates from 197 countries are attending the meeting which is discussing an ambitious amendment to the Protocol to phase out high-global warming potential Hydrofluorocarbons (HFCs)
Luogo: Fara in Sabina - 2009
Autore: Francesco Simonetti
Macchina: Nikon F5
Ottica: Nikkor 28/70 f. 2.8
Pellicola: fuji velvia 50iso rev. 35mm
Leadville,CO (Lake County)
TN Pass to Wurtz Ditch Road
Tennessee Pass is the beginning of Segment 9 (or the end of Segment 8). In 2016 I finished my hike here. This year (2017) I was planning to do the Collegiate Loop which starts at Segment 11. Todays hike was a dayhike which allowed me to acclimate to the altitude (as of yet, I have not had any problems with altitude.)
A fairly easy hike to Wurtz Ditch Rd and back. The trail meandered through several small meadows and over a few bridges. Almost 6 miles roundtrip. I was not done hiking for the day.
Wurtz Ditch Road is a dirt road, probably passable by most vehicles. The Colorado Trail Trailhead is very small with parking for maybe 2 cars.
This old WWII era airstrip south of the Gladden 1 MOA in Arizona, has was appears to be the remains of a segmented circle, indicating the preferred runway use patterns. It is known by several names, including American Airways Field, Salome Emergency Field, and Salome CAA Site 27 B.
Left lying around for weeks, the Segs start coming apart. These have quite a leverage. I would recommend leaving the two halfs unglued untill a day before the rings are glued ontop of each other. That way the wood should have settled some. The overlapping joints will give more resistance to the opening movement.