View allAll Photos Tagged scraper

A Terex Scraper working for Balfour Beatty on an unidentified site (possibly somewhere in North Tyneside) in the late 1980's.

19-year-old Tyrone Stevens, a.k.a "The Scraper Bike King," (front) rides down Foothill Boulevard on his three-wheeled scraper bike. The term "scraper" was originally coined to describe a car with flashy paint and large rims that nearly scrape the inside of its wheel well. Photo by Jacob Fenston.

A Craftsman aluminum scraper plane 3740BL. Kind of a funky plane, an all aluminum body and a four sided scraper blade. Sargent made them for Craftsman in the 1960's.

Still constructing The Bend Motorsport Park

Brownfields Weekly

 

It’s a short ride on a sunny, arid morning down Congress Street in downtown Tucson, Arizona, to the dusty field that’s home to the Rio Nuevo landfills.

 

Right now, Nearmont, the smallest of three landfills on the site, doesn’t look at all like one. It’s just a bumpy 90-acre stretch of wide-open, dusty land beneath the shadow of downtown’s skyscrapers and against the bone-dry Santa Cruz River.

 

Drive back about 1,000 feet on the utility road, and you’ll see a chain link fence with an open gate. The chain link surrounds a square plot of land, fifty feet long and wide. On the plot at exact intervals is a nine-point grid of PVC piping penetrating the landfill beneath. A small construction trailer sits against the fence. And across from that, a large utility box, wires running into the ground.

 

To the untrained eye, it looks to be nothing more than a Tucson city water experiment. Or to the more suspicious in the desert, a covert government project. But this experimental PVC pipe grid - and what it’s doing underneath the landfill - could change the way brownfields sites of tomorrow are remediated.

 

Past, Future and Present

 

Behind the chain link fence is the City of Tucson’s bioreactor project. It is the physical beginning of a monumental and aggressive brownfields land remediation and redevelopment project. The landfill will become part of Rio Nuevo - an entire city district in the heart of Tucson’s downtown.

 

Projected, Rio Nuevo will take at least 20 years and $350 million to complete. The new bioreactor technology on Nearmont is paving the way for the Rio Nuevo of the future: an entire city district that will pay homage to the city’s historic past as one of the oldest settlements in the West.

 

In fact, archeologists have found that people have lived in the Tucson area as far back as 2,600 years ago. What’s now Nearmont was once part of the land where the San Augustin Mission was established in mid 1700s. The old Mission included a convento - a priest’s residence and trade school - a mission garden, a chapel, a granary and smaller storage buildings, the entire grounds surrounded by a wall. By 1840, the Mission had finally been abandoned.

 

As the Mission ruins disappeared into the late 1800s and early 1900s, the site became home to a clay pit. That ceased operations for good in the 1940’s, until it became its final incarnation: a 1950’s-era city dump. For twelve years, the site saw the only the city’s trash, until it was closed and forgotten in 1962. Thirty-seven years passed until Rio Nuevo had its rebirth.

 

In November of 1999, Tucson politicians put Proposition 400 in front of the voters - its purpose to raise $60 million in Arizona state tax money over ten years to help fund the Rio Nuevo project. It passed by a convincing 62% margin.

 

Among the planned projects at Rio Nuevo are a full-scale recreation of the San Augustin Mission and adjoining Cultural Plaza. Also planned are an Arizona Historical Museum, an American Indian Cultural Center and a Mercado with retail stores. More downtown housing will be added. Future additions include the Sonoran Sea Aquarium, the Tucson Science Center, an IMAX Theatre, an expanded Tucson Convention Center, and a City Visitor’s Center.

 

But the completed vision of Rio Nuevo is some years away. What Rio Nuevo has now is what’s behind the chain link fence - the experimental bioreactor.

 

100 Years in 40 Months

 

Underneath the Nearmont landfills lie decades of Tucson refuse. Between 15 and 50 feet of it.

 

The problem: the trash beneath the landfill must be degraded and made non-reactive. That, added with the methane gas landfills naturally produce make it too undesirable for building. Otherwise, any construction on the land would be at least century away - the time it would take the garbage in Nearmont to degrade naturally.

 

Tucson’s Office of Environmental Management (OEM), however, was preparing a solution - the bioreactor. But remediation technology like it had never been used before. If it did work, and proved safe and cost-effective, it would be used to remediate the other landfills.

 

The process it performs is called enhanced aerobic degradation. Simply, the nine-spot PVC pipe grid - dug under the ground and inside the landfill - naturally accelerates the landfill degradation by pumping controlled amounts of air and water into the refuse itself.

 

According to the data OEM has collected so far, the bioreactor will break down and settle the refuse, as well as eliminating the landfill’s natural methane production, in about 40 months. The end result: Composted land, ready for development.

 

Not only that, Tucson’s bioreactor has proven safe and cost-effective. Most importantly, it works. So well, that it's being made into a full-scale system for use on all three landfills.

HONG KONG>>>>Sky Scraper...

Scrapers on the floor of the barn periodically push manure towards the end of the alley.

S-11E series B self elevating motor scraper. Full Size.

The 26th Annual Crankup Day was held at Edendale during the weekend of 25th- 27th January 2013. The main theme was Fords of all types, it was held over three days of glorious weather. Southland, New Zealand.

**** I introduce my photo books. See my profile below. ****

**** 写真集のご紹介。詳細は下記Profileへ。 ****

**** [My profile] ****

Closeup of the front section of the 631G...

Seen working on the Highway 41 project in Oshkosh, WI on June 28, 2011. This portion of the project includes a new interchange between HY41 and HY45 just north of Lake Butte de Morts.

 

Copyright

All my photographic images are copyrighted. All rights are reserved. Please do not use, copy or edit any of my photographs without my written permission. If you want to use my photo for commercial or private use, please contact me.

 

Exif data auto added by theGOOD Uploadr

File Size : 1.1 mb

Camera Make : Canon

Camera Model : Canon EOS 50D

Software : Adobe Photoshop CS2 Windows

Shrewsbury

 

Yashica FR1, 35mm F/2.8 Carl Zeiss Distagon lens, Ilford HP5

Terminar Tower is no longer the tallest building in Cleveland, but remains one of its symbols. This building, similar in style to Stalin's skysrcapers, combines offices, a hotel, a shopping center, and even a station of Cleveland's subway.

 

Небоскрёб Терминал-Таур не является уже самым высоким зданием Кливленда, но остаётся одним из символов города. Похожий по стилю на сталинские высотки, Терминал-Тауэр совмещает оффисы, гостиницу, торговый центр и даже станцию кливлендского метро.

Photo prise à Retro-machine 2009 à Cordelle (42) Hayes69

From the pages of my 1974 edition of "THE BIG BOOK of REAL BUILDING & WRECKING MACHINES" Illustration by George J. Zaffo.

A Slusher Scraper on display at The Willet Green Miller Memorial Site - Site No.14 in the Town of Cobalt in Coleman Township in the District of Timiskaming Northeastern Ontario Canada

Brownfields Weekly

 

It’s a short ride on a sunny, arid morning down Congress Street in downtown Tucson, Arizona, to the dusty field that’s home to the Rio Nuevo landfills.

 

Right now, Nearmont, the smallest of three landfills on the site, doesn’t look at all like one. It’s just a bumpy 90-acre stretch of wide-open, dusty land beneath the shadow of downtown’s skyscrapers and against the bone-dry Santa Cruz River.

 

Drive back about 1,000 feet on the utility road, and you’ll see a chain link fence with an open gate. The chain link surrounds a square plot of land, fifty feet long and wide. On the plot at exact intervals is a nine-point grid of PVC piping penetrating the landfill beneath. A small construction trailer sits against the fence. And across from that, a large utility box, wires running into the ground.

 

To the untrained eye, it looks to be nothing more than a Tucson city water experiment. Or to the more suspicious in the desert, a covert government project. But this experimental PVC pipe grid - and what it’s doing underneath the landfill - could change the way brownfields sites of tomorrow are remediated.

 

Past, Future and Present

 

Behind the chain link fence is the City of Tucson’s bioreactor project. It is the physical beginning of a monumental and aggressive brownfields land remediation and redevelopment project. The landfill will become part of Rio Nuevo - an entire city district in the heart of Tucson’s downtown.

 

Projected, Rio Nuevo will take at least 20 years and $350 million to complete. The new bioreactor technology on Nearmont is paving the way for the Rio Nuevo of the future: an entire city district that will pay homage to the city’s historic past as one of the oldest settlements in the West.

 

In fact, archeologists have found that people have lived in the Tucson area as far back as 2,600 years ago. What’s now Nearmont was once part of the land where the San Augustin Mission was established in mid 1700s. The old Mission included a convento - a priest’s residence and trade school - a mission garden, a chapel, a granary and smaller storage buildings, the entire grounds surrounded by a wall. By 1840, the Mission had finally been abandoned.

 

As the Mission ruins disappeared into the late 1800s and early 1900s, the site became home to a clay pit. That ceased operations for good in the 1940’s, until it became its final incarnation: a 1950’s-era city dump. For twelve years, the site saw the only the city’s trash, until it was closed and forgotten in 1962. Thirty-seven years passed until Rio Nuevo had its rebirth.

 

In November of 1999, Tucson politicians put Proposition 400 in front of the voters - its purpose to raise $60 million in Arizona state tax money over ten years to help fund the Rio Nuevo project. It passed by a convincing 62% margin.

 

Among the planned projects at Rio Nuevo are a full-scale recreation of the San Augustin Mission and adjoining Cultural Plaza. Also planned are an Arizona Historical Museum, an American Indian Cultural Center and a Mercado with retail stores. More downtown housing will be added. Future additions include the Sonoran Sea Aquarium, the Tucson Science Center, an IMAX Theatre, an expanded Tucson Convention Center, and a City Visitor’s Center.

 

But the completed vision of Rio Nuevo is some years away. What Rio Nuevo has now is what’s behind the chain link fence - the experimental bioreactor.

 

100 Years in 40 Months

 

Underneath the Nearmont landfills lie decades of Tucson refuse. Between 15 and 50 feet of it.

 

The problem: the trash beneath the landfill must be degraded and made non-reactive. That, added with the methane gas landfills naturally produce make it too undesirable for building. Otherwise, any construction on the land would be at least century away - the time it would take the garbage in Nearmont to degrade naturally.

 

Tucson’s Office of Environmental Management (OEM), however, was preparing a solution - the bioreactor. But remediation technology like it had never been used before. If it did work, and proved safe and cost-effective, it would be used to remediate the other landfills.

 

The process it performs is called enhanced aerobic degradation. Simply, the nine-spot PVC pipe grid - dug under the ground and inside the landfill - naturally accelerates the landfill degradation by pumping controlled amounts of air and water into the refuse itself.

 

According to the data OEM has collected so far, the bioreactor will break down and settle the refuse, as well as eliminating the landfill’s natural methane production, in about 40 months. The end result: Composted land, ready for development.

 

Not only that, Tucson’s bioreactor has proven safe and cost-effective. Most importantly, it works. So well, that it's being made into a full-scale system for use on all three landfills.

This section of East Liverpool Ohio could be passed off as the Northside of Pittsburgh both Structurally as well as sociologically

Unloading the hopper...

Seen working on the Highway 41 project in Oshkosh, WI on June 28, 2011. This portion of the project includes a new interchange between HY41 and HY45 just north of Lake Butte de Morts.

 

Copyright

All my photographic images are copyrighted. All rights are reserved. Please do not use, copy or edit any of my photographs without my written permission. If you want to use my photo for commercial or private use, please contact me.

 

Exif data auto added by theGOOD Uploadr

File Size : 0.7 mb

Camera Make : Canon

Camera Model : Canon EOS 50D

Software : Adobe Photoshop CS2 Windows

Scraping coconut with a traditional coconut scraper is the best way to do it! I tried all the other gadgets. None of them do as good as this one does! It is a also learnt behaviour from grown ups around you like most of the cooking techniques!

Rock Nights with two locas in the cantera of a place del cual no quiero acordarme...!!

Yeahhhhhhhhh!

 

Photo prise à Retro-machine 2009 à Cordelle (42) Hayes69

www.quarryspareparts.com/spare-parts/conveyor-spare-parts...

Belt scraper is a robust cleaning unit, featuring durability, easy maintenance and high cleaning efficiency. The multiple-cleaner system is now the standard for applications on belt conveyors carrying all types of bulk materials around the world. End-users (and other cleaner manufacturers) have accepted it almost universally.

Still going with these things.

No flowers, here. The sharp edge of an incubus.

Since we were staying not too far, we decided to visit the town of Wildwood. Despite the name, it was pretty tame and quiet.

Seen at the under-construction interchange between Highway 41 and Highway 45 in Oshkosh, WI. June 20, 2011.

 

single engined antique rental scraper hired in after stations mobiles went o.o.s. Oddie was the driver

"The Apuan Alps above Carrara show evidence of at least 650 quarry sites, with about half of them currently abandoned or worked out. The Carrara quarries have produced more marble than any other place on earth."

U.S 169 project Miami County, Kansas. Hamm Construction, Perry, KS

1 2 ••• 19 20 22 24 25 ••• 79 80