View allAll Photos Tagged powergrids

Hoover Dam, also known as Boulder Dam, is a concrete gravity-arch dam in the Black Canyon of the Colorado River, on the border between the U.S. states of Arizona and Nevada. The dam, located 30 miles (48 km) southeast of Las Vegas, is named after Herbert Hoover, who played an instrumental role in its construction, first as Secretary of Commerce and then later as President of the United States. Construction began in 1931 and was completed in 1935, over two years ahead of schedule. The dam and the power plant are operated by the Bureau of Reclamation of the U.S. Department of the Interior. Listed on the National Register of Historic Places in 1981, Hoover Dam was designated a National Historic Landmark in 1985.

  

5 October 2013. Electricity pylons are seen in the Bangladesh-India Power Transmission Centre funded by Asian Development Bank in Bheramara of Kushtia, Bangladesh.

 

Read more on:

Project: www.adb.org/projects/42378-015/main

Bangladesh: www.adb.org/bangladesh

Energy: www.adb.org/energy

Creative Commons - 2014-06-21 - IMG#06-003146

 

Wind turbines on a hilltop generate electricity for California

 

You are free to download and use this image as long as you adhere to the creative Commons licensing AND credit me, the owner and photographer of the images. Please contact me first before using an image in printed form. Please credit as:

"Image of [subject matter] BY HomeAndGardners.com - CC BY"

  

More CC images are available on my website: www.homeandgardners.com/Creative-Commons-Video-Footage/Cr...

5 October 2013. Electricity pylons are seen in the Bangladesh-India Power Transmission Centre funded by Asian Development Bank in Bheramara of Kushtia, Bangladesh.

 

Read more on:

Bangladesh

Energy

Power System Expansion and Efficiency Improvement Investment Program - Tranche 1

Westchester Avenue near the Bronx River.

The Hyderabad Metro is a rapid transit system, serving the city of Hyderabad, Telangana, India. It is in Secant Operational model. It is being implemented entirely on public-private partnership (PPP) basis, with the state government holding a minority equity stake. A 30 km stretch from Miyapur to Nagole, having 24 stations was inaugurated on 28 November 2017 by Prime Minister Narendra Modi. No other rapid transit metro service in India opened for public operations on such a long stretch of 30 km. As of October 2018, it is the second longest operational metro network in India after the Delhi Metro, after a 16 km stretch between Ameerpet-LB Nagar Metro route was opened on 24 September 2018. It is estimated to cost ₹18,800 crore (US$2.6 billion). As of October 2018, about 200,000 people use the Metro per day. Trains are now crowded during the morning and evening hours, when employees travel to and from work. A ladies only coach was introduced on all the trains from 7 May 2018.

 

HISTORY

To respond the rising public transport needs and mitigate escalating vehicular traffic in the twin-cities of Hyderabad and Secunderabad, the State Government and the South Central Railway jointly launched the Multi Modal Transport System (MMTS) in [August] 2003. The increase in population of Hyderabad made MMTS alone insufficient for public transport, which led to Union Ministry of Urban Development giving the nod for the Hyderabad Metro Rail Project and directed the DMRC to conduct a survey on the project.[ this project was seen necessary in view that the population of Hyderabad was forecasted to reach 13.6 million by the year 2021. According to the initial plan, the metro was to be connected with the already existing MMTS to provide commuters with alternate modes of transport. Simultaneously, the proposals for taking up the construction of MMTS Phase-II were also taken forward.

 

On March 26, 2018, Telangana Govt announced that it would set up a SPV "Hyderabad Airport Metro Limited (HAML)", jointly promoted by HMRL and HMDA, to extend the Blue line from Raidurg to Rajiv Gandhi International Airport, Shamshabad.

 

INITIAL BIDDING

The bidding process was completed by July 2008 and awarded to Maytas which failed to achieve financial closure for the project as per schedule By March 2009. In July 2009, the State Government cancelled the contract and called for fresh bids for the project.

 

RE-BIDDING

In the July-2010 rebidding process, Larsen & Toubro (L&T) emerged as the lowest bidder for the ₹121.32 billion (US$1.7 billion) project. L&T came forward to take up the work for about ₹14.58 billion (US$200 million) as viability gap funding as against the sanctioned ₹48.53 billion (US$680 million).

 

MASCOT

The mascot of Hyderabad Metro Rail is Niz. It was derived from the word Nizam, who ruled the princely state of Hyderabad.

 

AWARDS AND NOMINATIONS

HMR project was showcased as one of the top 100 strategic global infrastructure projects at the Global Infrastructure Leadership Forum held in New York during February–March 2013.

 

L&T Metro Rail Hyderabad Limited (LTMRHL) has been conferred the SAP ACE Award 2015 in the 'Strategic HR and Talent Management category.

 

In 2018, Rasoolpura, Paradise and Prakash Nagar metro stations were awarded Indian Green Building Council’s (IGBC) Green MRTS Platinum Award.

 

CONSTRUCTION HISTORY

Groundbreaking (Bhoomi Puja) for the project was conducted on 26 April 2012 the concessionaire started the pillar erection on the same day for Stage-I and on 6 June 2012 for Stage-II. The work for Corridor 2 has been delayed due to traders in Koti and Sultan Bazar demanding realignment of the route to safeguard traders and old age heritage markets. If the recent bill proposed in Parliament which allows construction within a 100 metre radius of heritage structures and sites of historical or archaeological importance is passed, Metro might receive a chance as it helps to connect the Old city with IT corridor.

 

The construction of the entire 71.16 km has been split into 6 stages with the first stage originally scheduled to be completed by March 2015.

 

In November 2013, L&T Hyderabad Metro started laying of rails on the metro viaduct between Nagole and Mettuguda, a stretch of 8 km.

 

The first highly sophisticated train of the Hyderabad Metro Rail (HMR) came from Korea during the third week of May 2014. Stringent trial runs commenced from June 2014 till February 2015. The trial runs started on the Miyapur to Sanjeeva Reddy Nagar stretch in October 2015.

 

CMRS inspection for Stage-II (Miyapur and S.R.Nagar Section) was done on 9, 10 August 2016. Three interchanges are planned at Mahatma Gandhi Bus Terminus, Parade Grounds and Ameerpet.

 

The steel bridge of the HMR was successfully placed over the Oliphant bridge in August 2017.

 

In November 2017, Commissioner of Railway Safety (CMRS) granted safety approval for 12 km stretch from Miyapur to SR Nagar, 10 km stretch from SR Nagar to Mettuguda and 8 km stretch from Nagole to Mettuguda.

 

Ameerpet-LB Nagar Metro stretch is open for commercial operations from 24 September 2018.

 

CONSTRUCTION PHASES

The construction work was undertaken in two phases. There are six stages of completion in Phase I

 

PHASE I

The Phase I of the project includes 3 lines covering a distance of around 72 km. The metro rail stretches between Nagole and Secunderabad 11 km originally scheduled to be operational by December 2015, is now partially operational since 29 November 2017. The entire 72 km 57-station first phase is due to be completed by December 2019 with Hitec City - Raidurg line and MGBS - Falaknuma line is scheduled to be completed by December 2019.

 

Line 1 - Red Line - Miyapur – L B Nagar - 29.2 km

Line 2 - Green Line - JBS - Falaknuma 15 km

Line 3 - Blue Line - Nagole – Raidurg - 28 km

 

PHASE II

The Government is planning second phase of metro rail extending further. The construction of Phase II will be taken up solely by the state government, instead of public private partnership (PPP) mode in Phase I. Delhi Metro Rail Corporation (DMRC) was entrusted to give a detailed project report (DPR) for Phase II. Metro Rail Phase II expansion plan is for about 60 km, which includes providing link to Shamshabad RGI Airport.

 

LINES

Since the first version of the plans, the three corridors mostly remained the same, but minor changes were introduced. These include the lack of stop at Lalaguda, or a stop at Lakdikapul instead of Secretariat. Also, the lines have been marked with several different combination of color. Ameerpet- LB Nagar metro stretch opened on 24 September 2018. HiTec City to Raidurg, 1.5-kilometre stretch on Corridor Three - Nagole to Raidurg, is scheduled to be completed in November 2019, as it involves construction of 49 pillars and the Raidurg terminal station. Efforts are being made to complete the 8.5-km stretch from Ameerpet to HiTec City by December 2018.

 

RECEPTION

The Metro has opened to overwhelming response, with over 200,000 people using it on Day 1. On the first Sunday of operations, the Metro was used by 240,000 people.. As of September 2018, the daily ridership was about 2,00,000.

 

Trains are initially being operated at a frequency of 3.5 minutes in very peak hours and every 6.5 minutes in peak hours (between Miyapur-Ameerpet) and 6.5 minutes in peak hours (between Ameerpet-Nagole),, though maximum achievable frequency is every 90 seconds. Similarly, three-car trains are being used currently, though it is planned to use six-car trains in the future.

 

In December 2017, Hyderabad Metro Rail launched its mobile app, TSavaari. Hyderabad Metro timings are available on T-Savari app. Ola Cabs and Uber tied up its services with app.

 

COST

The initial official estimated cost of the 72 km long Metro project stood at ₹14,132 crore (US$2.0 billion). The Central Government decided to bear 10% of it, while L&T was to bear the remaining 90% of the cost. The construction work which was supposed to commence on 3 March 2011 commenced in 2012. In March 2012, the cost of the project was revised upwards to ₹15,957 crore (US$2.2 billion). This has been further revised upwards to ₹18,800 crore (US$2.6 billion) (as of November 2017).

 

INFRASTRUCTURE

The 71.3 km standard-gauge network will feature ballastless track throughout and will be electrified at 25kV ac 50 Hz. An operations control centre and depot are constructed at Uppal. At some places, a flyover, underpass and metro has been constructed at the same place, as part of Strategic road development plan (SRDP).

 

CBTC TECHNOLOGY

At the end of 2012, L&T Metro Rail awarded Thales a Rs 7.4bn ($US 134m) contract to provide CBTC and integrated telecommunications and supervision systems on all three lines. Thales will supply its SelTrac CBTC technology, and trains will initially run in automatic train operation mode with minimum headways of 90 seconds, although the system will support eventual migration to unattended train operation (UTO).

 

ROLLING STOCK

On 12 September 2012, Larsen and Toubro Metro Rail Hyderabad Ltd (LTMRHL) announced that it has awarded tender for supply of rolling stock to Hyundai Rotem. The ₹18 billion (US$250 million) tender is for 57 trains consisting of 171 cars which will be delivered in phases at least 9 months before the commencement of each stage. On 2 October 2013, LTMRHL unveiled its train car for Hyderabad Metro. A model coach which is half the size of the actual coach, was on public display at Necklace Road on the banks of Hussain Sagar in the heart of Hyderabad. The trains will be 3.2m wide and 4m high. There will be 4 doors on each side of each coach.

 

On 10 April 2014, the first metro train for HMR rolled out of Hyundai Rotem factory at Changwon in South Korea and reached Hyderabad in May 2014. On 31 December 2014, Hyderabad Metro Rail successfully conducted a training run in Automatic Train Operation (ATO) mode for the first time between Nagole and Mettuguda.

 

TICKETING

The L&T Hyderabad project will have an automated ticketing system with features such as contactless smart card based ticketing, slim automatic gates, payment by cash and credit/debit card, passenger operated ticket vending machine and provision of common ticketing system. It will also have a provision of NFC-based technology to enable usage of mobile phones as fare media and high performance machine to avoid long queues. Samsung Data Systems India, a subsidiary of South Korean firm Samsung, has been awarded the automatic fare collection system package for the L&T metro rail project. The package involves design, manufacture, supply, installation, testing and commissioning of the system.

 

Official ticket prices were announced on 25 November 2017. The base fare is ₹10 for up to 2 km and going to slap 10 with ₹60 for more than 26 km.

 

STATIONS

Hyderabad metro will have 64 stations in phase I. They will be provided with amenities such as escalators and elevators to reach the stations, announcement boards, electronic display systems among others for passengers. Commercial will also be provided on stations. Hyderabad metro stations will also have service roads underneath them to provide last mile connectivity by allowing other public transportation systems use it for dropping/picking passengers right in front of the stations and ensure uninterrupted traffic. Currently the service lane works are currently on at Nagole and Uppal stations. The signboards of Hyderabad Metro are displayed in Telugu, English, Hindi and Urdu at metro stations.

 

Otis Elevator Company of United States won the contract to supply and maintain 670 elevators.

 

In May 2018, L&T Metro Rail announced that it had signed a contract with Powergrid Corporation of India to install electric vehicle charging facilities at all metro stations beginning with Miyapur and Dr. B R Ambedkar Balanagar stations. L&THMRL has setup free wifi access units for commuters at Miyapur, Ameerpet and Nagole metro stations, in association with ACT Fibernet, as part of a pilot project.

 

WIKIPEDIA

Luke Yates, left, a Sandia National Laboratories electrical engineer, passes Jack Flicker, a grid resiliency expert, a gallium nitride wafer with an array of diodes that can shunt a record-breaking 6,400 volts of electricity within a few billionths of a second – a significant step towards protecting the nation’s electric grid from an electromagnetic pulse.

 

Learn more at bit.ly/3q8Vpyi

 

Photo by Rebecca Gustaf

So apparently there's a B&W photo challenge going around on Facebook now and because AuroraLee is mean, she challenged me to it - 5 days of B&W photos.

 

I haven't been shooting much, so it's a kick in the pants to do something, but I'm scratching my head trying to think of ideas.

 

Here's a revisitation of my old makeshift shoe commercial setup, this time featuring my smokin' SAUCONY POWERGRID RIDE6 runners (...that I used for walking. I do not run). It's all lightpainted using an iPhone to highlight the shoe and the iPad to project stripes through the background.

The monsoonal heatwave continues, which means daily emails announcing yet another Power Saver Rewards event between 4 p.m. and 8:59 p.m. PDT: “You can support the California energy grid, and earn $2/kWh for energy use below your typical use, too. The more energy you can save, the more you can earn”. Really?

 

We don’t have air conditioning, electric vehicle, or in-apartment laundry—all of which are on the curtail-usage list. We never use the dishwasher. But we do have four fans running constantly. I don’t know whether to thank the utility for magnanimously managing the electric grid or San Deigans for being good neighbors and cutting back—perhaps both.

 

Whomever deserves praise, I pause to offer it. For I honestly expected some sort of power outage by now—and who knows, one may come when the temperature peaks again in a few days, assuming weather forecasts prove to be accurate.

 

With that introduction, this electrical substation is located along Adams Avenue, here in University Heights, and hugs Florida on one side and the alley separating Alabama on the other.

 

Besides bodily discomfort, we suffer some other minor heat nuisances. Two that stand out: Fan noise so loud that watching television is pointless (not bad) and ants uncharacteristically invading the bathroom and my office (not good)—in search of what is a mystery, as no food is stored or consumed in either space.

Duke Energy - Progress Energy Carolinas coal burning power plant with coal ash ponds at Lake Julian in Arden, North Carolina - © 2013 David Oppenheimer - Performance Impressions Photography Archives

It is turbo-charged and roars like a beast. It is a clubman with 3 and half door. A suicide door I call it. I have been busy preparing him for Christmas of late adding and taking out parts... It now has a new air intake with intercooler with new gauges and spots union jack scuttles on the sides... Anyway heres the big plan:

 

Forge Intercooler

NM cold air intake

NM air charge pipe (in/out)

NM Turbo heat shield

Craven gauges with dual flexpod

JCW strut bar

JCW exos

Powergrid swaybar endlinks (front/rear)

Brembo JCW big brakes

Plasma direct Ignition coil upgrade

Plasma ground ignition upgrade

Sprint Booster

ECU stage 1 tune

 

End of the day should be 200+ hp with super respond. wow!

5 October 2013. Electricity pylons are seen in the Bangladesh-India Power Transmission Centre funded by Asian Development Bank in Bheramara of Kushtia, Bangladesh.

 

Read more on:

Project: www.adb.org/projects/42378-015/main

Bangladesh: www.adb.org/bangladesh

Energy: www.adb.org/energy

www.redcarpetreporttv.com

 

Mingle Media TV and Red Carpet Report host Cathy Kelley were invited to cover TheWrap.com's 5th Annual Pre-Oscar Event at Culina inside the Four Seasons Hotel in Beverly Hills. This event is hosted by CEO & Editor-in-Chief, Sharon Waxman who welcomes Oscar nominees and Hollywood notables to celebrate Awards Season and the Oscars.

 

Get the Story from the Red Carpet Report Team, follow us on Twitter and Facebook at:

twitter.com/TheRedCarpetTV

www.facebook.com/RedCarpetReportTV

www.redcarpetreporttv.com

www.youtube.com/MingleMediaTVNetwork

ABOUT THEWRAP.COM

The Wrap News Inc., has established itself as the leading news organization covering the business of entertainment and media. The Wrap News Inc. is comprised of TheWrap,PowerGrid, PowerGrid Pro and TheGrill. The Wrap News, Inc. is backed by Maveron, a venture capital firm co-founded by Starbucks CEO Howard Schultz and Dan Levitan.

 

For more of Mingle Media TV’s Red Carpet Report coverage, please visit our website and follow us on Twitter and Facebook here:

www.minglemediatv.com

www.facebook.com/minglemediatvnetwork

www.flickr.com/MingleMediaTVNetwork

www.twitter.com/minglemediatv

Follow our host Cathy Kelley on Twitter at twitter.com/CatherineKelley

 

This is part of the Georgia electrical grid.

Wind turbines on a hilltop generate electricity for California

 

Creative Commons - 2014-06-21 - IMG#06-003145

 

You are free to download and use this image as long as you adhere to the creative Commons licensing AND credit me, the owner and photographer of the images. Please contact me first before using an image in printed form. Please credit as:

"Image of [subject matter] BY HomeAndGardners.com - CC BY"

  

More CC images are available on my website: www.homeandgardners.com/Creative-Commons-Video-Footage/Cr...

Taken at Latitude/Longitude:24.568659/80.715019. km (Map link)

www.redcarpetreporttv.com

 

Mingle Media TV and Red Carpet Report host Cathy Kelley were invited to cover TheWrap.com's 5th Annual Pre-Oscar Event at Culina inside the Four Seasons Hotel in Beverly Hills. This event is hosted by CEO & Editor-in-Chief, Sharon Waxman who welcomes Oscar nominees and Hollywood notables to celebrate Awards Season and the Oscars.

 

Get the Story from the Red Carpet Report Team, follow us on Twitter and Facebook at:

twitter.com/TheRedCarpetTV

www.facebook.com/RedCarpetReportTV

www.redcarpetreporttv.com

www.youtube.com/MingleMediaTVNetwork

ABOUT THEWRAP.COM

The Wrap News Inc., has established itself as the leading news organization covering the business of entertainment and media. The Wrap News Inc. is comprised of TheWrap,PowerGrid, PowerGrid Pro and TheGrill. The Wrap News, Inc. is backed by Maveron, a venture capital firm co-founded by Starbucks CEO Howard Schultz and Dan Levitan.

 

For more of Mingle Media TV’s Red Carpet Report coverage, please visit our website and follow us on Twitter and Facebook here:

www.minglemediatv.com

www.facebook.com/minglemediatvnetwork

www.flickr.com/MingleMediaTVNetwork

www.twitter.com/minglemediatv

Follow our host Cathy Kelley on Twitter at twitter.com/CatherineKelley

 

The Hyderabad Metro is a rapid transit system, serving the city of Hyderabad, Telangana, India. It is in Secant Operational model. It is being implemented entirely on public-private partnership (PPP) basis, with the state government holding a minority equity stake. A 30 km stretch from Miyapur to Nagole, having 24 stations was inaugurated on 28 November 2017 by Prime Minister Narendra Modi. No other rapid transit metro service in India opened for public operations on such a long stretch of 30 km. As of October 2018, it is the second longest operational metro network in India after the Delhi Metro, after a 16 km stretch between Ameerpet-LB Nagar Metro route was opened on 24 September 2018. It is estimated to cost ₹18,800 crore (US$2.6 billion). As of October 2018, about 200,000 people use the Metro per day. Trains are now crowded during the morning and evening hours, when employees travel to and from work. A ladies only coach was introduced on all the trains from 7 May 2018.

 

HISTORY

To respond the rising public transport needs and mitigate escalating vehicular traffic in the twin-cities of Hyderabad and Secunderabad, the State Government and the South Central Railway jointly launched the Multi Modal Transport System (MMTS) in [August] 2003. The increase in population of Hyderabad made MMTS alone insufficient for public transport, which led to Union Ministry of Urban Development giving the nod for the Hyderabad Metro Rail Project and directed the DMRC to conduct a survey on the project.[ this project was seen necessary in view that the population of Hyderabad was forecasted to reach 13.6 million by the year 2021. According to the initial plan, the metro was to be connected with the already existing MMTS to provide commuters with alternate modes of transport. Simultaneously, the proposals for taking up the construction of MMTS Phase-II were also taken forward.

 

On March 26, 2018, Telangana Govt announced that it would set up a SPV "Hyderabad Airport Metro Limited (HAML)", jointly promoted by HMRL and HMDA, to extend the Blue line from Raidurg to Rajiv Gandhi International Airport, Shamshabad.

 

INITIAL BIDDING

The bidding process was completed by July 2008 and awarded to Maytas which failed to achieve financial closure for the project as per schedule By March 2009. In July 2009, the State Government cancelled the contract and called for fresh bids for the project.

 

RE-BIDDING

In the July-2010 rebidding process, Larsen & Toubro (L&T) emerged as the lowest bidder for the ₹121.32 billion (US$1.7 billion) project. L&T came forward to take up the work for about ₹14.58 billion (US$200 million) as viability gap funding as against the sanctioned ₹48.53 billion (US$680 million).

 

MASCOT

The mascot of Hyderabad Metro Rail is Niz. It was derived from the word Nizam, who ruled the princely state of Hyderabad.

 

AWARDS AND NOMINATIONS

HMR project was showcased as one of the top 100 strategic global infrastructure projects at the Global Infrastructure Leadership Forum held in New York during February–March 2013.

 

L&T Metro Rail Hyderabad Limited (LTMRHL) has been conferred the SAP ACE Award 2015 in the 'Strategic HR and Talent Management category.

 

In 2018, Rasoolpura, Paradise and Prakash Nagar metro stations were awarded Indian Green Building Council’s (IGBC) Green MRTS Platinum Award.

 

CONSTRUCTION HISTORY

Groundbreaking (Bhoomi Puja) for the project was conducted on 26 April 2012 the concessionaire started the pillar erection on the same day for Stage-I and on 6 June 2012 for Stage-II. The work for Corridor 2 has been delayed due to traders in Koti and Sultan Bazar demanding realignment of the route to safeguard traders and old age heritage markets. If the recent bill proposed in Parliament which allows construction within a 100 metre radius of heritage structures and sites of historical or archaeological importance is passed, Metro might receive a chance as it helps to connect the Old city with IT corridor.

 

The construction of the entire 71.16 km has been split into 6 stages with the first stage originally scheduled to be completed by March 2015.

 

In November 2013, L&T Hyderabad Metro started laying of rails on the metro viaduct between Nagole and Mettuguda, a stretch of 8 km.

 

The first highly sophisticated train of the Hyderabad Metro Rail (HMR) came from Korea during the third week of May 2014. Stringent trial runs commenced from June 2014 till February 2015. The trial runs started on the Miyapur to Sanjeeva Reddy Nagar stretch in October 2015.

 

CMRS inspection for Stage-II (Miyapur and S.R.Nagar Section) was done on 9, 10 August 2016. Three interchanges are planned at Mahatma Gandhi Bus Terminus, Parade Grounds and Ameerpet.

 

The steel bridge of the HMR was successfully placed over the Oliphant bridge in August 2017.

 

In November 2017, Commissioner of Railway Safety (CMRS) granted safety approval for 12 km stretch from Miyapur to SR Nagar, 10 km stretch from SR Nagar to Mettuguda and 8 km stretch from Nagole to Mettuguda.

 

Ameerpet-LB Nagar Metro stretch is open for commercial operations from 24 September 2018.

 

CONSTRUCTION PHASES

The construction work was undertaken in two phases. There are six stages of completion in Phase I

 

PHASE I

The Phase I of the project includes 3 lines covering a distance of around 72 km. The metro rail stretches between Nagole and Secunderabad 11 km originally scheduled to be operational by December 2015, is now partially operational since 29 November 2017. The entire 72 km 57-station first phase is due to be completed by December 2019 with Hitec City - Raidurg line and MGBS - Falaknuma line is scheduled to be completed by December 2019.

 

Line 1 - Red Line - Miyapur – L B Nagar - 29.2 km

Line 2 - Green Line - JBS - Falaknuma 15 km

Line 3 - Blue Line - Nagole – Raidurg - 28 km

 

PHASE II

The Government is planning second phase of metro rail extending further. The construction of Phase II will be taken up solely by the state government, instead of public private partnership (PPP) mode in Phase I. Delhi Metro Rail Corporation (DMRC) was entrusted to give a detailed project report (DPR) for Phase II. Metro Rail Phase II expansion plan is for about 60 km, which includes providing link to Shamshabad RGI Airport.

 

LINES

Since the first version of the plans, the three corridors mostly remained the same, but minor changes were introduced. These include the lack of stop at Lalaguda, or a stop at Lakdikapul instead of Secretariat. Also, the lines have been marked with several different combination of color. Ameerpet- LB Nagar metro stretch opened on 24 September 2018. HiTec City to Raidurg, 1.5-kilometre stretch on Corridor Three - Nagole to Raidurg, is scheduled to be completed in November 2019, as it involves construction of 49 pillars and the Raidurg terminal station. Efforts are being made to complete the 8.5-km stretch from Ameerpet to HiTec City by December 2018.

 

RECEPTION

The Metro has opened to overwhelming response, with over 200,000 people using it on Day 1. On the first Sunday of operations, the Metro was used by 240,000 people.. As of September 2018, the daily ridership was about 2,00,000.

 

Trains are initially being operated at a frequency of 3.5 minutes in very peak hours and every 6.5 minutes in peak hours (between Miyapur-Ameerpet) and 6.5 minutes in peak hours (between Ameerpet-Nagole),, though maximum achievable frequency is every 90 seconds. Similarly, three-car trains are being used currently, though it is planned to use six-car trains in the future.

 

In December 2017, Hyderabad Metro Rail launched its mobile app, TSavaari. Hyderabad Metro timings are available on T-Savari app. Ola Cabs and Uber tied up its services with app.

 

COST

The initial official estimated cost of the 72 km long Metro project stood at ₹14,132 crore (US$2.0 billion). The Central Government decided to bear 10% of it, while L&T was to bear the remaining 90% of the cost. The construction work which was supposed to commence on 3 March 2011 commenced in 2012. In March 2012, the cost of the project was revised upwards to ₹15,957 crore (US$2.2 billion). This has been further revised upwards to ₹18,800 crore (US$2.6 billion) (as of November 2017).

 

INFRASTRUCTURE

The 71.3 km standard-gauge network will feature ballastless track throughout and will be electrified at 25kV ac 50 Hz. An operations control centre and depot are constructed at Uppal. At some places, a flyover, underpass and metro has been constructed at the same place, as part of Strategic road development plan (SRDP).

 

CBTC TECHNOLOGY

At the end of 2012, L&T Metro Rail awarded Thales a Rs 7.4bn ($US 134m) contract to provide CBTC and integrated telecommunications and supervision systems on all three lines. Thales will supply its SelTrac CBTC technology, and trains will initially run in automatic train operation mode with minimum headways of 90 seconds, although the system will support eventual migration to unattended train operation (UTO).

 

ROLLING STOCK

On 12 September 2012, Larsen and Toubro Metro Rail Hyderabad Ltd (LTMRHL) announced that it has awarded tender for supply of rolling stock to Hyundai Rotem. The ₹18 billion (US$250 million) tender is for 57 trains consisting of 171 cars which will be delivered in phases at least 9 months before the commencement of each stage. On 2 October 2013, LTMRHL unveiled its train car for Hyderabad Metro. A model coach which is half the size of the actual coach, was on public display at Necklace Road on the banks of Hussain Sagar in the heart of Hyderabad. The trains will be 3.2m wide and 4m high. There will be 4 doors on each side of each coach.

 

On 10 April 2014, the first metro train for HMR rolled out of Hyundai Rotem factory at Changwon in South Korea and reached Hyderabad in May 2014. On 31 December 2014, Hyderabad Metro Rail successfully conducted a training run in Automatic Train Operation (ATO) mode for the first time between Nagole and Mettuguda.

 

TICKETING

The L&T Hyderabad project will have an automated ticketing system with features such as contactless smart card based ticketing, slim automatic gates, payment by cash and credit/debit card, passenger operated ticket vending machine and provision of common ticketing system. It will also have a provision of NFC-based technology to enable usage of mobile phones as fare media and high performance machine to avoid long queues. Samsung Data Systems India, a subsidiary of South Korean firm Samsung, has been awarded the automatic fare collection system package for the L&T metro rail project. The package involves design, manufacture, supply, installation, testing and commissioning of the system.

 

Official ticket prices were announced on 25 November 2017. The base fare is ₹10 for up to 2 km and going to slap 10 with ₹60 for more than 26 km.

 

STATIONS

Hyderabad metro will have 64 stations in phase I. They will be provided with amenities such as escalators and elevators to reach the stations, announcement boards, electronic display systems among others for passengers. Commercial will also be provided on stations. Hyderabad metro stations will also have service roads underneath them to provide last mile connectivity by allowing other public transportation systems use it for dropping/picking passengers right in front of the stations and ensure uninterrupted traffic. Currently the service lane works are currently on at Nagole and Uppal stations. The signboards of Hyderabad Metro are displayed in Telugu, English, Hindi and Urdu at metro stations.

 

Otis Elevator Company of United States won the contract to supply and maintain 670 elevators.

 

In May 2018, L&T Metro Rail announced that it had signed a contract with Powergrid Corporation of India to install electric vehicle charging facilities at all metro stations beginning with Miyapur and Dr. B R Ambedkar Balanagar stations. L&THMRL has setup free wifi access units for commuters at Miyapur, Ameerpet and Nagole metro stations, in association with ACT Fibernet, as part of a pilot project.

 

WIKIPEDIA

Taken at Latitude/Longitude:24.580618/80.720174. km (Map link)

Georgia Power's Plant Jack McDonough, a coal fired steam powered generator. Georgia Power is planning on converting this station over to natural gas. At the moment, if you live in the area, you're familiar with the constant freight trains bringing coal to the facility.

 

I think power plants look pretty cool.

Duke Energy - Progress Energy Carolinas coal burning power plant with coal ash ponds at Lake Julian in Arden, North Carolina - © 2013 David Oppenheimer - Performance Impressions Photography Archives

www.redcarpetreporttv.com

 

Mingle Media TV and Red Carpet Report host Cathy Kelley were invited to cover TheWrap.com's 5th Annual Pre-Oscar Event at Culina inside the Four Seasons Hotel in Beverly Hills. This event is hosted by CEO & Editor-in-Chief, Sharon Waxman who welcomes Oscar nominees and Hollywood notables to celebrate Awards Season and the Oscars.

 

Get the Story from the Red Carpet Report Team, follow us on Twitter and Facebook at:

twitter.com/TheRedCarpetTV

www.facebook.com/RedCarpetReportTV

www.redcarpetreporttv.com

www.youtube.com/MingleMediaTVNetwork

ABOUT THEWRAP.COM

The Wrap News Inc., has established itself as the leading news organization covering the business of entertainment and media. The Wrap News Inc. is comprised of TheWrap,PowerGrid, PowerGrid Pro and TheGrill. The Wrap News, Inc. is backed by Maveron, a venture capital firm co-founded by Starbucks CEO Howard Schultz and Dan Levitan.

 

For more of Mingle Media TV’s Red Carpet Report coverage, please visit our website and follow us on Twitter and Facebook here:

www.minglemediatv.com

www.facebook.com/minglemediatvnetwork

www.flickr.com/MingleMediaTVNetwork

www.twitter.com/minglemediatv

Follow our host Cathy Kelley on Twitter at twitter.com/CatherineKelley

 

PNNL researchers Michael Kintner-Meyer, Rob Pratt, Tom Secrest, and Kevin Schneider in the Electricity Infrastructure Operations Center (EIOC).

 

Pacific Northwest National Laboratory researchers are exploring how changes in the way the nation's electrical grid is operated can improve its reliability, lower costs and lessen environmental impacts. The focus is on developing real-time tools and supporting their integration into operating systems. We recognize and understand the need for new tools that provide not only a better view of the current power grid, but also faster and more accurate predictions of what might be happening so operators can quickly respond.

 

The Electricity Infrastructure Operations Center (EIOC) at Pacific Northwest National Laboratory brings together industry-leading software, real-time grid data and advanced computation into a fully capable control room. Shaped with input from utilities, technology vendors and researchers across the Northwest, the EIOC serves as a unique platform for researching, developing and deploying technologies to better manage and control the grid. The new technologies developed here will be transferable across the industry and address the national need for a more reliable and effective electricity grid.

 

For more information, visit www.pnl.gov/news

 

Terms of Use: Our images are freely and publicly available for use with the credit line, "Courtesy of Pacific Northwest National Laboratory." Please use provided caption information for use in appropriate context.

Shot through a 1966 Canon FL 50mm f/1.4 lens

Duke Energy - Progress Energy Carolinas coal burning power plant with coal ash ponds at Lake Julian in Arden, North Carolina - © 2013 David Oppenheimer - Performance Impressions Photography Archives

Line of power poles in west central Oklahoma.

www.redcarpetreporttv.com

 

Mingle Media TV and Red Carpet Report host Cathy Kelley were invited to cover TheWrap.com's 5th Annual Pre-Oscar Event at Culina inside the Four Seasons Hotel in Beverly Hills. This event is hosted by CEO & Editor-in-Chief, Sharon Waxman who welcomes Oscar nominees and Hollywood notables to celebrate Awards Season and the Oscars.

 

Get the Story from the Red Carpet Report Team, follow us on Twitter and Facebook at:

twitter.com/TheRedCarpetTV

www.facebook.com/RedCarpetReportTV

www.redcarpetreporttv.com

www.youtube.com/MingleMediaTVNetwork

ABOUT THEWRAP.COM

The Wrap News Inc., has established itself as the leading news organization covering the business of entertainment and media. The Wrap News Inc. is comprised of TheWrap,PowerGrid, PowerGrid Pro and TheGrill. The Wrap News, Inc. is backed by Maveron, a venture capital firm co-founded by Starbucks CEO Howard Schultz and Dan Levitan.

 

For more of Mingle Media TV’s Red Carpet Report coverage, please visit our website and follow us on Twitter and Facebook here:

www.minglemediatv.com

www.facebook.com/minglemediatvnetwork

www.flickr.com/MingleMediaTVNetwork

www.twitter.com/minglemediatv

Follow our host Cathy Kelley on Twitter at twitter.com/CatherineKelley

 

www.redcarpetreporttv.com

 

Mingle Media TV and Red Carpet Report host Cathy Kelley were invited to cover TheWrap.com's 5th Annual Pre-Oscar Event at Culina inside the Four Seasons Hotel in Beverly Hills. This event is hosted by CEO & Editor-in-Chief, Sharon Waxman who welcomes Oscar nominees and Hollywood notables to celebrate Awards Season and the Oscars.

 

Get the Story from the Red Carpet Report Team, follow us on Twitter and Facebook at:

twitter.com/TheRedCarpetTV

www.facebook.com/RedCarpetReportTV

www.redcarpetreporttv.com

www.youtube.com/MingleMediaTVNetwork

ABOUT THEWRAP.COM

The Wrap News Inc., has established itself as the leading news organization covering the business of entertainment and media. The Wrap News Inc. is comprised of TheWrap,PowerGrid, PowerGrid Pro and TheGrill. The Wrap News, Inc. is backed by Maveron, a venture capital firm co-founded by Starbucks CEO Howard Schultz and Dan Levitan.

 

For more of Mingle Media TV’s Red Carpet Report coverage, please visit our website and follow us on Twitter and Facebook here:

www.minglemediatv.com

www.facebook.com/minglemediatvnetwork

www.flickr.com/MingleMediaTVNetwork

www.twitter.com/minglemediatv

Follow our host Cathy Kelley on Twitter at twitter.com/CatherineKelley

 

North Salt Lake City

Taken at Latitude/Longitude:24.568659/80.715019. km (Map link)

Here is the sign from a transformer station in Georgia

Part of the new and improved (last six years or so) Pacific Corp power substation feeding parts of Orem and Pleasant Grove. Provo has a city owned electric utility with a power plant in downtown Provo. HTT

Pacific Northwest National Laboratory researchers are exploring how changes in the way the nation's electrical grid is operated can improve its reliability, lower costs and lessen environmental impacts. The focus is on developing real-time tools and supporting their integration into operating systems. We recognize and understand the need for new tools that provide not only a better view of the current power grid, but also faster and more accurate predictions of what might be happening so operators can quickly respond.

 

The Electricity Infrastructure Operations Center (EIOC) at Pacific Northwest National Laboratory brings together industry-leading software, real-time grid data and advanced computation into a fully capable control room. Shaped with input from utilities, technology vendors and researchers across the Northwest, the EIOC serves as a unique platform for researching, developing and deploying technologies to better manage and control the grid. The new technologies developed here will be transferable across the industry and address the national need for a more reliable and effective electricity grid.

 

For more information, visit www.pnl.gov/news

 

Terms of Use: Our images are freely and publicly available for use with the credit line, "Courtesy of Pacific Northwest National Laboratory." Please use provided caption information for use in appropriate context.

243/365 (3,925)

 

Game night this evening, and at my suggestion, we are playing Power Grid, so I've been genning up on the rules today.

 

As I'm the oldest member of the group, I have an advantage over the others, as this game is heavy on mental arithmatic. Youngsters don't seem have the ability to add numbers in their heads, like us oldens do :))

The Hyderabad Metro is a rapid transit system, serving the city of Hyderabad, Telangana, India. It is in Secant Operational model. It is being implemented entirely on public-private partnership (PPP) basis, with the state government holding a minority equity stake. A 30 km stretch from Miyapur to Nagole, having 24 stations was inaugurated on 28 November 2017 by Prime Minister Narendra Modi. No other rapid transit metro service in India opened for public operations on such a long stretch of 30 km. As of October 2018, it is the second longest operational metro network in India after the Delhi Metro, after a 16 km stretch between Ameerpet-LB Nagar Metro route was opened on 24 September 2018. It is estimated to cost ₹18,800 crore (US$2.6 billion). As of October 2018, about 200,000 people use the Metro per day. Trains are now crowded during the morning and evening hours, when employees travel to and from work. A ladies only coach was introduced on all the trains from 7 May 2018.

 

HISTORY

To respond the rising public transport needs and mitigate escalating vehicular traffic in the twin-cities of Hyderabad and Secunderabad, the State Government and the South Central Railway jointly launched the Multi Modal Transport System (MMTS) in [August] 2003. The increase in population of Hyderabad made MMTS alone insufficient for public transport, which led to Union Ministry of Urban Development giving the nod for the Hyderabad Metro Rail Project and directed the DMRC to conduct a survey on the project.[ this project was seen necessary in view that the population of Hyderabad was forecasted to reach 13.6 million by the year 2021. According to the initial plan, the metro was to be connected with the already existing MMTS to provide commuters with alternate modes of transport. Simultaneously, the proposals for taking up the construction of MMTS Phase-II were also taken forward.

 

On March 26, 2018, Telangana Govt announced that it would set up a SPV "Hyderabad Airport Metro Limited (HAML)", jointly promoted by HMRL and HMDA, to extend the Blue line from Raidurg to Rajiv Gandhi International Airport, Shamshabad.

 

INITIAL BIDDING

The bidding process was completed by July 2008 and awarded to Maytas which failed to achieve financial closure for the project as per schedule By March 2009. In July 2009, the State Government cancelled the contract and called for fresh bids for the project.

 

RE-BIDDING

In the July-2010 rebidding process, Larsen & Toubro (L&T) emerged as the lowest bidder for the ₹121.32 billion (US$1.7 billion) project. L&T came forward to take up the work for about ₹14.58 billion (US$200 million) as viability gap funding as against the sanctioned ₹48.53 billion (US$680 million).

 

MASCOT

The mascot of Hyderabad Metro Rail is Niz. It was derived from the word Nizam, who ruled the princely state of Hyderabad.

 

AWARDS AND NOMINATIONS

HMR project was showcased as one of the top 100 strategic global infrastructure projects at the Global Infrastructure Leadership Forum held in New York during February–March 2013.

 

L&T Metro Rail Hyderabad Limited (LTMRHL) has been conferred the SAP ACE Award 2015 in the 'Strategic HR and Talent Management category.

 

In 2018, Rasoolpura, Paradise and Prakash Nagar metro stations were awarded Indian Green Building Council’s (IGBC) Green MRTS Platinum Award.

 

CONSTRUCTION HISTORY

Groundbreaking (Bhoomi Puja) for the project was conducted on 26 April 2012 the concessionaire started the pillar erection on the same day for Stage-I and on 6 June 2012 for Stage-II. The work for Corridor 2 has been delayed due to traders in Koti and Sultan Bazar demanding realignment of the route to safeguard traders and old age heritage markets. If the recent bill proposed in Parliament which allows construction within a 100 metre radius of heritage structures and sites of historical or archaeological importance is passed, Metro might receive a chance as it helps to connect the Old city with IT corridor.

 

The construction of the entire 71.16 km has been split into 6 stages with the first stage originally scheduled to be completed by March 2015.

 

In November 2013, L&T Hyderabad Metro started laying of rails on the metro viaduct between Nagole and Mettuguda, a stretch of 8 km.

 

The first highly sophisticated train of the Hyderabad Metro Rail (HMR) came from Korea during the third week of May 2014. Stringent trial runs commenced from June 2014 till February 2015. The trial runs started on the Miyapur to Sanjeeva Reddy Nagar stretch in October 2015.

 

CMRS inspection for Stage-II (Miyapur and S.R.Nagar Section) was done on 9, 10 August 2016. Three interchanges are planned at Mahatma Gandhi Bus Terminus, Parade Grounds and Ameerpet.

 

The steel bridge of the HMR was successfully placed over the Oliphant bridge in August 2017.

 

In November 2017, Commissioner of Railway Safety (CMRS) granted safety approval for 12 km stretch from Miyapur to SR Nagar, 10 km stretch from SR Nagar to Mettuguda and 8 km stretch from Nagole to Mettuguda.

 

Ameerpet-LB Nagar Metro stretch is open for commercial operations from 24 September 2018.

 

CONSTRUCTION PHASES

The construction work was undertaken in two phases. There are six stages of completion in Phase I

 

PHASE I

The Phase I of the project includes 3 lines covering a distance of around 72 km. The metro rail stretches between Nagole and Secunderabad 11 km originally scheduled to be operational by December 2015, is now partially operational since 29 November 2017. The entire 72 km 57-station first phase is due to be completed by December 2019 with Hitec City - Raidurg line and MGBS - Falaknuma line is scheduled to be completed by December 2019.

 

Line 1 - Red Line - Miyapur – L B Nagar - 29.2 km

Line 2 - Green Line - JBS - Falaknuma 15 km

Line 3 - Blue Line - Nagole – Raidurg - 28 km

 

PHASE II

The Government is planning second phase of metro rail extending further. The construction of Phase II will be taken up solely by the state government, instead of public private partnership (PPP) mode in Phase I. Delhi Metro Rail Corporation (DMRC) was entrusted to give a detailed project report (DPR) for Phase II. Metro Rail Phase II expansion plan is for about 60 km, which includes providing link to Shamshabad RGI Airport.

 

LINES

Since the first version of the plans, the three corridors mostly remained the same, but minor changes were introduced. These include the lack of stop at Lalaguda, or a stop at Lakdikapul instead of Secretariat. Also, the lines have been marked with several different combination of color. Ameerpet- LB Nagar metro stretch opened on 24 September 2018. HiTec City to Raidurg, 1.5-kilometre stretch on Corridor Three - Nagole to Raidurg, is scheduled to be completed in November 2019, as it involves construction of 49 pillars and the Raidurg terminal station. Efforts are being made to complete the 8.5-km stretch from Ameerpet to HiTec City by December 2018.

 

RECEPTION

The Metro has opened to overwhelming response, with over 200,000 people using it on Day 1. On the first Sunday of operations, the Metro was used by 240,000 people.. As of September 2018, the daily ridership was about 2,00,000.

 

Trains are initially being operated at a frequency of 3.5 minutes in very peak hours and every 6.5 minutes in peak hours (between Miyapur-Ameerpet) and 6.5 minutes in peak hours (between Ameerpet-Nagole),, though maximum achievable frequency is every 90 seconds. Similarly, three-car trains are being used currently, though it is planned to use six-car trains in the future.

 

In December 2017, Hyderabad Metro Rail launched its mobile app, TSavaari. Hyderabad Metro timings are available on T-Savari app. Ola Cabs and Uber tied up its services with app.

 

COST

The initial official estimated cost of the 72 km long Metro project stood at ₹14,132 crore (US$2.0 billion). The Central Government decided to bear 10% of it, while L&T was to bear the remaining 90% of the cost. The construction work which was supposed to commence on 3 March 2011 commenced in 2012. In March 2012, the cost of the project was revised upwards to ₹15,957 crore (US$2.2 billion). This has been further revised upwards to ₹18,800 crore (US$2.6 billion) (as of November 2017).

 

INFRASTRUCTURE

The 71.3 km standard-gauge network will feature ballastless track throughout and will be electrified at 25kV ac 50 Hz. An operations control centre and depot are constructed at Uppal. At some places, a flyover, underpass and metro has been constructed at the same place, as part of Strategic road development plan (SRDP).

 

CBTC TECHNOLOGY

At the end of 2012, L&T Metro Rail awarded Thales a Rs 7.4bn ($US 134m) contract to provide CBTC and integrated telecommunications and supervision systems on all three lines. Thales will supply its SelTrac CBTC technology, and trains will initially run in automatic train operation mode with minimum headways of 90 seconds, although the system will support eventual migration to unattended train operation (UTO).

 

ROLLING STOCK

On 12 September 2012, Larsen and Toubro Metro Rail Hyderabad Ltd (LTMRHL) announced that it has awarded tender for supply of rolling stock to Hyundai Rotem. The ₹18 billion (US$250 million) tender is for 57 trains consisting of 171 cars which will be delivered in phases at least 9 months before the commencement of each stage. On 2 October 2013, LTMRHL unveiled its train car for Hyderabad Metro. A model coach which is half the size of the actual coach, was on public display at Necklace Road on the banks of Hussain Sagar in the heart of Hyderabad. The trains will be 3.2m wide and 4m high. There will be 4 doors on each side of each coach.

 

On 10 April 2014, the first metro train for HMR rolled out of Hyundai Rotem factory at Changwon in South Korea and reached Hyderabad in May 2014. On 31 December 2014, Hyderabad Metro Rail successfully conducted a training run in Automatic Train Operation (ATO) mode for the first time between Nagole and Mettuguda.

 

TICKETING

The L&T Hyderabad project will have an automated ticketing system with features such as contactless smart card based ticketing, slim automatic gates, payment by cash and credit/debit card, passenger operated ticket vending machine and provision of common ticketing system. It will also have a provision of NFC-based technology to enable usage of mobile phones as fare media and high performance machine to avoid long queues. Samsung Data Systems India, a subsidiary of South Korean firm Samsung, has been awarded the automatic fare collection system package for the L&T metro rail project. The package involves design, manufacture, supply, installation, testing and commissioning of the system.

 

Official ticket prices were announced on 25 November 2017. The base fare is ₹10 for up to 2 km and going to slap 10 with ₹60 for more than 26 km.

 

STATIONS

Hyderabad metro will have 64 stations in phase I. They will be provided with amenities such as escalators and elevators to reach the stations, announcement boards, electronic display systems among others for passengers. Commercial will also be provided on stations. Hyderabad metro stations will also have service roads underneath them to provide last mile connectivity by allowing other public transportation systems use it for dropping/picking passengers right in front of the stations and ensure uninterrupted traffic. Currently the service lane works are currently on at Nagole and Uppal stations. The signboards of Hyderabad Metro are displayed in Telugu, English, Hindi and Urdu at metro stations.

 

Otis Elevator Company of United States won the contract to supply and maintain 670 elevators.

 

In May 2018, L&T Metro Rail announced that it had signed a contract with Powergrid Corporation of India to install electric vehicle charging facilities at all metro stations beginning with Miyapur and Dr. B R Ambedkar Balanagar stations. L&THMRL has setup free wifi access units for commuters at Miyapur, Ameerpet and Nagole metro stations, in association with ACT Fibernet, as part of a pilot project.

 

WIKIPEDIA

The report "National Power Grid Simulation Capability: Needs and Issues" examines shortcomings in the nation's current capabilities for simulating the national power grid. The report details findings of a December 2008 conference, hosted at the U.S. Depaertment of Energy's Argonne National Laboratory and sponsored by the U.S. Department of Homeland Security's Science and Technology Directorate. Read the full story.

Electric power transmission lines run right through the heart of the Patuxent Research Refuge, in Laurel, Maryland. You can walk right up to the towers in one area - they're huge.

Boardgame Night - Friday, Feb 10th of 2012

 

* See me on twitter or on tumblr.

1 2 ••• 5 6 8 10 11 ••• 59 60